Similar Documents at Hatch |
---|
Category:Letter
MONTHYEARIR 05000321/20230042024-01-31031 January 2024 Integrated Inspection Report 05000321/2023004 and 05000366/2023004 NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. ML24012A0652024-01-30030 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) IR 05000321/20233012024-01-17017 January 2024 NRC Operator License Examination Report 05000321/2023301 and 05000366/2023301 ML23341A2042024-01-12012 January 2024 Request for Additional Information Exemption Requests for Physical Barriers (EPID L-2023-LLE-0018 & L-2023-LLE-0021) ML23345A1312024-01-0303 January 2024 Withholding Letter - SNC Fleet - Physical Barriers Exemption (L-2023-LLE-0018 and L-2023-LLE-0021) NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems IR 05000321/20234022023-11-29029 November 2023 Security Baseline Inspection Report 05000321/2023402, 05000366/2023402, and 07200036/2023401 NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal IR 05000321/20230112023-11-17017 November 2023 Biennial Problem Identification and Resolution Inspection Report 050003212023011 and 050003662023011 ML23324A4472023-11-14014 November 2023 302 Exam Approval Letter IR 05000321/20230032023-11-0202 November 2023 Integrated Inspection Report 05000321/2023003, and 05000366/2023003 IR 05000321/20234032023-10-26026 October 2023 Cyber Security Inspection Report 05000321/2023403 and 05000366/2023403 IR 05000321/20234012023-10-17017 October 2023 Security Baseline Inspection Report 05000321 2023401 and 05000366 2023401 ML23250A0472023-09-20020 September 2023 Request for Additional Information Regarding License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts in Technical Specifications Table 1.1-1, Modes ML23241B0212023-09-12012 September 2023 Review of Quality Assurance Topical Report IR 05000321/20230052023-08-27027 August 2023 Updated Inspection Plan for Edwin I. Hatch Nuclear Plant, Units 1 & 2 - Report 05000321/2023005 and 05000366/2023005 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 IR 05000321/20230022023-08-0808 August 2023 Integrated Inspection Report 07200036/2023001, 05000321/2023002, and 05000366/2023002 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis ML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23201A0292023-07-20020 July 2023 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement ML23178A0012023-06-27027 June 2023 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000321 2023403 and 05000366 2023403 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use IR 05000321/20230102023-06-0909 June 2023 Focused Engineering Inspection Report 05000321 2023010 and 05000366 2023010 NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. ML23136B2942023-05-19019 May 2023 Summary of May 02, 2023, Observation Public Meeting Held with Southern Nuclear Operating Company, Inc., Regarding a LAR for the Reactor Pressure Vessel Head Closure Bolts for Edwin I. Hatch Nuclear Plant, Units 1 and 2 NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 ML23123A2222023-05-0101 May 2023 Notification of Licensed Operator Initial Examination 05000321/2023301, and 05000366/2023301 IR 05000321/20230012023-04-26026 April 2023 Integrated Inspection Report 05000321/2023001 and 05000366/2023001 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal ML23065A1092023-03-0808 March 2023 Correction of Relief Request HNP-ISI-RR-05-02 Allowing to Continue Operation with a Flaw Indication on One Reactor Pressure Vessel Closure Bolt Until December 31, 2025 ML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program IR 05000321/20220062023-03-0101 March 2023 Annual Assessment Letter Edwin I. Hatch Nuclear Plant, Units 1 and 2 - NRC Inspection Report 05000321/2022006 and 05000366/2022006 NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 2024-01-31
[Table view] Category:License-Operating (New/Renewal/Amendments) DKT 50
MONTHYEARML23053A2182023-03-0303 March 2023 Correction of Amendment Nos. 321 and 266 Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 ML23018A0042023-01-24024 January 2023 Correction of Amendment Nos. 319 and 264 Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF ML22297A1462022-12-22022 December 2022 Issuance of Amendments Nos. 319 and 264, Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITS ML22325A3472022-11-23023 November 2022 Correction of Amendment Nos. 318 and 263 Issuance of Amendment Nos. 318 and 263, Regarding LAR to Revise TSTF-227 and TSTF-297 ML22293A0302022-11-0707 November 2022 Amendments 318 & 263 Issuance, Regarding LAR to Adopt TSTF-227, Revision to EOC-RPT Pump Actions, and TSTF-297, ATWS-RPT (EPID L-2021-LLA- 0227) ML22192A1172022-09-0202 September 2022 Issuance of Amendments Nos. 317 & 262, Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-207-A, Completion Time for Restoration of Various Excessive Leakage Rates