Letter Sequence Approval |
---|
|
|
MONTHYEARML0307103082003-03-25025 March 2003 Environmental Assessment, Exemption from 10CFR50.44(F) for the Post Accident Containment Ventilation System Project stage: Approval ML0307103722003-04-0202 April 2003 Exemption Request, Post Accident Containment Ventilation System Project stage: Other 2003-03-25
[Table View] |
|
---|
Category:Environmental Assessment
MONTHYEARML22215A0982022-10-25025 October 2022 Environmental Assessment and Finding of No Significant Impact ML20274A0002020-11-0505 November 2020 Letter with Environmental Assessment and Finding of No Significant Impact Use of Decommissioning Trust Funds for Spent Fuel Management and Site Restoration ML20274A0012020-11-0505 November 2020 Federal Register Notice: Environmental Assessment and Finding of No Significant Impact and Exemption ML20183A1332020-06-30030 June 2020 Jones Day to NRC, Sturgeon Monitoring Under the 2013 Biological Opinion/Incidental Take Statement in Connection with Indian Point Include the 2018 Amendment NRC-2015-0246, Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests2015-12-0808 December 2015 Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests ML15320A2762015-12-0808 December 2015 Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests ML15182A0152015-10-22022 October 2015 Draft Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests (CAC Nos. MF2603 - MF2605 and MF2637 - MF2639) ML15182A0172015-10-22022 October 2015 Draft Environmental Assessment (TAC Nos. MF2603-MF2605 and MF2637 - MF2639) ML13203A1452013-08-27027 August 2013 Final Appendix for Publication 7 19 13 - Indian Point Nuclear Generating Unit 3 - Issue of Environmental Assessment and Finding of No Significant Impact Resulting from Ruling from Second Circuit U.S. Court of Appeals ML13203A1332013-08-19019 August 2013 Issue of Environmental Assessment and Finding of No Significant Impact Resulting from Ruling from Second Circuit U.S. Court of Appeals ML13203A1382013-08-19019 August 2013 Final EA Notice for Indian Point Nuclear Generating Unit 3 - Issue of Environmental Assessment and Finding of No Significant Impact Resulting from Ruling from Second Circuit U.S. Court of Appeals ML1207405612012-07-0505 July 2012 Environmental Assessment and Finding of No Significant Impact ML1207405502012-07-0505 July 2012 Environmental Assessment and Finding of No Significant Impact (TAC Nos. ME1671, ME1672, and L24299) NRC-2012-0168, Environmental Assessment and Finding of No Significant Impact2012-07-0505 July 2012 Environmental Assessment and Finding of No Significant Impact ML0726301932007-01-31031 January 2007 Enclosure 7: Environmental Assessment Direct Final Rule - HI-STORM 100, Amend. 4 - to Amend 10 CFR Part 72 List of Approved Spent Fuel Storage Casks ML0332900152003-11-24024 November 2003 Environmental Assessment and Finding of No Significant Impact for a Proposed Exemption from Requirements of 10 CFR 50.60(a) ML0307103082003-03-25025 March 2003 Environmental Assessment, Exemption from 10CFR50.44(F) for the Post Accident Containment Ventilation System ML0224102312002-08-28028 August 2002 Environmental Assessment, Definition of Total Effective Dose Equivalent ML0203600982002-02-11011 February 2002 Environmental Assessment and Finding of No Significant Impact for a Proposed Exemption from the Requirements of 10 CFR 50.60 (a) 2022-10-25
[Table view] Category:Federal Register Notice
MONTHYEARML22313A0952022-12-0101 December 2022 Staffing Technical Specification License Amendment Federal Register Notice ML22313A0102022-12-0101 December 2022 Cyber Security License Amendment Federal Register Notice ML22217A0152022-11-0909 November 2022 FRN: Holtec Decommissioning International, LLC, Indian Point Energy Center, Independent Spent Fuel Storage Installation ML22215A0992022-10-26026 October 2022 Environmental Assessment and Finding of No Significant Impact Federal Register Notice ML21356B4982022-02-14014 February 2022 FRN - Indian Point Exemption Request 10 CFR Part 20 Appendix G ML21356B4972022-02-14014 February 2022 Enclosure - Indian Point Exemption Request 10 CFR Part 20 Appendix G ML21181A0282021-07-12012 July 2021 Individual Federal Register Notice, Notification of Public Meeting for Public Comments on Post-Shutdown Decommissioning Activities Report ML21162A0022021-06-15015 June 2021 Individual Federal Register Notice, Notification of the Availability of the Post-Shutdown Decommissioning Activities Report ML21162A0012021-06-15015 June 2021 Transmittal Letter, Notification of the Availability of the Post-Shutdown Decommissioning Activities Report in the Federal Register ML20309A7812020-11-23023 November 