Letter Sequence Draft Other |
---|
|
|
MONTHYEARML0225100022002-09-0606 September 2002 Ltr, Framatome Anp Request for Withholding Information from Public Disclosure (Tac Nos. MB4311 and MB4312) Project stage: Withholding Request Acceptance ML0305805472003-02-27027 February 2003 Memo - Submission of Draft Request for Additonal Information Control Rod Drive Mechanism Nozzle Relief Requests Project stage: Draft Other ML0306203852003-04-25025 April 2003 Relief, Associated with Reactor Vessel Closure Head Repair Project stage: Acceptance Review 2003-02-27
[Table View] |
|
---|
Category:Memoranda
MONTHYEARML23166A0042023-06-15015 June 2023 Summary of Meeting Concerning 2023 Annual Assessment of the Saint Lucie and the Turkey Point Nuclear Plants ML22276A2302022-10-0606 October 2022 Summary of September 13, 2022, Public Meeting with FPL Concerning Supplemental Information Needed for Acceptance of License Amendment Request to Replace Instrumentation with Digital Systems on Turkey Point, Units 3 and 4 ML22238A3142022-08-0707 August 2022 Documentation of Approval for Longer Review Period for Turkey Point Digital Instrumentation and Control License Amendment Requests Acceptance Review ML22145A3932022-05-25025 May 2022 Public Meeting Summary 2021 Annual Assessment Meeting 20220434 ML22034A3932022-02-16016 February 2022 Calendar Year 2021 Security Baseline Completion Memo ML21159A1352021-06-0808 June 2021 Public Meeting Summary Regarding the Saint Lucie Nuclear Plant, Units 1 and 2, Docket No. 50-335 and 389, and the Turkey Point Nuclear Generating Station Units 3 and 4, Docket No. 50-250 and 50-251; Meeting Number 20210505 ML20315A2642020-12-14014 December 2020 November 5, 2020, Summary of Drop-In Meeting with Nextera-Florida Power and Light to Discuss Pending Submittals Related to Digital Instrumentation and Controls and Improved Standard Technical Specifications ML20150A4732020-05-29029 May 2020 EOC Meeting Summary ML19330G0542019-11-22022 November 2019 Reconciliation - Analysis of EDO Response to ACRS Ltr - Response to ACRS Report on the Safety Aspects of the SLR Application of the Turkey Point Nuclear Generating Units 3 & 4 - December 2019 Fc Meeting ML19121A6072019-05-0101 May 2019 Summary of Public Meeting with Turkey Point Nuclear Plant to Discuss Annual Assessment of the Turkey Point Nuclear Plant with Public for Period of January 1, 2018 - December 31, 2018 ML18360A4452018-12-26026 December 2018 06/18/18 Summary of Interagency Meeting Related to Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4 ML18221A2652018-08-0909 August 2018 Referral Memorandum from the Secretary to the Atomic Safety and Licensing Board Panel ML18144A1242018-05-24024 May 2018 Summary of Public Meeting Concerning Annual Assessment of Turkey Point Nuclear Generating Station Unit 3 and Unit 4, for Period of January 1, 2017 December 31, 2017 ML18074A2522018-04-12012 April 2018 Status of Subsequent License Renewal Application ML17082A5102017-04-0606 April 2017 Verbal Authorization of Relief Request No. 5 for Repair of High Head Safety Injection Recirculation Test Line - Fifth 10-Year Inservice Inspection Interval ML18187A0332016-07-19019 July 2016 County Resolution to Seek a Commitment from FPL to Discontinue Use of the Cooling Canal System at the Turkey Point Power Plant ML16097A1402016-04-0404 April 2016 March 30, 2016, Summary of Public Meeting Turkey Point Nuclear Plant ML23333A0162016-03-0707 March 2016 Att H - MDC Report on Biscayne Bay Wq at Turkey Point CCS (March 4, 2016)-1 ML15222A5332015-08-10010 August 2015 Regulatory Audit in Support of Relief Request 1, Revised, for Fifth Ten-Year Inservice Inspection Interval ML14156A2212014-06-0404 June 2014 Public Meeting Summary - Turkey Point Nuclear Generating Station Docket Nos. 50-250 and 50-251 ML12222A0392012-08-0909 August 2012 8/16/2012 Cancellation Notice of Forthcoming Conference Call with NextEra Energy and Florida Power and Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Proto ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol ML1117101092011-06-22022 June 2011 Independent Spent Fuel Storage Installation Physical Security Plan and Verification of ASM Incorporation ML11160A0482011-06-10010 June 2011 Notice of Forthcoming Meeting with Florida Power & Light, to Discuss Turkey Point Extended Power Uprate License Amendment Request Currently Under Review ML1107405982011-03-16016 March 2011 Notice of Forthcoming Meeting with Florida Power & Light, Turkey Point, Units 3 & 4, to Discuss Extended Power Uprate License Amendment Request That Is Currently Under Review ML1106104272011-03-0707 March 2011 Notice of Forthcoming Pre-Application Meeting with Florida Power & Light Company and NextEra Energy Regarding Turkey Point, Units 3 and 4, St. Lucie, Units 1 and 2, Point Beach, Units 1, and 2, and Duane Arnold ML1100704852011-02-0404 February 2011 Close-out of National Fire Protection Association Frequently Asked 07-0030 on Establishing Recovery Actions ML1031205002010-11-10010 November 2010 Notice of Forthcoming Teleconference with Florida Power & Light to Discuss Differences Between the Turkey Point Spent Fuel Pool Criticality Analysis License Amendment Request Currently Under Review & Draft Division of Safety Systems Interim ML1030502252010-11-0505 November 2010 Verbal Authorization of Relief Request No. 9, Visual Examination of Containment Liner Repair ML1030100892010-11-0505 November 2010 Verbal Authorization of Relief Request No. 8, Transfer Canal Drain Line Piping Repairs ML1025601362010-09-0707 September 2010 Notice of Meeting with Florida Power & Light Company to Discuss the Florida Power & Light Company'S Forthcoming Applications for the Extended Power Uprates of St. Lucie Units 1 & 2 and Turkey Point Units 3 & 4, Focusing on the Topic of Spen ML1019405202010-07-14014 July 2010 Notice of Conference Call with Florida Power and Light Company to Discuss Draft Responses to NRC Requests for Additional Information for Generic Letter 2004-02 ML1018806202010-07-0808 July 2010 Notice of Forthcoming Meeting with Florida Power & Light, to Discuss with Representatives of Florida Power & Light Company (FPL) the Turkey Point, Units 3 and 4 Proposed Extended Power Uprate License Amendment Request ML1016704282010-06-17017 June 2010 Meeting Summary Notice ML1014501902010-05-26026 May 2010 Notice of Meeting with Florida Power & Light to Discuss the Turkey Point Alternative Source Term License Amendment Request That Is Currently Under Review ML1009105332010-04-0505 April 2010 U.S. Nuclear Regulatory Commission Staff Review of the Department of Homeland Security Consultation Reports ML1001900112010-01-19019 January 2010 Notice of Conference Call with Florida Power & Light Concerning Turkey Point Generic Letter 2004-02 Response ML1000800922010-01-0808 January 2010 Notice of Meeting with Florida Power & Light - Turkey Point Units 3 and 4, to Discuss Proposed License Amendment Request to Update Turkey Point Unit 3 Spent Fuel Pool Licensing Basis ML0934911442009-12-16016 December 2009 Summary of Category 2 Public Meeting with Nuclear Energy Institute to Discuss Health Physics Issues for New Reactors ML0925404602009-09-10010 September 2009 Summary of Phone Call with Industry to Issues Related to Eccentricity of the Steam Generator Tube-to-Tubesheet Joints in the Finite Element Model Used for the Technical Basis of the Permanent Alternate Repair Criteria License Amendment Requ ML0921805182009-08-0606 August 2009 Notice of Public Meeting with Florida Power & Light Energy IR 05000250/20090032009-07-30030 July 2009 IR 05000250-09-003, 05000251-09-003, on 04/01/2009 - 06/30/2009; Turkey Point Nuclear Power Plant, Units 3 and 4; Equipment Alignment, Fire Protection, Maintenance Effectiveness, Plant Modifications, Refueling and Other Outage Activities ML0910302212009-04-13013 April 2009 Meeting Notice, Meeting with Florida Power & Light Company Turkey Point Nuclear Plant, Units 3 and 4 ML0832502332008-12-0202 December 2008 Summary of Public