ML030580528
| ML030580528 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 02/19/2003 |
| From: | Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| Download: ML030580528 (8) | |
Text
- 62-34/
DETROIT EDISON - FERMI 2 AUTOMATED RECORD MANAGEMENT DISTRIBUTION CONTROL LIST 02/19/03 TO: 00935 US NRC PAGE 1 DOCUMENT CNTRL DESK WASHINGTON, DC 20555 Media: 8 1/2 X 11 Number Cnt Issue DTC Doc. Serial Number Page Rev Copies Lvl Date Sec Status TMTRM TRM VOL I 61 11 IR 02/19/03 AFC Please destroy or mark all revised, superseded, or cancelled documents as such. CONTROLLED stamps must be voided by lining through and initialing.
Detroit Edison EF2, C/O Info Mgmt 140 NOC, 6400 North Dixie Highway, Newport MI 48166. (734) 586-4338 OR (734) 586-4061 for questions or concerns.
Ref: e52186 A-00
-LICENSING DOCUMENT TRANSMITTAL FERMI 2 TECHNICAL .REQUIREMENTS MANUAL - VOL I Revision 61 dated 2/19/03 "Immediately,-uponreceipt of the item(s) below, please -insert-and/or remove the pages indicated.
Destroy the removed pages. Be sure that Revision 60 dated 1/27/03 has been -insertedprior to
-insertingthese pages.
'Location Remove Insert In Front of TRM Manual Title Page Rev 60 1/27/03 Title Page Rev 61 2/19/03 Immediately following List of Effective Pages List of Effective Pages Title Page LEP-1 through LEP- 4 Rev 60 1/27/03 LEP-1 through LEP- 4 Rev 61 2/19/03 3.8 Electrical Power Page TRM 3.8-13 Rev 31 10199 'Page TRM 3.8-13 Rev 61 02/03 Systems END
Fermi 2 Technical Requirements Manual Volume I Detroit
- Edison ARMS - INFORMATION '
DTC: TMTRM .Tile: 1754 F IDSN: TRM VOL I Rev: 61 Date: 2/19/03 Recipient 9 Z,y...
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF 'EFFECTIVE PAGES Page Revision -Pacge Revision TRMi Revision 31 TRM 3.3-32 Revision 31 TRM *3.3-33 Revision 31 TRM ii Revision 31 Revision 31 TRM iil Revision 31 TRM 3.3-34 Revision 34 TRM 3.3-35 Revision 60 TRM iv Revision 31 TRM 3.3-36 Revision 41 TRM v Revision 31 TRM vi Revision 31 TRM 3.3-37 Revision 31 TRM 3.3-38 Revision 31 TRM 1. O-a Revision 31 TRM 3.3-39 Revision 31 TRM 1.0-1 Revision 31 TRM 3.3-40 Revision 56 TRM 2.0-1 Revision 31 TRM 3.3-41 Revision 56 TRM3.0-a Revision 31 TRM 3.3-42 Revision 45 TRM3.0-1 Revision 31 TRM 3.3-43 Revision 31 TRM 3.0-2 Revision 54 TRM 3.3-44 Revision 31 TRM 3.0-3 Revision 31 TRM 3.3-45 Revision 31 TRM 3.0-4 Revision 31 TRM 3.3-46 Revision 31 TRM 3. l-a Revision 31 TRN 3.3-47 Revision 31 TRM 3.1-1 Revision 31 TRM 3.3-48 Revision 31 TRM 3.2-1 Revision 31 TRM 3.3-49 Revision 31 TRM 3.3-a
-Revision 31 TRM 3.4-a Revision 31 TRM 3.3-b 31 TRM 3.4-1 Revision 36 TRM 3.3-c Revision 3.3-d Revision 31 TRM 3.4-1a Revision "34 TRM TRM 3.4-lb Revision 34 3.3-1 Revision 34 Revision 59 TEN 3.4-2 Revision 31
- TRM 3.3-2 Revision 31 TRM 3.4-3 Revision 31 TRM3.3-3 TRM 3.3-4 Revision 31 TRM 3.4-4 Revision 31 TRM Revision 31 TRM 3.4-5 Revision 31 3.3-5 TRM TRM 3.4-6 Revision 31 3.3-6 Revision 31 TRM TRM 3.4-7 Revision 31 3.3-7 Revision 31 TRM 31 TRM 3.4-8 Revision 31 3.3-8 Revision TRM Revision 31 TRM 3.4-9 Revision 31 3.3-9 TRM TEM 3.4-10 Revision 31 3.3-10 Revision 31 TRM Revision 31 TRM 3.5-1 Revision 31 3.3-11 TRM Revision 31 TRM 3.6-a Revision 31 !