2020 Exemption from 10 CFR 50.82 and 10 CFR 50.75 ML20297A3602020-11-23023 November 2020 Federal Register Notice for Order Approving Transfer of Facility Operating Licenses to Holtec International, Owner, and Holtec Decommissioning International, LLC, Operator ML20309A7852020-11-23023 November 2020 Federal Register Notice for Exemption from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) for Holtec Decommissioning International, LLC ML20274A0002020-11-0505 November 2020 Letter with Environmental Assessment and Finding of No Significant Impact Use of Decommissioning Trust Funds for Spent Fuel Management and Site Restoration ML20274A0012020-11-0505 November 2020 Federal Register Notice: Environmental Assessment and Finding of No Significant Impact and Exemption ML20236K1302020-09-29029 September 2020 Federal Register Notice Partial Exemption from Record Retention Requirements ML20177A6452020-07-15015 July 2020 FRN - Notice of Issuance of Multiple Exemptions Regarding Various Parts of 10 CFR Due to COVID-19 Impacts for June 2020 ML20109A0032020-04-22022 April 2020 FRN - Indian Point Nuclear Generating Unit Nos. 2 and 3 - Exemption from the Requirements of 10 CFR Part 50, Appendix R, Section Iii.H, Related to Fire Brigade Annual Physical Examinations ML20024F0532020-02-13013 February 2020 Extension of Comment Period Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments ML20024F0632020-02-11011 February 2020 Extension of Comment Period for Notice of Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments and Opportunity for a Hearing ML20006E1222020-01-15015 January 2020 Individual Federal Register Notice for Consideration of Approval of Transfer of Licenses and Conforming Amendments ML20003D0892020-01-13013 January 2020 Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing ML20003D0882020-01-13013 January 2020 Letter with Individual Notice of Consideration of Issuance of Amendment to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing ML19085A2172019-03-29029 March 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 04/09/2019 ML18211A5782018-09-17017 September 2018 Federal Register Notice - Announcing the Issuance of the Indian Point Renewed Licenses ML18096B3972018-05-16016 May 2018 Federal Register Notice for Issuance of Supplement 2 to the Indian Point Final Environmental Impact Statement for License Renewal NRC-2017-0238, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 20182017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17353A1922017-12-21021 December 2017 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: January 2, 2018 ML17065A0292017-04-13013 April 2017 OEDO-16-00411: Federal Register Notice Final Director'S Decision Under 10 CFR 2.206 NRC-2017-0074, OEDO-16-00411: Federal Register Notice Final Director'S Decision Under 10 CFR 2.2062017-04-13013 April 2017 OEDO-16-00411: Federal Register Notice Final Director'S Decision Under 10 CFR 2.206 ML16336A5002017-01-27027 January 2017 Federal Register Notice of Issuance of Order for Mta Transfer of Indian Pt 3 and FitzPatrick to Entergy Nuclear Operations, Inc. NRC-2017-0015, Federal Register Notice of Issuance of Order for Mta Transfer of Indian Pt 3 and FitzPatrick to Entergy Nuclear Operations, Inc. (CAC Nos. MF8286 and MF8287)2017-01-27027 January 2017 Federal Register Notice of Issuance of Order for Mta Transfer of Indian Pt 3 and FitzPatrick to Entergy Nuclear Operations, Inc. (CAC Nos. MF8286 and MF8287) NRC-2016-0202, Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 20162016-09-19019 September 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 ML16257A5172016-09-19019 September 2016 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: September 27, 2016 ML16231A1402016-09-0707 September 2016 OEDO-16-00411: Acknowledgement Letter for Petitioner Lochbaum Concerning the Reactor Vessel Baffle-Former Bolt Degradation Identified During the Spring 2016 Refueling Outage at Indian Point Nuclear Generating Unit 2 NRC-2016-0197, OEDO-16-00411: Federal Register Notice Regarding 10 CFR 2.206 Petition for Indian Point Nuclear Generating, Unit No. 22016-09-0707 September 2016 OEDO-16-00411: Federal Register Notice Regarding 10 CFR 2.206 Petition for Indian Point Nuclear Generating, Unit No. 2 ML16231A1442016-09-0707 September 2016 OEDO-16-00411: Federal Register Notice Regarding 10 CFR 2.206 Petition for Indian Point Nuclear Generating, Unit No. 2 ML16119A4662016-04-28028 April 2016 Federal Register Notice: 05/04/16 - Short Notice ML16061A3012016-03-0202 March 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: March 15, 2016 ML16004A1182016-01-0707 January 2016 FRN, Issuance of Confirmatory