Meeting with Operators of Vogtle Units 1 & 2, San Onofre Units 2 & 3, St. Lucie Unit 1, Turkey Point Unit 3, Indian Point Units 2 & 3, Nuclear Energy Institute, and Alion Science and Technology ML0807400842008-03-14014 March 2008 Draft Regulatory Guide for Comment ML0706400412007-03-0606 March 2007 Commitment Lists for Renewed Operating License (ROL) Plants with No Commitment Appendix Attached to Its ROL Sers/Nuregs for Use with IP-71003 ML0617805592006-07-10010 July 2006 Revised Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. ML0614505922006-05-26026 May 2006 Wits 200600198 - Actions to Be Taken in Response to Hurricane Lessons Learned Task Report ML0518904892005-07-14014 July 2005 Unit 2 - Closeout Letter for Bulletin 2003-01, Potential Impact of Debris Blockage on Emergency Sump Recirculation at Pressurized-Water Reactors. ML0506300702005-03-0202 March 2005 January Monthly Report on the Status of Open TIAs Assigned to NRR 2023-06-15
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARIR 05000250/20240102024-01-0505 January 2024 Focused Engineering Inspection 05000250/2024010 and 05000251/2024010 ML23226A0752023-08-14014 August 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23173A1522023-06-22022 June 2023 Request for Additional Information NextEra Fleet Emergency Plan Amendment Request ML23129A8322023-05-0505 May 2023 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - RCP LAR (L-2022-LLA-0128) ML23038A1892023-02-0303 February 2023 RP RFI April 2023 ML22311A5582022-11-22022 November 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep ML22311A4752022-11-0707 November 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4 - Request for Additional Information - ITS IR 05000250/20234012022-10-19019 October 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000250/2023401 and 05000251/2023401 ML22255A0502022-09-15015 September 2022 Supplemental Information Needed for Acceptance of Requested Licensing Action License Amendment Request to Replace Instrumentation with Digital Systems ML22229A5332022-08-18018 August 2022 Notification of Target Set Inspection and Request for Information (NRC Inspection Report No. 05000250 2022402 and 05000251 2022402) ML22181A0562022-06-30030 June 2022 NRR E-mail Capture - Request for Additional Information - Turkey Point U3 Sgtir (L-2022-LRO-0070) ML22081A0292022-03-21021 March 2022 NRR E-mail Capture - Turkey Point Nuclear Generating Unit No. 3 - Request for Additional Information - Icw Alternative ML22068A2352022-03-17017 March 2022 Licensed Operator Positive Fitness-For-Duty Test ML22074A0932022-03-14014 March 2022 RP RFI March 2022 ML21342A2932021-12-21021 December 2021 Supplemental Information Needed for Acceptance of Requested License Amendment Request Concerning Technical Specification Conversion to NUREG-1431, Revision 5 ML21298A0572021-10-25025 October 2021 NRR E-mail Capture - Final: Tpn Request for Additional Information - Round 2 Concerning Relief Request 10 - Extension EPID: L-2021-LLR-0077 ML21291A1272021-10-14014 October 2021 NRR E-mail Capture - Request for Additional Information - Fifth Ten-Year Inservice Inspection Interval Relief Request No.10 - Extension (L-2021-LLR-0077) ML21270A1652021-09-27027 September 2021 NRR E-mail Capture - Turkey Point Request for Additional Information Concerning Full Spectrum LOCA Methodology - EPID L-2021-LLA-0070 ML21252A2142021-09-0101 September 2021 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 - Request for Additional Information Concerning Relief Requests 8 and 9 ML21238A3282021-08-26026 August 2021 RP RFI October 2020 ML20315A0182020-11-10010 November 2020 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML20149K6262020-05-27027 May 2020 NRR E-mail Capture - Turkey Point Unit 4 - Request for Additional Information Concerning 2019 Steam Generator Tube Inspections ML20122A1172020-05-0101 May 2020 NRR E-mail Capture - Final: Turkey Point Units 3 and 4 Request for Additional Information Concerning Emergency Action