ML22192A1992022-08-19019 August 2022 Issuance of Amendments Nos. 316 and 261, Regarding Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22101A0942022-05-20020 May 2022 Issuance of Amendments Nos. 315 and 260, Regarding Request to Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21264A6442021-09-24024 September 2021 Issuance of Amendment to Revise Technical Specification 3.7.2, Plant Service Water (Psw) System and Ultimate Heat Sink (UHS) (EPID L-2021-LLA-0164) (Emergency Circumstances) ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21159A1782021-06-15015 June 2021 Correction of Amendment Nos. 277 and 221 Application to Relocate the Pressure-Temperature Limit Curves Following TSTF-419 NL-21-0379, Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions2021-04-27027 April 2021 Southern Nuclear Operating Company - Supplement to License Amendment Request to Revise the Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21109A3592021-04-22022 April 2021 Issuance of Amendment No. 254, Regarding Revision to Technical Specifications for One-Time Extension of Completion Times Related to Residual Heat Removal System (Emergency Circumstances) ML21095A0872021-04-19019 April 2021 Non-Acceptance of Requested Licensing Action License Amendment Request to Revise Technical Specification Surveillance Requirement 3.3.5.2 Allowable Values ML21028A3882021-02-0101 February 2021 Revised Correction of Amendment Nos. 308 and 253 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML21014A3752021-01-26026 January 2021 Correction of Amendment Nos. 308 and 253 Application to Revise Technical Specifications to Adopt Technical Specifications Task Force Traveler TSTF-582, RPV WIC Enhancements ML20294A0762020-12-0707 December 2020 Issuance of Amendments Nos. 308 and 253, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements ML20254A0572020-09-18018 September 2020 Issuance of Amendments Nos. 307 and 252, Regarding License Amendment Request to Revise the Required Actions of Technical Specifications 3.8.1, AC (Alternating Current) Sources - Operating, ML20202A0052020-09-15015 September 2020 Issuance of Amendments Nos. 306 and 251, Regarding the Application to Revise Technical Specifications to Adopt TSTF-568, Revise Appliciability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20077J7042020-06-26026 June 2020 Issuance of Amendment Nos. 305 and 250, Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML20167A0132020-06-17017 June 2020 Correction of Amendments Nos. 304 & 249 License Amendment Request to Adopt NFPA-805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 EPID L-2018-LLA-0107 ML20066F5922020-06-11011 June 2020 Issuance of Amendments Nos. 304 and 249, Regarding License Amendment Request to Adopt NFPA-805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19239A2442019-11-19019 November 2019 Issuance of Amendments Regarding Revision to Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations ML19267A0232019-11-13013 November 2019 Issuance of Amendments the Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable (Residual Heat Removal) RHR Shutdown Cooling Subsystems, Using Consolidated Line Item Improvement Process ML19212A0542019-09-20020 September 2019 Issuance of Amendments 299 and 244 Regarding Revision to Technical Specifications to Adopt Tstf-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML19198A1042019-09-0404 September 2019 Issuance of Amendments Regarding Revision to Technical Specification 3.6.4.1 - Secondary Containment ML19177A1662019-07-0808 July 2019 Edwin Hatch Unit Nos. 1 and 2, Issuance of Amendments Regarding License Amendment Request to Correct Non-Conservative Technical Specification Allowable Values for the Condensate Storage Tank Low Level Transfer Function ML19091A2912019-04-30030 April 2019 Issuance of Amendments 296 and 241 to Revise Technical Specifications 3.6.2.5, Condition C, Residual Heat Removal Drywell Spray End State ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML19053A0932019-02-22022 February 2019 Issuance of Amendments to Revise Technical Specification 3.8.1, AC Sources - Operating (EPID L-2019-LLA-0026) (Emergency Circumstances) ML19010A0092019-01-28028 January 2019 Issuance of Amendments to Revise Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation ML18302A2562018-11-0202 November 2018 Correction of Amendment No. 227 Adoption of TSTF-65-A, Revision 1 ML18222A2962018-08-29029 August 2018 Issuance of Amendments to Revise Technical Specification 3.7.7, ECCS - Operating (CAC Nos. MF9997 and MF9998; EPID L-2017-LLA-0263) ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18123A3682018-05-31031 May 2018 Issuance of Amendments to Adopt TSTF-542, RPV Water Inventory Control (CAC Nos. MF9662 and MF9663; EPID L-2017-LLA-0215) ML17355A4402018-01-22022 January 2018 Issuance of Amendments to Revise TS 3.6.4.1, Secondary