Annual Report of Failures & Challenges to Pressurizer Power - Operated Relief Valves & Safety Valves for Period of January 1 - December 31, 2002
ML030630692
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/27/2003
From: Nietmann K
Constellation Energy Group
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML030630692 (1)


Text

Kevin J. Nietmann Plant General Manager Calvert Cliffs Nuclear Power Plant Constellation Generation Group, LLC 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4101 410 495-4787 Fax Constellation Energy Group February 27, 2003 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

SUBJECT:

REFERENCE:

Document Control Desk Calvert Cliffs Nuclear Power Plant Unit Nos. 1 & 2; Docket Nos. 50-317 & 50-318 Annual Report of Failures and Challenges to Pressurizer Power-Operated Relief Valves and Safety Valves for the Period of January 1 -December 31, 2002 (a)

Calvert Cliffs Units 1 and 2 Technical Specification 5.6.6 Reference (a) requires that an annual report shall be submitted documenting all failures of and challenges to the pressurizer power-operated relief valves and safety valves. There were no challenges to or failures of the pressurizer power-operated relief valves or safety valves on either unit during 2002.

Should you have questions regarding this matter, we will be pleased to discuss them with you.

Very truly yours, for Kevin J. Nietmann Plant General Manager KJN/CAN/dlm cc:

J. Petro, Esquire J. E. Silberg, Esquire Director, Project Directorate I-1, NRC G. S. Vissing, NRC H. 1. Miller, NRC Resident Inspector, NRC R. I. McLean, DNR A D6