Level Scheme Change (EPID L-2019-LLA-0271) (FPL: L-2019-203) ML20104B2232020-04-0909 April 2020 NRR E-mail Capture - Action: Turkey Point Unit 3 - Request for Additional Information Concerning Deferral of Steam Generator Inservice Inspections ML20084G5622020-03-20020 March 2020 NRR E-mail Capture - Turkey Point Containment Radiation Monitors Request for Additional Information ML20028C7372019-12-0202 December 2019 Notification of Inspection and Request for Information ML19184A1002019-07-0303 July 2019 NRR E-mail Capture - Turkey Point Nuclear Generating Unit Nos. 3 and 4, Request for Additional Information Regarding License Amendment Request 266 ML19101A3312019-04-11011 April 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 11 (EPID No. L-2018-RNW-0002) - Enclosure ML19087A2112019-03-28028 March 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 10 (EPID No. L-2018-RNW-0002) - Enclosure ML19073A0042019-03-14014 March 2019 Safety RAIs - Set 10 - Draft ML19053A6122019-02-22022 February 2019 Response Date Extension for RAIs Set 8, Revision 1, for the Safety Review of the Turkey Point Subsequent License Renewal Application ML19037A3982019-02-0606 February 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 9 (EPID No. L-2018-RNW-0002) - Enclosure ML19032A3972019-02-0101 February 2019 SLRA Request for Additional Information RAIs 3.5.2.2.2.6 Revision 1 Set 8 Final ML19016A2332019-01-16016 January 2019 NRR E-mail Capture - Request for Additional Information - Turkey Point LAR 265 PRA - NFPA RCP Seals - EPID L-2018-LLA-0280 ML18341A0042019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - E-Mail ML18341A0052019-01-15015 January 2019 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 8 (EPID No. L-2018-RNW-0002) - Enclosure ML18348A5852018-12-13013 December 2018 Emergency Preparedness Inspection and Request for Information ML18318A4332018-11-19019 November 2018 Supplemental Information Needed for Acceptance of License Amendment Request to Revise NFPA 805 License Condition for Reactor Coolant Pump Seals ML18292A7462018-10-31031 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 7 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2282018-10-0404 October 2018 Request for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 6 (EPID No. L-2018-RNW-0002) - Enclosure ML18269A2102018-10-0101 October 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 4 (EPID L-2018-RNW-0002) - Enclosure ML18243A0072018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 3 (EPID No. L-2018-RNW-0002) - Email ML18243A0062018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 1 ML18259A0002018-09-17017 September 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application; Set 3 (EPID No. L-2018-RNW-0002) - Enclosure 2 ML18248A1592018-09-15015 September 2018 Requests for Additional Information for the Turkey Point Subsequent License Renewal Application - Environmental Set 3 (EPID No. L-2018-LNE-0001) - Email ML18248A1602018-09-15015 September 2018 Requests for Additional Information for the Turkey Point Subsequent License Renewal Application - Environmental Set 3 (EPID No. L-2018-LNE-0001) - Enclosure ML18232A5132018-08-20020 August 2018 SLRA Safety RAIs - Set 2 - RAIs ML18232A5142018-08-20020 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 2 ML18232A5462018-08-20020 August 2018 Safety RAIs - Set 2 - Draft ML18218A2002018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - Enclosure 2024-01-05
[Table view] |
Text
February 27, 2003 MEMORANDUM TO: Allen G. Howe, Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Eva A. Brown, Project Manager, Section 2 /RA/
Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
TURKEY POINT UNITS 3 AND 4 - SUBMISSION OF DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING CONTROL ROD DRIVE MECHANISM NOZZLE RELIEF REQUESTS (TAC NOS. MB4311 AND MB4312)
On January 6, 2003, the following request for additional information (RAI) in draft form was forwarded to Florida Power and Light (FPL).