Containment (CAC Nos. MF9590 and MF9591; EPID L-2017-LLA-0216) ML17271A3072017-11-30030 November 2017 Issuance of Amendments to Revise Actions of TS 5.5.12, Primary Containment Leakage Rate Testing Program ML17208A2312017-08-29029 August 2017 Issuance of Amendments Regarding the Adoption of TSTF 500, DC Electrical Rewrite - Update to TSTF 360 ML17152A2182017-06-30030 June 2017 Southern Nuclear Fleet - Issuance of Amendments Regarding the Adoption of TSTF-545, Revision 3, TS Inservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing (CAC Nos. MF8176 - MF8181) ML17137A0412017-06-27027 June 2017 Issuance of Amendments Regarding the Adoption of TSTF-529, Revision 4, Clarify Use and Application Rules (CAC Nos. MF8897, MF8898, MF8900-MF8902, and MF8921) ML17023A2372017-03-16016 March 2017 Issuance of Amendments Regarding the Adoption of NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors(Cac Nos. MF7460-MF7465) ML16141A1472017-03-14014 March 2017 Issuance of Amendments to Incorporate Southern Nuclear Company Fleet Emergency Plan ML16291A0302017-01-13013 January 2017 Issuance of Amendments the Adoption of TSTF-65-A, Rev. 1, Use of Generic Titles for Utility Positions (CAC Nos. MF7466, MF7467, MF7468, MF7469, MF7470, & MF7471) 2023-03-03
[Table view] Category:Safety Evaluation
MONTHYEARML23202A1122023-08-0202 August 2023 Units, 1 and 2; and Vogtle Units 1 and 2 - Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23034A2462023-02-21021 February 2023 Audit Summary for License Amendment Request to Relax Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs ML22363A3932023-02-15015 February 2023 Issuance of Amendments Nos. 321 and 266, Regarding License Amendment Request to Revise the (National Fire Protection Association) NFPA-805 Fire Protection Program ML22346A1482023-02-0909 February 2023 Issuance of Amendments 320 and 265, Regarding LAR to Revise Technical Specifications to Adopt TSTF-208 and Administrative Correction for Duplicate Technical Specifications 3.4.10 ML22297A1462022-12-22022 December 2022 Issuance of Amendments Nos. 319 and 264, Regarding Revision to Technical Specifications to Adopt Risk-Informed Completion Times TSTF 505, Revision 2, Provide Risk-Informed Extended Completion Times RITS ML22293A0302022-11-0707 November 2022 Amendments 318 & 263 Issuance, Regarding LAR to Adopt TSTF-227, Revision to EOC-RPT Pump Actions, and TSTF-297, ATWS-RPT (EPID L-2021-LLA- 0227) ML22192A1172022-09-0202 September 2022 Issuance of Amendments Nos. 317 & 262, Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-207-A, Completion Time for Restoration of Various Excessive Leakage Rates ML22192A1992022-08-19019 August 2022 Issuance of Amendments Nos. 316 and 261, Regarding Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML22101A0942022-05-20020 May 2022 Issuance of Amendments Nos. 315 and 260, Regarding Request to Eliminate Automatic Main Steam Line Isolation on High Turbine Building Area Temperature ML21349A5182022-02-0202 February 2022 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-554, Revise RCS Leakage ML21270A0862021-11-18018 November 2021 Issuance of Amendments Regarding Revision to Technical Specifications 5.7, High Radiation, Administrative Controls ML21264A6442021-09-24024 September 2021 Issuance of Amendment to Revise Technical Specification 3.7.2, Plant Service Water (Psw) System and Ultimate Heat Sink (UHS) (EPID L-2021-LLA-0164) (Emergency Circumstances) ML21217A0912021-09-21021 September 2021 SNC Fleet, Issuance of Amendments Regarding Revision to Emergency Plan to Change Staffing and Extend Staff Augmentation Times for Emergency Response Organization Positions ML21167A3152021-07-30030 July 2021 Issuance of Amendments Regarding Revision to Technical Specifications to Adopt TSTF-541, Rev.2, Add Exceptions to Surveillance Requirements for Valves & Dampers Locked in Actuated Position ML21161A2012021-06-22022 June 2021 Associated Independent Spent Fuel Storage Facilities - Reduction in Commitment to the Quality ML21109A3592021-04-22022 April 2021 Issuance of Amendment No. 254, Regarding Revision to Technical Specifications for One-Time Extension of Completion Times Related to Residual Heat Removal System (Emergency Circumstances) ML20294A0762020-12-0707 December 2020 Issuance of Amendments Nos. 308 and 253, Regarding Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control Enhancements ML20254A0752020-09-18018 September 2020 Safety Evaluation by the Office of Nuclear Reactor Regulation Related to Amendment No. 307 to Facility Operating License No. DPR-57 and Amendment No. 252 to Facility Operating License No. NPF-5 ML20202A0052020-09-15015 September 2020 Issuance of Amendments Nos. 306 and 251, Regarding the Application to Revise Technical Specifications to Adopt TSTF-568, Revise Appliciability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 