TRM 3.3-12 TEN. 3.6-1 Revision 60 3.3-13 Revision 31 TRM Revision 31 TRM 3.6-2 Revision 60 3.3-14 TRM Revision 31 TRM 3.6-3 Revision 31 TEM 3.3-15 Revision 31 TRM 3.6-4 Revision 55 3.3-16 TRM Revision 31 TRM 3.6-5 Revision 31 3.3-17 TRM TRM 3.6-6 Revision 33 3.3-18 Revision 52 TEM 31 TRM 3.6-7 Revision 31 3.3-19 Revision TRM Revision 31 TRM 3.6-8 Revision 31 3.3-20 TRM 59 TRM 3.6-9 Revision 31 3.3-21 Revision TRM Revision 31 TRM 3.6-10 Revision 31 3.3-22 TRM Revision 31 TRM 3.6-11 Revision 31 3.3-23 TRM TRM 3.6-12 Revision 31 3.3-24 Revision 31 TRM Revision 31 TRM 3.6-13 Revision 31 3.3-25 TRM 31 TRM 3.6-14 Revi-sion 31 3.3-26 Revision TRM TRM 3.6-15 .Revision 31 3.3-27 Revision 31 TRM TRM 3.6-16 Revision 31 3.3-28 Revision 31 TRM Revision 31 TRM 3.6-17 Revision 31 3.3-29 TRM TRM 3.6-18 Revision 31 3.3-30 Revision 31 TRM Revision 31 TRM 3.6-19 Revision 31 3.3-31 TRM Vol. I LEP-I REV 61 2/19/03
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 3.6-20 Revision 31 TRM 3.8-14 Revision 46 TRM 3.6-21 Revision 31 TRM 3.8-15 Revision 31 TRM 3.6-22 Revision 31 TRM 3.8-16 Revision 31 TRM 3.6-23 Revision 31 TRM 3.e-17 Revision 43 TRM 3.6-24 Revision 58 TRM 3.8-18 Revision 33 TRM 3.6-25 Revision 31 TRM 3.9-a Revision 31 TRM 3.6-26 Revision 31 TRM 3.9-1 Revision 31 TRM 3.6-27 Revision 31 TRM 3.9-2 Revision 31 TRM 3.6-28 Revision 31 TRM 3.9-3 Revision 31 TRM 3.6-29 Revision 31 TRM 3.9-4 Revision 31 TRM 3.6-30 Revision 31 TRM 3.9-5 Revision 31 TRM 3.6-31 Revision 31 TRM 3.10-1 Revision 31 TEN 3.6-32 Revision 60 TRM 3.11-a .Revision 31 TRM 3.6-33 Revision 31 TRM 3.11-1. Revision 31 TRM 3.6-34 Revision 31 TRM 3.12-a Revision 31 TRM 3.6-35 Revision 31 TRM 3.12-1 Revision 31 TRM 3.7-a Revision 31 TRM 3.12-2 -Revision 31 TRM 3.7-b Revision 31 TRM 3.12-3 Revision 31 TRM 3.7-1 Revision 60 TRM 3.12-4 Revision 53 TRM 3.7-2 -Revision 31 TRM 3.12-5 "Revision 53 TRM 3.7-3 Revision 31 TRM 3-12-:6 Revision 53 TRM 3.7-4 Revision 31 TRM 3.12-7 Revision 31 TRM 3.7-5" Revision 31 TRM 3.12-8 Revision 57 TRM 3.7-6 Revision 31 TRM 3.12-9 Revision 40 TRM 3.7-7 Revision 31 TRM 3.12-10 Revision 31" TRM 3.7-8 Revision'31 TRM 3.12-11
