Review of Preliminary Accident Sequence Precursor Analysis of November 2001 Operational Condition
ML030640605
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/13/2003
From: Spaulding D
NRC/NRR/DLPM/LPD3
To: Cayia F
Nuclear Management Co
Spalding D, NRR/DLPM/LPD3-1, 415-2928
References
IR-01-017, TAC MB7832
Download: ML030640605 (4)


Text

March 13, 2003 Mr. Fred J. Cayia Site Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC Two Rivers, WI 54241

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - REVIEW OF PRELIMINARY ACCIDENT SEQUENCE PRECURSOR ANALYSIS OF NOVEMBER 2001 OPERATIONAL CONDITION (TAC NO. MB7832)

Dear Mr. Cayia:

Enclosed for your review and comment is a copy of the Preliminary Accident Sequence Precursor (ASP) Program analysis for operational conditions (Enclosure 1) which were discovered at the Point Beach Nuclear Plant, Units 1 and 2. These conditions were documented in NRC Inspection Report Nos. 50-266/01-17 and 50-301/01-17, dated February 2001. The results of our preliminary analysis indicate that the conditions may be precursors (difference in core damage probability > 1 x10-6) in the ASP Program.

In assessing operational conditions, the Nuclear Regulatory Commission (NRC) staff strives to make the ASP models as realistic as possible regarding the specific features and response of a given plant to various accident sequence initiators. We realize that licensees may have additional systems and emergency procedures, or other features at their plants that might affect the analysis. Therefore, we are providing you an opportunity to review and comment on the technical adequacy of the preliminary ASP analysis, including the depiction of plant equipment and equipment capabilities. Upon receipt and evaluation of your comments, we will revise the conditional core damage probability calculations where necessary to consider the specific information you have provided. The object of our review process is to provide as realistic an analysis of the significance of the conditions as possible.

In order for us to incorporate your comments, perform any required reanalysis, and prepare the final report of our analysis in a timely manner, you are requested to complete your review and to provide any comments within 60 calendar days from the date of this letter. We have streamlined the ASP Program with the objective of significantly improving the time after an event in which the final precursor analysis of the condition is made publicly available. As soon as our final analysis of this condition has been completed, we will provide for your information the final precursor analysis and the resolution of your comments.

We have also enclosed information to facilitate your review (Enclosure 2). Enclosure 2 (1) contains specific guidance for performing the requested review, (2) identifies the criteria which we will apply to determine whether any credit should be given in the analysis for the use of licensee-identified additional equipment or specific actions in recovering from the event, and (3) describes the specific information that you should provide to support such a claim.

F. J. Cayia This request is covered by the existing OMB clearance number (3150-0104) for NRC staff follow up review of events documented in licensee event reports. Your response to this request is voluntary and does not constitute a licensing requirement.

Due to the potential sensitivity of the information described in the enclosed ASP analysis, the NRC staff has not made the enclosure publicly available. If you believe that your response to this letter will include potentially sensitive information, please discuss the matter with me prior to submitting the information.

Please contact me at 301-415-2928 if you have any questions regarding this request.

Sincerely,

/RA/

Deirdre W. Spaulding, Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301

Enclosures:

1. Preliminary ASP Analysis (Sensitive - Not For Public Disclosure)
2. ASP Review Guidance cc w/o Enclosure 1: See next page

ML030640637 (Package)

ADAMS Accession No. ML030640605 (Letter)

ADAMS Accession No. ML030700165 (Enclosure 1)

ADAMS Accession No. ML030700177 (Enclosure 2)

OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME DSpaulding RBouling LRaghavan DATE 03/13/03 03/12/03 03/13/03

Point Beach Nuclear Plant, Units 1 and 2 cc w/o Enclosure 1:

Mr. John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Washington, DC 20037-1128 Mr. Richard R. Grigg President and Chief Operating Officer Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 53201 Site Licensing Manager Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 Ms. Sarah Jenkins Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Mr. Roy A. Anderson Executive Vice President and Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Nuclear Asset Manager Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 53201 October 2002