ML030630688
| ML030630688 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 02/25/2003 |
| From: | Cooper D Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML030630688 (9) | |
Text
NMC Committed to Nuclear Excellence Palisades Nuclear Plant Operated by Nuclear Management Company, LLC February 25, 2003 10 CFR 26.71 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 PALISADES NUCLEAR PLANT DOCKET 50-255 LICENSE NO. DPR-20 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE REPORT JULY 1, 2002, THROUGH DECEMBER 31, 2002 Attached is the Nuclear Management Company, LLC, Semi-Annual Fitness For Duty Program Performance Report for the period July 1, 2002, through December 31, 2002.
This report is submitted in accordance with the requirements of 10 CFR 26.71(d).
Attachments 1 and 2 summarize test results at the Palisades Plant and the support locations.
SUMMARY
OF COMMITMENTS This letter contains no new commitments and no revisions to existing commitments.
Douglas E. Cooper Site Vice-President, Palisades CC Regional Administrator, USNRC, Region III Project Manager, USNRC, NRR NRC Resident Inspector - Palisades Attachments 27780 Blue Star Memorial Highway a Covert, MI 49043 Telephone: 616.764.2000
.Go P
ATTACHMENT 1 NUCLEAR MANAGEMENT COMPANY, LLC PALISADES NUCLEAR PLANT DOCKET 50-255 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE REPORT July - December 2002 2 Pages Follow
NUCLEAR MANAGEMENT COMPANY, LLC FFD PROGRAM PERFORMANCE REPORT July - December 2002
- 1.
MANAGEMENT
SUMMARY
A.
RANDOM TESTING During this reporting period, Nuclear Management Company conducted a total of 395 random tests with the following results:
Donor Group Employees Contractors Random Tests 307 88 Results Random testing did not identify any positive drug/alcohol results.
Random testing did not identify any positive drug/alcohol results.
The positive drug/alcohol rate for 2002 indicates a stable trend for employees and contractors:
Random Tests Employees C/N's 652 665 629 891 767 496 536 438 482 144 207 216 120 208 140 53 131 122 Positive Rate Employees C/V's 0.2%
0.0%
0.2%
0.2%
0.5%
0.2%
0.0%
0.0%
0.0%
Leading Substance Cocaine THC 1
1 0.7%
0.5%
0.9%
0.8%
0.0%
0.0%
0.0%
0.0%
0.0%
1 2
3 3
B.
PRE-ACCESS TESTING A total of 282 pre-access tests were conducted during this reporting access based on positive test results.
period. Three (3) individuals were denied C.
FOR CAUSE TESTING One (1) for-cause test was administered following credible information of the potential use of an illegal substance.
The test result was positive.
D.
APPEALS The appeal process was not initiated during this reporting period. 1994 1995 1996 1997 1998 1999 2000 2001 2002
- 2.
REPORTABLE EVENTS UNDER IOCFR26. SECTION 26.73 During this six-month interval, Palisades Nuclear Plant/Nuclear Management Company, LLC, did not encounter any FFD event that required reporting under 10 CFR 26.73.
ATTACHMENT 2 NUCLEAR MANAGEMENT COMPANY, LLC PALISADES NUCLEAR PLANT DOCKET 50-255 SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE REPORT July - December 2002 2 (2-sided) Pages Follow
NUCLEAR MANAGEMENT COMPANY Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Nuclear Management Company, LLC Company December 31, 2002 6 Months Ending Palisades Nuclear Plant Location Shed L. King Contact Name 269-764-2575 Phone (include Area Code)
Cutoffs: Screen/Confirmation (ng/ml) : Appendix A to 10 CFR 26 Marijuana
/
Amphetamines I
Cocaine
/
Phencyclidine I
Opiates
/
Alcohol (% BAC)* I
- Any detectable amount for situations other than random.
I I
Long-Term Short-Term Testing Results Licensee Contractor Contractor Employees Personnel Personnel Average Number With Unescorted Access 632 N/A 232 Categories Tested Positive Tested Positive Tested Positive Pre-Access 21 0
256 3
FOR Post-Accident 0
0 0
0 CAUSE Observed 0
0 1-1 Behavior Random 286 0
83 0
Follow-up 2
0 0
0 Other 0
0 0
0 TOTAL 309 0
340 4
Breakdown of Confirmed Positive Tests for Specific Substances Arnphe-Phency-Refusal Marijuana Cocaine Opiates tamines cidine Alcohol to Test 1
2 3
4 5
Licensee Employees Long-Term Contractors Short-Term Contractors 3
1 Total 3
1 I4 A
NUCLEAR MANAGEMENT COMPANY Fitness for Duty Program Performance Data Personnel Subject to 10 CFR 26 Nuclear Management Company, LLC Company Support Location Sheri L. King Contact Name Cutoffs: Screen/Confirmation (ng/ml) : Appendix A to 10 CFR 26 Marijuana
/
Amphetamines Cocaine
/
Phencyclidine, Opiates I
Alcohol (% BAC)*
December 31, 2002 6 Months Ending 269-764-2575 Phone (include Area Code)
/
I Long-Term Short-Term Testing Results Licensee Contractor Contractor Employees Personnel Personnel Average Number With Unescorted Access 78 NIA 24 Categories Tested Positive Tested Positive Tested Positive Pre-Access 5
0 0
0 FOR Post-Accident 0
0 0
0 CAUSE Observed 0
0 0
0 Behavior Random 21 0
5 0
Follow-up 0
0 0
0 Other 0
0 0
0 TOTAL 26 0
5 0 *Any detectable amount for situations other than random.
Breakdown of Confirmed Positive Tests for Specific Substances Amnphe-Phency-Refusal Marijuana Cocaine Opiates tamines didine Alcohol to Test 1
2 3
4 5
Licensee Employees Long-Term Contractors Short-Term Contractors Total
_0 A