ML20077J7042020-06-26026 June 2020 Issuance of Amendment Nos. 305 and 250, Regarding Adoption of 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems, and Components for Nuclear Power Reactors ML20066F5922020-06-11011 June 2020 Issuance of Amendments Nos. 304 and 249, Regarding License Amendment Request to Adopt NFPA-805 Performance Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants (2001 Edition) ML20143A2332020-06-0303 June 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) ML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ML19337C3222020-01-29029 January 2020 Issuance of Amendments Revision to Technical Specifications to Adopt TSTF-563 ML19239A2442019-11-19019 November 2019 Issuance of Amendments Regarding Revision to Technical Specification Requirements During Handling Irradiated Fuel and Core Alterations ML19267A0232019-11-13013 November 2019 Issuance of Amendments the Revision to Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable (Residual Heat Removal) RHR Shutdown Cooling Subsystems, Using Consolidated Line Item Improvement Process ML19212A0542019-09-20020 September 2019 Issuance of Amendments 299 and 244 Regarding Revision to Technical Specifications to Adopt Tstf-564, Safety Limit (Minimum Critical Power Ratio) MCPR ML19198A1042019-09-0404 September 2019 Issuance of Amendments Regarding Revision to Technical Specification 3.6.4.1 - Secondary Containment ML19177A1662019-07-0808 July 2019 Edwin Hatch Unit Nos. 1 and 2, Issuance of Amendments Regarding License Amendment Request to Correct Non-Conservative Technical Specification Allowable Values for the Condensate Storage Tank Low Level Transfer Function ML19091A2912019-04-30030 April 2019 Issuance of Amendments 296 and 241 to Revise Technical Specifications 3.6.2.5, Condition C, Residual Heat Removal Drywell Spray End State ML19064A7742019-04-26026 April 2019 Issuance of Amendments Regarding License Amendment Request to Revise Technical Specification 5.2.2.g and Update Emergency Plan Minimum on Shift Staff Tables ML19044A5552019-04-0303 April 2019 Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 ML19064A0872019-03-0808 March 2019 Proposed Inservice Inspection Alternative HNP-ISI-ALT-05-08 ML19053A0932019-02-22022 February 2019 Issuance of Amendments to Revise Technical Specification 3.8.1, AC Sources - Operating (EPID L-2019-LLA-0026) (Emergency Circumstances) ML19035A5502019-02-0606 February 2019 Relief Request HNP ISI RR 05-02 Regarding Reactor Pressure Vessel Head Stud Inservice Inspection Requirements ML19010A0092019-01-28028 January 2019 Issuance of Amendments to Revise Technical Specification 3.3.8.1, Loss of Power (LOP) Instrumentation ML19011A0102019-01-22022 January 2019 Proposed Alternative HNP-ISI-ALT-05-04 for the Implementation of BWRVIP Guidelines ML18320A0572018-11-30030 November 2018 Plant, Units 1 and 2 - Proposed Inservice Inspection Alternative GEN-ISI-ALT-2017-03, Code Case N-513-4 for Moderate Pressure ML18289A6192018-10-18018 October 2018 Proposed Inservice Inspection Alternative HNP-ISI-ALT-05-07 ML18222A2962018-08-29029 August 2018 Issuance of Amendments to Revise Technical Specification 3.7.7, ECCS - Operating (CAC Nos. MF9997 and MF9998; EPID L-2017-LLA-0263) ML18183A0732018-07-26026 July 2018 Unites 1, 2, 3, and 4; and Edwin I. Hatch Nuclear Plant, Unit Nos. 1 and 2(CAC Nos. MG0188, MG0189, MG0191, MG0192, MG0193, MG0194, and MG0195; EPID L-2017-LLA-0293) ML18163A1602018-06-15015 June 2018 Proposed Alternative RR-V-11, Extension of Main Steam Safety Relief Valve Test Interval ML18123A3682018-05-31031 May 2018 Issuance of Amendments to Adopt TSTF-542, RPV Water Inventory Control (CAC Nos. MF9662 and MF9663; EPID L-2017-LLA-0215) ML18102B0162018-04-16016 April 2018 Proposed Inservice Inspection Alternative HNP-ISI-ALT-05-05 (CAC Nos. MF9812 and MF9813; EPID L-2017-LLR-0053) ML18022A1072018-01-25025 January 2018 Inservice Inspection Alternative GEN-ISI-ALT-2017-02, Version 1.0, Regarding the Use of ASME Code Case N-789-1 (CAC Nos. MF9942, MF9943, MF9944, and MF9945; EPID L-2017-LLR-0059) ML17355A4402018-01-22022 January 2018 Issuance of Amendments to Revise TS 3.6.4.1, Secondary Containment (CAC Nos. MF9590 and MF9591; EPID L-2017-LLA-0216) ML17271A3072017-11-30030 November 2017 Issuance of Amendments to Revise Actions of TS 5.5.12, Primary Containment Leakage Rate Testing Program ML17279A0452017-10-26026 October 2017 Relief Requests ISI-RR-13, -14, -18, -19, -23, and -24 for Relief from Inservice Inspection Requirements ML17268A0442017-10-20020 October 2017 Relief Requests ISI RR 16, ISI-RR-17, ISI-44-21, and ISI-RR-22 for Relief from Inservice Inspection Requirements ML17208A2312017-08-29029 August 2017 Issuance of Amendments Regarding the Adoption of TSTF 500, DC Electrical Rewrite - Update to TSTF 360 2023-08-02
[Table view] |
Text
March 10, 2003 Mr. H. L. Sumner, Jr.
