ML030700167
| ML030700167 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 03/07/2003 |
| From: | NRC/NRR/DLPM |
| To: | |
| References | |
| TAC MB4694 | |
| Download: ML030700167 (2) | |
Text
Primary Containment-Operating 3.6.1.1 3.6 CONTAINMENT SYSTEMS 3.6.1.1 Primary Containment-Operating LCO 3.6.1.1 Primary containment shall be OPERABLE.
APPLICABILITY:
MODES 1. 2. and 3.
ACTIONS
-NOTE-
-N O T E......
Applicable Conditions and Required Actions are not required to be entered for the Inclined Fuel Transfer System (IFTS) penetration for up to 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> per 12 month period when the IFTS blind flange is unbolted.
CONDITION REQUIRED ACTION COMPLETION TIME A. Primary containment A.1 Restore primary 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> inoperable, containment to OPERABLE status.
B. Required Action and B.1 Be in MODE 3.
12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.
AND B.2 Be in MODE 4.
36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> Amendment No. 123 PERRY - UNIT 1 3.6-1
PCIVs 3.6.1.3 SURVEILLANCE REQUIREMENTS (continued)
SURVEILLANCE SR 3.6.1.3.4 NOTES -----------------
- 1.
Only required to be met in MODES 1, 2, and 3.
- 2.
Valves and blind flanges in high radiation areas may be verified by use of administrative means.
- 3.
Not required to be met for PCIVs that are open under administrative controls.
- 4.
Not required to be met for the Inclined Fuel Transfer System (IFTS) penetration when the associated primary containment blind flange is removed, provided that the Fuel Handling Building Fuel Transfer Pool water level is maintained Ž 40', the upper containment pool water level is
Ž 22 ft 9 inches above the reactor pressure vessel flange and the suppression pool water level is maintained at Ž 17 ft 11.7 inches, the fuel transfer and storage pool supply isolation valve is closed, the upper ool IFTS gate is installed, and the FTS transfer tube drain valve remains closed.
The IFTS transfer tube drain valve may be opened under administrative controls.
Removal of the IFTS blind flange shall not exceed 60 days per cycle while in MODES 1. 2.
or 3.
Verify each primary containment isolation manual valve and blind flange that is located inside primary containment, drywell. or steam tunnel and is required to be closed during accident conditions is closed.
FREQUENCY I.
Prior to entering MODE 2 or from MODE if not performed within the previous 92 days j _____________1______________
(continued)
PERRY - UNIT 1 Amendment No. 123 3
1.
SURVEILLANCE REQUIREMENTS (continued) 3.6-16a