Browns Ferry Inspection / Activity Plan 03/01/2003 - 03/31/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/04/2003 13:58:44 Report 22 2
PS-RP
- RADIATION PROTECTION Baseline Inspections 03/10/2003 03/14/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 03/10/2003 03/14/2003 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 03/10/2003 03/14/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 03/10/2003 03/14/2003 Performance Indicator Verification IP 71151 1, 2, 3 1
PB6-FP
- FLOOD PROTECTION Baseline Inspections 03/17/2003 03/21/2003 Flood Protection Measures IP 7111106 1, 2, 3 3
EB2-BF1
- BFN1 DW PLATFORMS Other Routine 06/02/2003 06/06/2003 Inspection Of Structures, Passive Components, And Civil Engineering Features At Nuclear Power Plants IP 62002 1
2 OL-EP
- EMERGENCY EXERCISE Baseline Inspections 06/02/2003 06/06/2003 Exercise Evaluation IP 7111401 1, 2, 3 Baseline Inspections 06/02/2003 06/06/2003 Emergency Action Level and Emergency Plan Changes IP 7111404 1, 2, 3 Baseline Inspections 06/02/2003 06/06/2003 Performance Indicator Verification IP 71151 1, 2, 3 1
EB2-BF1
- U1 RECOVERY Other Routine 06/16/2003 06/20/2003 Inspection Of Structures, Passive Components, And Civil Engineering Features At Nuclear Power Plants IP 62002 1
Other Routine 07/21/2003 07/25/2003 Inspection Of Structures, Passive Components, And Civil Engineering Features At Nuclear Power Plants IP 62002 1
1 EB2-MR
- MAINTENANCE RULE Baseline Inspections 07/07/2003 07/11/2003 Maintenance Effectiveness IP 7111112B 2, 3 2
EB2-BF1
- SAFE END WELDING Other Routine 07/14/2003 07/16/2003 Nuclear Welding General Inspection Procedure IP 55050 1
Other Routine 08/17/2003 08/20/2003 Nuclear Welding General Inspection Procedure IP 55050 1
Other Routine 09/07/2003 09/10/2003 Nuclear Welding General Inspection Procedure IP 55050 1
2 EB2-BF1
- U1 RECOVERY Other Routine 07/21/2003 07/25/2003 Testing Piping Support And Restraint Systems IP 70370 1
2 PS-RP
- RADIATION PROTECTION Baseline Inspections 08/11/2003 08/15/2003 Access Control to Radiologically Significant Areas IP 7112101 1, 2, 3 Baseline Inspections 08/11/2003 08/15/2003 ALARA Planning and Controls IP 7112102 1, 2, 3 Baseline Inspections 08/11/2003 08/15/2003 Radioactive Material Processing and Transportation IP 7112202 1, 2, 3 Baseline Inspections 08/11/2003 08/15/2003 Performance Indicator Verification IP 71151 1, 2, 3 1
PS-RP
- RAD PROTECTION SPECIAL INSPECT Other Routine 08/11/2003 08/15/2003 External Occupational Exposure Control And Personal Dosimetry IP 83724 1
Other Routine 08/11/2003 08/15/2003 Internal Exposure Control And Assessment IP 83725 1
Other Routine 08/11/2003 08/15/2003 Maintaining Occupational Exposures Alara IP 83728 1
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Browns Ferry Inspection / Activity Plan 03/01/2003 - 03/31/2004 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/04/2003 13:58:44 Report 22 4
EB1-TFP
- TFP - PRE-INSPECTION VISIT Baseline Inspections 08/18/2003 08/22/2003 Fire Protection IP 7111105T 2, 3 4
EB1-TFP
- TRIENNIAL FIRE PROTECTION INSP Baseline Inspections 09/08/2003 09/12/2003 Fire Protection IP 7111105T 2, 3 Baseline Inspections 09/22/2003 09/26/2003 Fire Protection IP 7111105T 2, 3 3
- FIRE PROTECTION PROGRAM REVIEW INSP Baseline Inspections 11/03/2003 11/07/2003 Fire Protection IP 7111105T 1
3 PI&R
- IDENTIFICATION AND RESOLUTION OF PROBLEM Baseline Inspections 11/03/2003 11/07/2003 Identification and Resolution of Problems IP 71152 1, 2, 3 1
- ISFSI CONSTRUCTION Other Routine 11/17/2003 11/21/2003 On-Site Fabrication Of Components And Construction On An ISFSI IP 60853 1, 2, 3 2
- REQUAL INSPECTION Baseline Inspections 11/17/2003 11/21/2003 Licensed Operator Requalification IP 7111111B 1, 2, 3 3
- IDENTIFICATION AND RESOLUTION OF PROBLEM Baseline Inspections 11/17/2003 11/21/2003 Identification and Resolution of Problems IP 71152 1, 2, 3 3
EB2-MODS - MODIFICATIONS/10CFR50.59 Baseline Inspections 01/05/2004 01/09/2004 Evaluation of Changes, Tests, or Experiments IP 7111102 2, 3 Baseline Inspections 01/05/2004 01/09/2004 Permanent Plant Modifications IP 7111117B 2, 3 1
PB6-FP
- FLOOD PROTECTION Baseline Inspections 01/26/2004 01/30/2004 Flood Protection Measures IP 7111106 1, 2, 3 1
EB2-ISI
- INSERVICE INSPECTION-U3 Baseline Inspections 03/22/2004 03/26/2004 Inservice Inspection Activities - BWR IP 7111108G 3
This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.