Please comment on whether successive inspections are going to be performed on the new pressure retaining welds, which are deposited approximately mid-wall of the reactor pressure vessel head. This discussion should include the type of nondestructive examination that is going to be performed and the frequency.
The RAI is related to FPLs request for relief dated March 1, 2002, from the American Society of Mechanical Engineering Code requirements regarding control element drive mechanisms. The licensee submitted their reply to the RAI on January 30, 2003. On January 30, 2003, FPL was informed that the January 30, 2003, reply failed to provide an adequate plan for successive inspections for the new pressure retaining welds. The Nuclear Regulatory Commission's justification was related to the pending inspection requirements for the reactor pressure vessel head, which was issued as an Order on February 11, 2003. The licensee indicated on February 12, 2003, their intent to commit to performing successive inspections on the affected welds only at the next outage, instead of two outages as previously communicated in their January 30, 2003, letter. This commitment would be included in a supplement to their RAI response.
Docket Nos. 50-250 and 251
February 27, 2003 MEMORANDUM TO: Allen G. Howe, Chief, Section 2 Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation FROM: Eva A. Brown, Project Manager, Section 2/RA/
Project Directorate II Division of Licensing Project Management Office of Nuclear Reactor Regulation
SUBJECT:
TURKEY POINT UNITS 3 AND 4 - SUBMISSION OF DRAFT REQUEST FOR ADDITIONAL INFORMATION REGARDING CONTROL ROD DRIVE MECHANISM NOZZLE RELIEF REQUESTS (TAC NOS. MB4311 AND MB4312)
On January 6, 2003, the following request for additional information (RAI) in draft form was forwarded to Florida Power and Light (FPL).
Please comment on whether successive inspections are going to be performed on the new pressure retaining welds, which are deposited approximately mid-wall of the reactor pressure vessel head. This discussion should include the type of nondestructive examination that is going to be performed and the frequency.
The RAI is related to FPLs request for relief dated March 1, 2002, from the American Society of Mechanical Engineering Code requirements regarding control element drive mechanisms. The licensee submitted their reply to the RAI on January 30, 2003. On January 30, 2003, FPL was informed that the January 30, 2003, reply failed to provide an adequate plan for successive inspections for the new pressure retaining welds. The Nuclear Regulatory Commission's justification was related to the pending inspection requirements for the reactor pressure vessel head, which was issued as an Order on February 11, 2003. The licensee indicated on February 12, 2003, their intent to commit to performing successive inspections on the affected welds only at the next outage, instead of two outages as previously communicated in their January 30, 2003, letter. This commitment would be included in a supplement to their RAI response.
Docket Nos. 50-250 and 251 Distribution PUBLIC PDII-2 Reading File EBrown BClayton (Hard Copy) AHowe ADAMS ACCESSION NO. ML030580547 OFFICE PDII-2/PM PDII-2/LA PDII-2/SC NAME EBrown BClayton AHowe DATE 02/13/03 02/13/03 02/24/03 OFFICIAL RECORD COPY