Inspection/Activity Plan - 03/01/03 - 03/31/04
ML030650418
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/04/2003
From: Plisco L
Division Reactor Projects II
To: Christian D
Virginia Electric & Power Co (VEPCO)
Shared Package
ML030650392 List:
References
IR-03-001
Download: ML030650418 (2)


Text

Surry Inspection / Activity Plan 03/01/2003 - 03/31/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/04/2003 13:22:27 Report 22 2

OL RQ

- REQUAL INSPECTION Baseline Inspections 03/10/2003 03/14/2003 Licensed Operator Requalification IP 7111111B 1, 2 2

RX HEAD

- REACTOR HEAD LIFTING PROCEDURES Other Routine 04/21/2003 04/23/2003 Reactor Vessel Head Replacement Inspection IP 71007 1

2 EB2-ISI

- INSERVICE INSPECTION-U1 Baseline Inspections 04/28/2003 05/02/2003 Inservice Inspection Activities - PWR IP 7111108P 1

1 S/G-ISI

- S/G INSERVICE INSPECTION-U1 Baseline Inspections 05/05/2003 05/07/2003 Inservice Inspection Activities - PWR IP 7111108P 1

1 RX HEAD

- REACTOR HEAD REPLACEMENT Other Routine 05/12/2003 05/16/2003 Reactor Vessel Head Replacement Inspection IP 71007 1

2 CONT REP

- CONTAINMENT REPAIR Other Routine 05/19/2003 05/23/2003 Reactor Vessel Head Replacement Inspection IP 71007 1

1 PS-RP

- RAD PROTECTION AND HEAD REPLACEMENT Other Routine 06/02/2003 06/06/2003 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 06/02/2003 06/06/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 06/02/2003 06/06/2003 ALARA Planning and Controls IP 7112102 1, 2 1

ISFSI

- ISFSI OPS Other Routine 06/16/2003 06/19/2003 Operation Of An ISFSI IP 60855 1

2 OL EP

- EMERGENCY EXERCISE Baseline Inspections 07/14/2003 07/18/2003 Exercise Evaluation IP 7111401 1, 2 Baseline Inspections 07/14/2003 07/18/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2 Baseline Inspections 07/14/2003 07/18/2003 Performance Indicator Verification IP 71151 1, 2 3

EB2-MODS

- MODIFICATIONS/10CFR50.59 Baseline Inspections 07/28/2003 08/01/2003 Evaluation of Changes, Tests, or Experiments IP 7111102 1, 2 Baseline Inspections 07/28/2003 08/01/2003 Permanent Plant Modifications IP 7111117B 1, 2 1

PS-RP

- RADIATION PROTECTION - ISFSI Baseline Inspections 09/08/2003 09/11/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 1

EB2 HR

- REACTOR HEAD REPLACEMENT Other Routine 09/29/2003 10/03/2003 Reactor Vessel Head Replacement Inspection IP 71007 2

3 PS-RP

- RAD PROTECTION AND HEAD REPLACEMENT Other Routine 09/29/2003 10/03/2003 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 09/29/2003 10/03/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 09/29/2003 10/03/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 09/29/2003 10/03/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Surry Inspection / Activity Plan 03/01/2003 - 03/31/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/04/2003 13:22:27 Report 22 3

PS-RP

- RAD PROTECTION AND HEAD REPLACEMENT Baseline Inspections 09/29/2003 10/03/2003 Performance Indicator Verification IP 71151 1, 2 1

EB2-ISI

- INSERVICE INSPECTION-U2 Baseline Inspections 10/06/2003 10/10/2003 Inservice Inspection Activities - PWR IP 7111108P 2

1 S/G-ISI

- S/G INSERVICE INSPECTION-U2 Baseline Inspections 10/27/2003 10/30/2003 Inservice Inspection Activities - PWR IP 7111108P 2

2 PS-RP

- RAD PROTECTION AND HEAD REPLACEMENT Other Routine 10/27/2003 10/31/2003 Reactor Vessel Head Replacement Inspection IP 71007 1, 2 Baseline Inspections 10/27/2003 10/31/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2 Baseline Inspections 10/27/2003 10/31/2003 ALARA Planning and Controls IP 7112102 1, 2 Baseline Inspections 10/27/2003 10/31/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2 Baseline Inspections 10/27/2003 10/31/2003 Performance Indicator Verification IP 71151 1, 2 1

RX HEAD

- CONTAINMENT REPAIR & HEAD REPLACEMENT Other Routine 11/10/2003 11/13/2003 Reactor Vessel Head Replacement Inspection IP 71007 2

3 PI&R

- PROBLEM IDENTIFICATION & RESOLUTION Baseline Inspections 11/17/2003 11/21/2003 Identification and Resolution of Problems IP 71152B 1, 2 Baseline Inspections 12/01/2003 12/05/2003 Identification and Resolution of Problems IP 71152B 1, 2 1

EB2-HS

- HEAT SINK Baseline Inspections 01/12/2004 01/16/2004 Heat Sink Performance IP 7111107B 1, 2 1

EB2-MR

- MAINTENANCE RULE Baseline Inspections 02/02/2004 02/06/2004 Maintenance Effectiveness IP 7111112B 1, 2 3

OL PREP

- INITIAL EXAM PREP Not Applicable 02/02/2004 02/06/2004 SURRY/EXAMS AT POWER FACILITIES V23210 1

3 OL EXAM

- INITIAL EXAM PREP Not Applicable 02/23/2004 02/27/2004 SURRY/EXAMS AT POWER FACILITIES V23210 1

2 EB1SSDPC - SSDPC PRE-INSPECTION VISIT Baseline Inspections 03/01/2004 03/05/2004 Safety System Design and Performance Capability IP 7111121 1, 2 3

OL EXAM

- INITIAL EXAM Not Applicable 03/08/2004 03/12/2004 SURRY/EXAMS AT POWER FACILITIES V23210 1

5 EB1SSDPC - SAFETY SYS DESIGN & PERFROMANCE CAPABILI Baseline Inspections 03/22/2004 03/26/2004 Safety System Design and Performance Capability IP 7111121 1, 2 This report does not include INPO and OUTAGE activities.