March 6, 2003 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING No.03-007 Licensee:

Dominion Nuclear Connecticut, Inc.

Facility:

Millstone Unit 2 and Unit 3 Docket No.:

50-336, 50-423 Time and Date:

1:00 p.m., Thursday, March 20, 2003 Location:

Millstone Nuclear Power Station L. F. Sillin Jr. Nuclear Training Center Simulator Training Building Rope Ferry Road, Route 156 Waterford, CT 06385

Purpose:

NRC staff and Dominion Nuclear Connecticut management will discuss the NRC Annual Assessment of the safety performance of Millstone Unit 2 and Unit 3. The annual assessment letter for Millstone Unit 2 and Unit 3, dated March 3, 2003, can be found at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/mill_2002q4.pdf Information relative to the NRC Annual Assessment process and the input to the NRC assessment of Millstone Unit 2 and Unit 3 can be found on the NRC web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html NRC Attendees:

A. Blough, Director, Division of Reactor Projects (DRP), Region 1 S. Schneider, Senior Resident Inspector S. Kennedy, Resident Inspector P. Cataldo, Resident Inspector V. Nerses, Senior Project Manager Licensee Attendees: J. Price, Site Vice-President A. Jordan, Director, Nuclear Engineering G. Hicks, Director, Nuclear Safety and Licensing P. Parulis, Manager, Nuclear Oversight S. Sarver, Director, Nuclear Station Operations and Management

2 NOTE: This is a Category 1 Meeting. The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. Handicapped persons requiring assistance to attend or participate in this meeting shall make their request known to the NRC point-of-contact no later than two business days prior to the meeting. Attendance by other NRC personnel should be made known by March 10, 2003.

The NRC point-of-contact for this meeting is Brian McDermott and he can be contacted as follows:

Mail:

U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Telephone:

610-337-5233, or toll-free at 1-800-432-1156 Email:

bjm@nrc.gov Approved by:

/RA Brian J. McDermott, Chief Projects Branch 6 Division of Reactor Projects

3 Distribution:

J. Alan Price, Site Vice President D. Dodson, Acting Manager, Licensing D. A. Christian, Senior Vice President - Nuclear Operations and Chief Nuclear Officer W. R. Matthews, Senior Vice President - Nuclear Operations S. E. Scace, Assistant to the Site Vice President G. D. Hicks, Director, Nuclear Station Safety and Licensing A. J. Jordan, Jr., Director - Nuclear Engineering S. P. Sarver, Director, Nuclear Station Operations and Maintenance D. A. Smith, Manager, Licensing P. J. Parulis, Manager, Nuclear Oversight L. M. Cuoco, Senior Counsel V. Juliano, Waterford Library S. Comley, We The People J. Buckingham, Department of Public Utility Control E. Wilds, Director, State of Connecticut SLO Designee First Selectmen, Town of Waterford D. Katz, Citizens Awareness Network (CAN)

R. Bassilakis, CAN J. M. Block, Attorney, CAN J. Besade, Fish Unlimited G. Winslow, Citizens Regulatory Commission (CRC)

J. Markowicz, Co-Chair, NEAC E. Woollacott, Co-Chair, NEAC R. Shadis, New England Coalition Staff W. Meinert, Massachusetts Municipal Wholesale Electric Company C. Brinkman, Manager, Washington Nuclear Operations B. McDermott, DRP K. Jenison, DRP Regional Administrator, Secretary, RI DRP Division Secretary, RI DRS Division Secretary, RI DNMS Division Secretary, RI DRM Division Secretary, RI Region I Receptionist Region I Docket Room (w/concurrences)

State of New Hampshire

4 Distribution (Via E-Mail):

W. Travers, Executive Director for Operations, OEDO W. Kane, Deputy Executive Director for Reactor Programs, OEDO (RIDSEDOMAILCENTER)

S. Collins, Director, Office of Nuclear Reactor Regulation, NRR D. Matthews, Director, Division of Regulatory Improvement Programs, NRR B. Boger, Director, Division of Inspection Program Management, NRR F. Congel, Director, Office of Enforcement R. Zimmerman, Deputy Director, Office of Nuclear Regulatory Research (NRR/ADPR)

J. Zwolinski, Director, Division of Licensing Project Management T. McGinty, RI EDO Coordinator, OEDO S. Richards, Project Directorate I-1, NRR J. Clifford, NRR V. Nerses, NRR D. Starkey, NRR W. Lanning, DRS D. Screnci, Public Affairs, RI N. Sheehan, Field Public Affairs Officer, RI R. Bores, ORA G. Matakas, ORA PMNS NRCWEB DOCUMENT NAME: G:\\BRANCH6\\ROP Assessments\\ROP3 End of Cycle\\Millstone AA Meeting Notice 3-20-03.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME MBarillas/MCB BMcDermott/BJM DATE 03/06 /03 03/06/03 OFFICIAL RECORD COPY