Vice President - Nuclear Hatch Project Southern Nuclear Operating Company, Inc.
Post Office Box 1295 Birmingham, Alabama 35201-1295
SUBJECT:
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 RE: ISSUANCE OF AMENDMENTS (TAC NOS. MB6106 AND MB6107)
Dear Mr. Sumner:
The Nuclear Regulatory Commission has issued the enclosed Amendment No. 237 to Renewed Facility Operating License DPR-57 and Amendment No. 179 to Renewed Facility Operating License NPF-5 for the Edwin I. Hatch Nuclear Plant, Units 1 and 2. The amendments consist of changes to the two Renewed Facility Operating Licenses in response to your application dated August 9, 2002, as supplemented by letters dated January 8 and February 6, 2003.
The amendments revise the Updated Final Safety Analysis Report to incorporate the Boiling Water Reactor Vessel and Internals Project Integrated Surveillance Program for the surveillance of the material capsules.
A copy of the related Safety Evaluation is also enclosed. A Notice of Issuance will be included in the Commissions biweekly Federal Register notice.
Sincerely,
/RA/
Leonard N. Olshan, Project Manager, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-321 and 50-366
Enclosures:
- 1. Amendment No. 237 to DPR-57
- 2. Amendment No. 179 to NPF-5
- 3. Safety Evaluation cc w/encls: See next page
ML030690457 *No major changes to SE OFFICE PDII-1/PM PDII-1/LA EMCB* OGC** PDII-1/SC NAME LOlshan CHawes SCoffin CBray JNakoski DATE 03/5/03 03/5/03 2/04/03 2/27/03 3/7/03 SOUTHERN NUCLEAR OPERATING COMPANY, INC.
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-321 EDWIN I. HATCH NUCLEAR PLANT, UNIT 1 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 237 Renewed License No. DPR-57
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Edwin I. Hatch Nuclear Plant, Unit 1 (the facility)
Renewed Facility Operating License No. DPR-57 filed by Southern Nuclear Operating Company, Inc. (the licensee), acting for itself, Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the owners), dated August 9, 2002, as supplemented by letters dated January 8 and February 6, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is hereby amended to authorize revision to the Updated Final Safety Analysis Report as set forth in the application for amendment by the licensee dated August 9, 2002, as supplemented by letters dated January 8 and February 6, 2003.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Date of Issuance: March 10, 2003
SOUTHERN NUCLEAR OPERATING COMPANY, INC.
GEORGIA POWER COMPANY OGLETHORPE POWER CORPORATION MUNICIPAL ELECTRIC AUTHORITY OF GEORGIA CITY OF DALTON, GEORGIA DOCKET NO. 50-366 EDWIN I. HATCH NUCLEAR PLANT, UNIT 2 AMENDMENT TO RENEWED FACILITY OPERATING LICENSE Amendment No. 179 Renewed License No. NPF-5
- 1. The Nuclear Regulatory Commission (the Commission) has found that:
A. The application for amendment to the Edwin I. Hatch Nuclear Plant, Unit 2 (the facility)
Renewed Facility Operating License No. NPF-5 filed by Southern Nuclear Operating Company, Inc. (the licensee), acting for itself, Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and City of Dalton, Georgia (the owners), dated August 9, 2002, as supplemented by letters dated January 8 and February 6, 2003, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commissions rules and regulations as set forth in 10 CFR Chapter I; B. The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commissions regulations set forth in 10 CFR Chapter I; D. The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commissions regulations and all applicable requirements have been satisfied.
- 2. Accordingly, the license is hereby amended to authorize revision to the Updated Final Safety Analysis Report as set forth in the application for amendment by the licensee dated August 9, 2002, as supplemented by letters dated January 8 and February 6, 2003.
- 3. This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
John A. Nakoski, Chief, Section 1 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation Date of Issuance: March 10, 2003
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO AMENDMENT NO. 237 TO RENEWED FACILITY OPERATING LICENSE DPR-57 AND AMENDMENT NO. 179 TO RENEWED FACILITY OPERATING LICENSE NPF-5 SOUTHERN NUCLEAR OPERATING COMPANY, INC., ET AL.
