ML030640348
Jump to navigation
Jump to search
| ML030640348 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 09/18/2002 |
| From: | Gody A Operations Branch IV |
| To: | Anderson C Entergy Operations |
| References | |
| 50-313/02-302 50-313/02-302 | |
| Download: ML030640348 (1) | |
Text
ANO UNIT 1 EXAMINATION OUTLINE COMMENTS Job Performance Measure ANO-1-JPM-RO-RBC02, shown on the RO DRAFT Outline as Item B.1e, was never developed because the task was too simple. The task only involved opening two valves and allowing the reactor building to depressurize. Job Performance Measure ANO-1-JPM-RO-QT001 was substituted for this JPM.