Inspection/Activity Plan - 03/01/03 - 03/30/04
ML030660165
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/20/2003
From:
NRC/RGN-II
To:
Shared Package
ML030660138 List:
References
Download: ML030660165 (3)


Text

Page 1 of 3 Saint Lucie 02/20/2003 14:49:22 Inspection / Activity Plan Report 22 03/01/2003 - 03/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EB1-TFP - TRIENNIAL FIRE PROTECTION INSP 5 1, 2 IP 7111105T Fire Protection 03/10/2003 03/14/2003 Baseline Inspections 1, 2 IP 7111105T Fire Protection 03/24/2003 03/28/2003 Baseline Inspections Comments:

TFP - FP CLOSEOUT 1 1, 2 IP 71153 Event Followup 03/10/2003 03/14/2003 Baseline Inspections Comments:

PS-RP - RADIATION PROTECTION - ONSITE PREP 1 1, 2 IP 71152 Identification and Resolution of Problems 04/07/2003 04/10/2003 Baseline Inspections Comments:

EB2-ISI - INSERVICE INSPECTION-U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/28/2003 05/02/2003 Baseline Inspections Comments:

PS-RP - RADIATION PROTECTION 3 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/28/2003 05/02/2003 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/28/2003 05/02/2003 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 04/28/2003 05/02/2003 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 04/28/2003 05/02/2003 Baseline Inspections Comments:

2515/150 - 2515/150 REV1 UNIT 2 1 2 IP 2515/150 Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles (NRC Bulletin 2002-0 04/28/2003 05/02/2003 Safety Issues Comments:

PS-RP - RADIATION PROTECTION 2 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 05/12/2003 05/16/2003 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 05/12/2003 05/16/2003 Baseline Inspections 1, 2 IP 7112202 Radioactive Material Processing and Transportation 05/12/2003 05/16/2003 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 3 Saint Lucie 02/20/2003 14:49:22 Inspection / Activity Plan Report 22 03/01/2003 - 03/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type PS-RP - RADIATION PROTECTION 2 1, 2 IP 71151 Performance Indicator Verification 05/12/2003 05/16/2003 Baseline Inspections Comments:

S/G-ISI - S/G INSERVICE INSPECTION-U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 05/12/2003 05/16/2003 Baseline Inspections Comments:

EB2-HS - HEAT SINK 1 1, 2 IP 7111107B Heat Sink Performance 06/16/2003 06/20/2003 Baseline Inspections Comments:

OL RQ - REQUAL INSPECTION 2 1, 2 IP 7111111B Licensed Operator Requalification 09/22/2003 09/26/2003 Baseline Inspections Comments:

EB1SSDPC - SSDPC PRE-INSPECTION VISIT 1 1, 2 IP 7111121 Safety System Design and Performance Capability 10/27/2003 10/28/2003 Baseline Inspections Comments:

EB1SSDPC - SAFETY SYS DESIGN & PERFORMANCE CAPABILI 5 1, 2 IP 7111121 Safety System Design and Performance Capability 12/01/2003 12/05/2003 Baseline Inspections 1, 2 IP 7111121 Safety System Design and Performance Capability 12/15/2003 12/19/2003 Baseline Inspections Comments:

EB2-MODS - MODIFICATIONS/10CFR50.59 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 02/02/2004 02/06/2004 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 02/02/2004 02/06/2004 Baseline Inspections Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 3 of 3 Saint Lucie 02/20/2003 14:49:22 Inspection / Activity Plan Report 22 03/01/2003 - 03/30/2004 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EP - EP EXERCISE 2 1, 2 IP 7111401 Exercise Evaluation 02/16/2004 02/20/2004 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 02/16/2004 02/20/2004 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 02/16/2004 02/20/2004 Baseline Inspections Comments: EP Exercise Wednesday, Feb. 18, 2004.

DRP/BR3 - PI&R 2 1, 2 IP 71152B Identification and Resolution of Problems 02/22/2004 03/06/2004 Baseline Inspections Comments:

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.