EDWIN I. HATCH NUCLEAR PLANT, UNITS 1 AND 2 DOCKET NOS. 50-321 AND 50-366
1.0 INTRODUCTION
By letter dated August 9, 2002 (Reference (Ref.) 1), as supplemented by letters dated January 8, 2003 (Ref. 2), and February 6, 2003 (Ref. 3), Southern Nuclear Operating Company, Inc. (SNC, the licensee), et al., proposed license amendments to revise the Updated Final Safety Analysis Report (UFSAR) for the Edwin I. Hatch Nuclear Plant (Hatch), Units 1 and 2. The proposed changes would revise the UFSAR to incorporate the Boiling Water Reactor (BWR) Vessel and Internals (BWRVIP) Integrated Surveillance Program (ISP) for the surveillance of the material capsules. The supplemental letters dated January 8 and February 6, 2003, provided clarifying information that did not change the scope of the August 9, 2002, application nor the initial proposed no significant hazards consideration determination.
The BWRVIP ISP was submitted for NRC staff review and approval in topical reports BWRVIP-78, BWR Vessel and Internals Project, BWR Integrated Surveillance Program Plan, (Ref. 4) and BWRVIP-86, BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation Plan (Ref. 5). Additional information necessary to establish the technical basis for, and proposed implementation of, the BWRVIP ISP was provided in letters from the BWRVIP to the NRC dated December 22, 2000 (Ref. 6), and May 30, 2001 (Ref. 7).
The NRC staff approved the proposed BWRVIP ISP in a Safety Evaluation (SE) that was provided to the BWRVIP by letter dated February 1, 2002 (Ref. 8). However, the NRC staffs SE required that plant-specific information be provided by BWR licensees that wish to implement the BWRVIP ISP for their facilities. SNCs August 9, 2002, January 8 and February 6, 2003, submittals addressed the plant-specific information required in the NRC staffs February 1, 2002, BWRVIP ISP SE.
Enclosure
2.0 REGULATORY EVALUATION
Nuclear power plant licensees are required by Appendix H to Part 50 to Title 10 of the Code of Federal Regulations (10 CFR Part 50) to implement reactor pressure vessel (RPV) surveillance programs to monitor changes in the fracture toughness properties of ferritic materials in the reactor vessel beltline region...which result from exposure of these materials to neutron irradiation and the thermal environment. Two specific alternatives are provided with regard to the design of a facilitys RPV surveillance program which may be used to address the requirements of Appendix H to 10 CFR Part 50.
The first alternative is the implementation of a plant-specific RPV surveillance program consistent with the requirements of American Society for Testing and Materials (ASTM)
Standard Practice E 185, Standard Practice for Conduction Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels. In the design of a plant-specific RPV surveillance program, a licensee may use the edition of ASTM Standard Practice E 185 that was current on the issue date of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code to which the reactor vessel was purchased, or later editions through the 1982 edition.
The second alternative provided in Appendix H to 10 CFR Part 50 is the implementation of an ISP. An ISP is defined in Appendix H to 10 CFR Part 50 as occurring when, the representative materials chosen for surveillance for a reactor are irradiated in one or more other reactors that have similar design and operating features. Five specific criteria are stated in Appendix H to 10 CFR Part 50 that must be met to support approval of an ISP:
- a. The reactor in which the materials will be irradiated and the reactor for which the materials are being irradiated must have sufficiently similar design and operating features to permit accurate comparisons of the predicted amount of radiation damage.
- b. Each reactor must have an adequate dosimetry program.
- c. There must be adequate arrangement for data sharing between plants.
- d. There must be a contingency plan to assure that the surveillance program for each reactor will not be jeopardized by operation at reduced power level or by an extended outage of another reactor from which data are expected.
- e. There must be substantial advantages to be gained, such as reduced power outages or reduced personnel exposure to radiation, as a direct result of not requiring surveillance capsules in all reactors in the set.
As noted above, the NRC staff approved the proposed BWRVIP ISP in an SE that was issued to the BWRVIP by letter dated February 1, 2002 (Ref. 8). In that letter, all of the criteria cited above for approval of an ISP were addressed either completely or partially. For those criteria that could not be fully addressed in that letter, plant-specific information was required from licensees that wished to implement the BWRVIP for their facilities. As stated in Ref. 7:
[L]icensees who wish to participate in the BWR ISP must provide, for NRC staff review and approval, information which defines how they will determine RPV and/or surveillance capsule fluences based on the dosimetry data which will be available for
their facilities. This information must be submitted concurrently with each licensees submittal to replace their existing plant-specific surveillance program with the BWR ISP as part of their facilitys licensing basis. The information submitted must be sufficient for the staff to determine that:
(1) RPV and surveillance capsule fluences will be established...based on the use of an NRC-approved fluence methodology that will provide acceptable results based on the available dosimetry data, (2) if one methodology is used to determine the neutron fluence values for a licensees RPV and one or more different methodologies are used to establish the neutron fluence values for the ISP surveillance capsules which represent that RPV in the ISP, the results of these differing methodologies are compatible (i.e., within acceptable levels of uncertainty for each calculation).