Orders, Authorize Use of Preemption Authority Granted Under Provisions of Section 161A of the Atomic Energy Act of 1954, as Amended ML15329A0822015-12-21021 December 2015 FRN, Notice of Availability of Draft Supplement to Supplement 38 to the GEIS ML15320A2722015-12-0808 December 2015 Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests ML15320A2762015-12-0808 December 2015 Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests NRC-2015-0246, Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests2015-12-0808 December 2015 Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests ML15182A0152015-10-22022 October 2015 Draft Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests (CAC Nos. MF2603 - MF2605 and MF2637 - MF2639) ML15182A0172015-10-22022 October 2015 Draft Environmental Assessment (TAC Nos. MF2603-MF2605 and MF2637 - MF2639) ML15204A2792015-07-27027 July 2015 Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 4, 2015 ML15190A0362015-07-22022 July 2015 Federal Register Notice Withdrawal of an Amendment Request ML15148A3762015-06-0101 June 2015 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Published June 9, 2015 NRC-2015-0123, Application and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for2015-05-20020 May 2015 Application and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Acce ML15125A4952015-05-20020 May 2015 Application and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures for Acce 2022-02-14
[Table view] Category:Finding of No Significant Impact
MONTHYEARML20274A0012020-11-0505 November 2020 Federal Register Notice: Environmental Assessment and Finding of No Significant Impact and Exemption ML20274A0002020-11-0505 November 2020 Letter with Environmental Assessment and Finding of No Significant Impact Use of Decommissioning Trust Funds for Spent Fuel Management and Site Restoration ML15320A2762015-12-0808 December 2015 Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests NRC-2015-0246, Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests2015-12-0808 December 2015 Final Environmental Assessment and Finding of No Significant Impact Related to Preemption Authority Requests ML15182A0172015-10-22022 October 2015 Draft Environmental Assessment (TAC Nos. MF2603-MF2605 and MF2637 - MF2639) ML13203A1452013-08-27027 August 2013 Final Appendix for Publication 7 19 13 - Indian Point Nuclear Generating Unit 3 - Issue of Environmental Assessment and Finding of No Significant Impact Resulting from Ruling from Second Circuit U.S. Court of Appeals ML13203A1382013-08-19019 August 2013 Final EA Notice for Indian Point Nuclear Generating Unit 3 - Issue of Environmental Assessment and Finding of No Significant Impact Resulting from Ruling from Second Circuit U.S. Court of Appeals ML13203A1332013-08-19019 August 2013 Issue of Environmental Assessment and Finding of No Significant Impact Resulting from Ruling from Second Circuit U.S. Court of Appeals ML0726301932007-01-31031 January 2007 Enclosure 7: Environmental Assessment Direct Final Rule - HI-STORM 100, Amend. 4 - to Amend 10 CFR Part 72 List of Approved Spent Fuel Storage Casks ML0332900152003-11-24024 November 2003 Environmental Assessment and Finding of No Significant Impact for a Proposed Exemption from Requirements of 10 CFR 50.60(a) ML0307103082003-03-25025 March 2003 Environmental Assessment, Exemption from 10CFR50.44(F) for the Post Accident Containment Ventilation System ML0224102312002-08-28028 August 2002 Environmental Assessment, Definition of Total Effective Dose Equivalent ML0203600982002-02-11011 February 2002 Environmental Assessment and Finding of No Significant Impact for a Proposed Exemption from the Requirements of 10 CFR 50.60 (a) 2020-11-05
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 And 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 And Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC – NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] |
Text
March 25, 2003 Mr. Michael Kansler Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 - (TAC NO. MB6484)
Dear Mr. Kansler:
Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for an exemption dated October 3, 2002, as supplemented on January 16 and March 11, 2003. The proposed exemption would eliminate licensing basis requirements for the post accident containment ventilation system.
The assessment is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Patrick Milano, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-286
Enclosure:
Environmental Assessment cc w/encl: See next page
March 25, 2003 Mr. Michael Kansler Senior Vice President and Chief Operating Officer Entergy Nuclear Operations, Inc.
