Tom Gurdziel Letter Number 8 Davis-Besse IMC0350 Oversight Panel Activities
ML030690643
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/04/2002
From: Tom Gurdziel
- No Known Affiliation
To: Grobe J
Division of Reactor Safety III
References
Download: ML030690643 (1)


Text

9 Twin Orchard Drive Oswego, NY 13126 October 4, 2002 Mr. John A. Grobe, Director Division of Reactor Safety US Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351

Dear Mr. John A. Grobe:

I think it might be important to consider the tube rolling process that was used at the Davis-Besse PWR. As I recall the description, the tube rolling device was being removed from a CRDM tube (nozzle), in a not-perfectly-vertical movement. The lateral part of the movement caused displacement of the CRDM tube into a reactor head cavity.

What were the specified conditions for acceptance of tube rolling? Specifically, was the tube rolling device being removed because it had successfully met the imposed requirements? If so, a tube rolled against nothing was able to meet the imposed quality requirements and there is something seriously wrong.

Also, are there any penetrations at the bottom of the reactor vessel that were rolled (at any time) using the same method and quality requirements?

This is my eighth letter. It needs no reply.

61ýz n ou, Tom Gurdziel Copy: D. Lochbaum OCT 0 8 20