This plant-specific information was required by the NRC staff to ensure that, for an ISP, Criterion b from Appendix H to 10 CFR Part 50 could be met by each facility and to confirm that data that would be shared as part of the BWRVIP ISP could be effectively utilized by each licensee for the monitoring of RPV embrittlement for its facility.
3.0 TECHNICAL EVALUATION
In Ref. 1, 2, and 3 SNC submitted information for Hatch, Units 1 and 2, that addressed the information requested in the NRC staffs February 1, 2002 BWRVIP ISP SE (Ref. 8). SNC provided a commitment in Ref. 2 with regard to the use of a neutron fluence methodology that is consistent with the guidance in Regulatory Guide (RG) 1.190, Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence, for future Hatch, Units 1 and 2 RPV fluence calculations. In response to a conference call on January 24, 2003, the licensee supplemented its application (Ref. 3) to document its commitment to update the UFSAR to note that the neutron fluence methodology used at Hatch, Units 1 and 2, will comply with RG 1.190.
The NRC staff has concluded that the inclusion of a commitment to utilize a fluence methodology that is consistent with the guidance in RG 1.190 in the Hatch, Units 1 and 2, UFSARs is sufficient to address both items (1) and (2) from Ref. 8. Regarding item (1), the licensees use of a methodology that is consistent with the attributes of RG 1.190 for determining Hatch, Units 1 and 2, RPV neutron fluence values and that has been approved by the NRC staff, will provide acceptable results based upon the available dosimetry data.
Regarding item (2), RPV surveillance capsules tested under the BWRVIP ISP will have their fluences determined by the use of a methodology that is consistent with the attributes of RG 1.190 and has been approved by the NRC staff. The NRC staff has concluded that any two (or more) different fluence methodologies will provide compatible (as defined in Ref. 8) results provided that each methodology is consistent with the attributes of RG 1.190 and has been approved by the NRC staff. In addition, SNC provided an additional commitment in its January 8, 2003, submittal stating when SNC will perform and updated RPV fluence analysis for the Hatch, Units 1 and 2 RPVs:
SNC will begin using an RPV fluence methodology that meets RG 1.190 no later than December 15, 2004.
The NRC staff found this commitment by SNC to be acceptable since the current RPV fluence
calculations (and RPV pressure-temperature limit curves that are valid up to 54 effective full power years of operation) for the Hatch, Units 1 and 2 RPVs are expected to remain conservative with respect to the actual, accumulated RPV neutron fluence through December 15, 2004.
Since this action was submitted as a license amendment, consistent with the NRC staffs understanding of the decision given in Commission Memorandum and Order CLI-96-13, SNC provided revised sections of the Hatch, Units 1 and 2, UFSARs that documented the licensees incorporation of the BWRVIP ISP into the Hatch, Units 1 and 2, licensing bases:
Hatch, Unit 1 A matrix of capsules containing the representative weld and plate materials and the planned schedules for withdrawing and testing is provided in Table R.6-3. The overall ISP, as documented in references 1 through 5, replaces the existing material and surveillance monitoring programs with an integrated program using host reactor capsules containing the selected materials.
Hatch, Unit 2 A matrix of capsules containing the representative weld and plate materials and the planned schedules for withdrawing and testing is provided in Table 5.2-11. The overall ISP, as documented in references 28 through 32, replaces the existing material and surveillance monitoring programs with an integrated program using host reactor capsules containing the selected materials.
In either case, the references referred to in the statements above from the Hatch, Unit 1 and 2, UFSARs are consistent with Ref. 4 through 8 of this SE.
The NRC staff has concluded that the information provided in the revised Hatch, Units 1 and 2, UFSARs is adequate to document the licensees intent to appropriately implement the BWRVIP ISP as the method for demonstrating the compliance of Hatch, Units 1 and 2, with the requirements of Appendix H to 10 CFR Part 50.
The NRC staff has concluded that the information provided by SNC was sufficient to conclude that the BWRVIP ISP, as approved in Ref. 8, can be implemented for Hatch, Units 1 and 2, as the basis for demonstrating the facilitys continued compliance with the requirements of Appendix H to 10 CFR Part 50. As part of the implementation and documentation of the licensees intent to utilize the BWRVIP ISP for this purpose, the licensee shall modify the Hatch, Units 1 and 2 FSARs, as noted above, as stated in the licensees January 8 and February 6, 2003, submittals.
4.0 STATE CONSULTATION
In accordance with the Commission's regulations, the Georgia State official was notified of the proposed issuance of the amendments. The State official had no comments.