440 Hamilton Avenue White Plains, NY 10601
SUBJECT:
INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 - (TAC NO. MB6484)
Dear Mr. Kansler:
Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for an exemption dated October 3, 2002, as supplemented on January 16 and March 11, 2003. The proposed exemption would eliminate licensing basis requirements for the post accident containment ventilation system.
The assessment is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Patrick Milano, Senior Project Manager, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-286
Enclosure:
Environmental Assessment cc w/encl: See next page DISTRIBUTION:
PUBLIC S. Little W. Beckner B. Platchek, RI PDI R/F D. Cullison R. Pulsifer ACRS S. Richards J. Tappert P. Milano OGC R. Laufer Accession Number: ML030710308 *Concurred via e-mail OFFICE PDI-2\PM PDI-1\PM PDI-1\LA* RLEP OGC PDI-1\SC NAME RPulsifer PMilano SLittle JTappert SCole RLaufer DATE 03/14/03 03/14/03 03/25/03 03/17/03 03/24/03 03/25/03 Official Record Copy
Indian Point Nuclear Generating Unit No. 3 cc:
Mr. Jerry Yelverton Mr. Harry P. Salmon, Jr.
Chief Executive Officer Director of Oversight Entergy Operations Entergy Nuclear Operations, Inc.
1340 Echelon Parkway 440 Hamilton Avenue Jackson, MS 39213 White Plains, NY 10601 Mr. Robert J. Barrett Mr. James Comiotes Vice President - Operations Director, Nuclear Safety Assurance Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
Indian Point Nuclear Generating Unit 3 Indian Point Nuclear Generating Unit 3 295 Broadway, Suite 3 295 Broadway, Suite 3 P. O. Box 308 P.O. Box 308 Buchanan, NY 10511-0308 Buchanan, NY 10511-0308 Mr. Dan Pace Mr. John McCann Vice President Engineering Manager, Licensing and Regulatory Affairs Entergy Nuclear Operations, Inc. Entergy Nuclear Operations, Inc.
440 Hamilton Avenue Indian Point Nuclear Generating Unit 2 White Plains, NY 10601 295 Broadway, Suite 1 P. O. Box 249 Mr. James Knubel Buchanan, NY 10511-0249 Vice President Operations Support Entergy Nuclear Operations, Inc. Resident Inspectors Office 440 Hamilton Avenue U.S. Nuclear Regulatory Commission White Plains, NY 10601 295 Broadway, Suite 3 P.O. Box 337 Mr. Joseph DeRoy Buchanan, NY 10511-0337 General Manager Operations Entergy Nuclear Operations, Inc. Regional Administrator, Region I Indian Point Nuclear Generating Unit 3 U.S. Nuclear Regulatory Commission 295 Broadway, Suite 3 475 Allendale Road P. O. Box 308 King of Prussia, PA 19406 Buchanan, NY 10511-0308 Mr. John M. Fulton Mr. John Kelly Assistant General Counsel Director - Licensing Entergy Nuclear Operations, Inc.
Entergy Nuclear Operations, Inc. 440 Hamilton Avenue 440 Hamilton Avenue White Plains, NY 10601 White Plains, NY 10601 Ms. Stacey Lousteau Ms. Charlene Faison Treasury Department Licensing Entergy Services, Inc.
Entergy Nuclear Operations, Inc. 639 Loyola Avenue 440 Hamilton Avenue Mail Stop: L-ENT-15E White Plains, NY 10601 New Orleans, LA 70113
Indian Point Nuclear Generating Unit No. 3 cc:
Mr. William M. Flynn, President Mr. Ronald Schwartz New York State Energy, Research, and SRC Consultant Development Authority 64 Walnut Drive 17 Columbia Circle Spring Lake Heights, NJ 07762 Albany, NY 12203-6399 Mr. Ronald J. Toole Mr. J. Spath, Program Director SRC Consultant New York State Energy, Research, and Toole Insight Development Authority 605 West Horner Street 17 Columbia Circle Ebensburg, PA 15931 Albany, NY 12203-6399 Mr. Charles W. Hehl Mr. Paul Eddy SRC Consultant Electric Division Charles Hehl, Inc.
New York State Department 1486 Matthew Lane of Public Service Pottstown, PA 19465 3 Empire State Plaza, 10th Floor Albany, NY 12223 Mr. Alex Matthiessen Executive Director Mr. Charles Donaldson, Esquire Riverkeeper, Inc.
