ML030700580
| ML030700580 | |
| Person / Time | |
|---|---|
| Site: | Seabrook |
| Issue date: | 02/28/2003 |
| From: | Peschel J Florida Power & Light Energy Seabrook |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NYN-03022 | |
| Download: ML030700580 (1) | |
Text
0 FPL Energy Seabrook Station FPL Energy Seabrook Station P.O. Box 300 Seabrook, NH 03874 (603) 773-7000 February 28, 2003 Docket No. 50-443 NYN-03022 U.S. Nuclear Regulatory Commission Attn.: Document Control Desk Washington, DC 20555-0001 Seabrook Station 2002 Annual Report of Removable Contamination from Sealed Source or Fission Detector Seabrook Station Technical Specification 4.7.8.3 requires a report be prepared and submitted if sealed source or fission detector leakage tests reveal the presence of greater than or equal to 0.005 microCurie of removable contamination.
In accordance with this requirement, FPL Energy Seabrook, LLC hereby reports that during 2002, there were no leaking sources.
Should you have any questions, please contact Mr. William T. Cash, Health Physics Department Manager, at (603) 773-7315.
Very truly yours, FPL Energy Seabrook, LLC Manager cc:
H. J. Miller, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector
((O11