5.0 ENVIRONMENTAL CONSIDERATION
The amendments change a requirement with respect to the installation or use of facility components located within the restricted area as defined in 10 CFR Part 20 and change a surveillance requirement. The NRC staff has determined that the amendments involve no significant increase in the amounts and no significant change in the types of any effluents that may be released offsite and that there is no significant increase in individual or cumulative occupational radiation exposure. The Commission has previously issued a proposed finding that the amendments involve no significant hazards consideration, and there has been no public comment on such finding (67 FR 61684). Accordingly, the amendments meet the eligibility criteria for categorical exclusion set forth in 10 CFR 51.22(c)(9). Pursuant to 10 CFR 51.22(b) no environmental impact statement or environmental assessment need be prepared in connection with the issuance of the amendments.
6.0 CONCLUSION
The Commission has concluded, based on the considerations discussed above, that: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commissions regulations, and (3) the issuance of the amendments will not be inimical to the common defense and security or to the health and safety of the public.
7.0 REFERENCES
- 1. H. L. Sumner, Jr. (SNC) to U.S. NRC Document Control Desk, Edwin I. Hatch Nuclear Plant, Request to Implement the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Integrated Surveillance Program, August 9, 2002.
- 2. H. L. Sumner, Jr. (SNC) to U.S. NRC Document Control Desk, Edwin I. Hatch Nuclear Plant, Addendum to Request to Implement the Boiling Water Reactor Vessel and Internals Project (BWRVIP) Integrated Surveillance Program, January 8, 2003.
- 3. H. L. Sumner, Jr. (SNC) to U.S. NRC Document Control Desk, Edwin I. Hatch Nuclear Plant, Second Addendum to Request to Implement the Boiling Water Reactor Vessel and Internals Program (BWRVIP) Integrated Surveillance Program, February 6, 2003.
- 4. C. Terry (BWRVIP) to U.S. NRC Document Control Desk, Project No. 704 - BWR Vessel and Internals Project, BWR Integrated Surveillance Program Plan (BWRVIP-78),
December 22, 1999.
- 5. C. Terry (BWRVIP) to U.S. NRC Document Control Desk, Project No. 704 - BWRVIP-86:
BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation Plan, EPRI Technical Report 1000888, December 22, 2000.
- 6. C. Terry (BWRVIP) to U.S. NRC Document Control Desk, PROJECT NO. 704 - BWRVIP Response to NRC Request for Additional Information Regarding BWRVIP-78, December 15, 2000.
- 7. C. Terry (BWRVIP) to U.S. NRC Document Control Desk, PROJECT NO. 704 - BWRVIP Response to Second NRC Request for Additional Information on the BWR Integrated Surveillance Program, May 30, 2001.
- 8. W. H. Bateman (USNRC) to C. Terry, Safety Evaluation Regarding EPRI Proprietary Reports BWR Vessel and Internals Project, BWR Integrated Surveillance Program Plan (BWRVIP-78) and BWRVIP-86: BWR Vessel and Internals Project, BWR Integrated Surveillance Program Implementation Plan, February 1, 2002.
Principal Contributor: M. Mitchell L. Lois Date: March 10, 2003
Edwin I. Hatch Nuclear Plant cc:
Mr. Ernest L. Blake, Jr. Charles A. Patrizia, Esquire Shaw, Pittman, Potts Paul, Hastings, Janofsky & Walker and Trowbridge 10th Floor 2300 N Street, NW. 1299 Pennsylvania Avenue Washington, DC 20037 Washington, DC 20004-9500 Mr. R. D. Baker Chairman Manager - Licensing Appling County Commissioners Southern Nuclear Operating County Courthouse Company, Inc. Baxley, Georgia 31513 P. O. Box 1295 Birmingham, Alabama 35201-1295 Mr. J. D. Woodard Executive Vice President Resident Inspector Southern Nuclear Operating Plant Hatch Company, Inc.
11030 Hatch Parkway N. P. O. Box 1295 Baxley, Georgia 31531 Birmingham, Alabama 35201-1295 Mr. Charles H. Badger Mr. P. W. Wells Office of Planning and Budget General Manager, Edwin I. Hatch Room 610 Nuclear Plant 270 Washington Street, SW. Southern Nuclear Operating Atlanta, Georgia 30334 Company, Inc.
U.S. Highway 1 North Harold Reheis, Director P. O. Box 2010 Department of Natural Resources Baxley, Georgia 31515 205 Butler Street, SE., Suite 1252 Atlanta, Georgia 30334 Mr. L. M. Bergen Resident Manager Steven M. Jackson Oglethorpe Power Corporation Senior Engineer - Power Supply Edwin I. Hatch Nuclear Plant Municipal Electric Authority P. O. Box 2010 of Georgia Baxley, Georgia 31515 1470 Riveredge Parkway, NW Atlanta, Georgia 30328-4684