Assistant Attorney General 25 Wing & Wing New York Department of Law Garrison, NY 10524 120 Broadway New York, NY 10271 Mr. Paul Leventhal The Nuclear Control Institute Mayor, Village of Buchanan 1000 Connecticut Avenue NW 236 Tate Avenue Suite 410 Buchanan, NY 10511 Washington, DC, 20036 Mr. Ray Albanese Mr. Karl Copeland Executive Chair Pace Environmental Litigation Clinic Four County Nuclear Safety Committee 78 No. Broadway Westchester County Fire Training Center White Plains, NY 10603 4 Dana Road Valhalla, NY 10592 Jim Riccio Greenpeace 702 H Street, NW Suite 300 Washington, DC 20001
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION ENTERGY NUCLEAR OPERATIONS, INC.
DOCKET NO. 50-286 INDIAN POINT NUCLEAR GENERATING UNIT NO. 3 ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption from certain requirements of Title 10 of the Code of Federal Regulations (CFR)
Section 50.44, Standards for combustible gas control system in light-water-cooled power reactors, for Facility Operating License No. DPR-64, issued to Entergy Nuclear Operations, Inc. (ENO or licensee), for operation of the Indian Point Nuclear Generating Unit No. 3 (IP3) located in Westchester County, Buchanan, New York. The exemption would permit removal of the backup post accident containment ventilation (PACV) system for IP3. Therefore, as required by 10 CFR 51.21, the NRC is issuing this environmental assessment and finding of no significant impact.
ENVIRONMENTAL ASSESSMENT Identification of the Proposed Action:
Section 50.44 of 10 CFR sets out requirements for the control of the hydrogen generated after a postulated loss-of-coolant accident (LOCA). The hydrogen control system at IP3 includes the PACV system. The proposed action would allow the licensee to remove the PACV system from the IP3 licensing basis. A planned retirement of the PACV system would occur during Refueling Outage 12, in the spring of 2003. The proposed action is in accordance
with ENOs request for an exemption, dated October 3, 2002, as supplemented on January 16 and March 11, 2003.
The Need for the Proposed Action:
The proposed exemption from the requirements pertaining to the hydrogen purge system and the associated removal from the licensing basis, would simplify the Severe Accident Management Guidelines and prevent the need to restore or maintain the PACV system with its accompanying cost and exposure. The capping of the piping for the PACV system containment penetrations also eliminates the need to verify the containment isolation valves in this system are operable.
Environmental Impacts of the Proposed Action:
The NRC has completed its evaluation of the proposed action and concludes, as set forth below, that there are no significant environmental impacts associated with the removal of the PACV system from the IP3 licensing basis.
The proposed action will not significantly increase the probability or consequences of accidents, no changes are being made in the types or quantities of effluents that may be released off-site, and there is no significant increase in occupational or public radiation exposure since there is no change to facility operations that could create a new or affect a previously analyzed accident or release path. Therefore, there are no significant radiological environmental impacts associated with the proposed action.
With regard to potential non-radiological impacts, the proposed action does not have a potential to affect any historic sites. It does not affect non-radiological plant effluents and has no other environmental impact. Therefore, there are no significant non-radiological environmental impacts associated with the proposed action.
Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action.
Environmental Impacts of the Alternatives to the Proposed Action:
As an alternative to the proposed action, the staff considered denial of the proposed action (i.e., the no-action alternative). Denial of the application would result in no changes in current environmental impacts. The environmental impacts of the proposed action and the alternative action are similar.
Alternative Use of Resources:
The action does not involve the use of any different resources than those previously considered in the Final Environmental Statement for IP3, dated February 1975.
Agencies and Persons Consulted:
On March 14, 2003, the staff consulted with the New York State official, Mr. John Spath of the New York State Energy Research and Development Authority, regarding the environmental impact of the proposed action. The State official had no comments.
FINDING OF NO SIGNIFICANT IMPACT On the basis of the environmental assessment, the NRC concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the NRC has determined not to prepare an environmental impact statement for the proposed action.
For further details with respect to the proposed action, see the licensees letter dated October 3, 2002, as supplemented by letters dated January 16 and March 11, 2003.
Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, Public File Area O1 F21, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html.
Persons who do not have access to ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 25th day of March 2003.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
Richard J. Laufer, Chief, Section 1 Project Directorate I Division of Licensing Project Management Office of Nuclear Reactor Regulation