- Revision "*49 TEN 3.7-9 Revision 31 TRM 3.12-12 Revision 31 TRM 3.7-10 Revision 44 TRM 3.12-13 Revision 31 TRM 3.7-11 Revision 31 TRM 3.12-14 Revision 31 TRM 3.7-12 Revision 31 TRM-3.12-15 Revision 31 TRM 3.7-13 Revision 31 TRM 3.12-16 Revision 31 TRM 3.7-14 Revision 31 TRM 3.12-17 Revision 31 TRM 3.7-15 'Revision 31 TEM 3.12-18 Revision 31 TRM 3.7-16 Revision 31 TRM 3.12-19 Revision 31 TRM 3.7-17 Revision 31 TRM 3.12-20 Revision 31 TRM 3.7-18 Revision 31 TRM 3.12-21 Revision 31 TRM 3.7-19 Revision 31 TRM 3.12-22 -Revision 31 TRM 3.7-20 Revision 31 TRM 3.12-23 Revision 31 TRM 3.8-a Revision 31 TRM 3.12-24 Revision 31 TRM 3.8-1 Revision 31 TRM 3.12-25 Revision 31 TRM 3.8-2 Revision 31 TRM 3.12-26 Revision 31 TRM 3.8-3 Revision 60 TRM 3.12-27 Revision 31 TRM 3.8-4 Revision 31 TRM 3.12-28 Revision 31 TRM 3.8-5 Revision 31 TRM 3.12-29 Revision 31 TRM 3.8-6 Revision 50 TRM 3.12-30 Revision 31 TRM 3.8-7 Revision 50 TRM 4.0-1 Revision 31 TRM 3.8-8 Revision 50 TRM 5.0-a Revision 31 TRM 3.8-9 Revision 50 TRM 5.0-1 Revision 31 TRM 3.8-10 Revision 50 TRM 5.0-2 Revision 31 TRM 3.8-11 Revision 50 TRM 5.0-3 Revision 31 TRM 3.8-12 Revision 31 TRM 5.0-4 Revision 31 TRM 3.8-13 Revision 61 TRM 5.0-5 ,Revision 31 TRM Vol. I LEP-2 REV 61 2/19/03
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES Page Revision Page Revision TRM 5.0-6 Revision 31 TRM B3.6.3-1 Revision 31 TRM5.0-7 Revision 31 TRM B3.6.4-1 Revision 31 TRM 5.0-8 Revision 31 TRMB3.6.5-1 Revision 31 TRM 5.0-9 Revision 31 TRM B3.6.6-1 Revision 31 TRMB1.0-1 Revision 31 TRMB3.6.7-1 Revision 31 TRMB2.0-1 Revision 31 TRM B3.6.8-1 Revision 31 TRM B3.0-1 Revision 31 TRM B3.7. 1-I Revision 31 TRM B3.0-2 Revision 31 TRMB3.7.2-1 Revision 31 TRMB3.0-3 .Revision 31 TRM B3.7.3-1 Revision 31 TRMB3.0-4 Revision 31 TRM B3.7.4-1 Revision 31 Revision 54 TRMB3.7.4-2 Revision 31 TRM B3. 0-5 Revision 54 TRM B3.7.5-1 Revision 31 TRM B3.0-6 Revision 54 TRM-B3.7.6-1 Revision 31 TRM B3.0-7 Revision 31 TRMB3.7.7-1 Revision 31 TRM B3. 1-1
- TRM TRMB3.2-1 Revision 31 B3.7.8-1 Revision 31 Revision 31 TRMB3.7.9r-.. Revision 31
.TRMB3.3. 1-1 TRM B3.3.1-2 Revision 31 TRMB3.7.,9-2 Revision 31 Revision 31 TRMB3.8.'1-1 Revi-sion 31 TRMB3.3.2-1 Revision 31 TRM B3.8.2-1 Revi-sion 31 TRMB3.3.2-2 TRM B3.3.3-1 Revision 31 TRM B3.8.3-1 Revision 31 Revision 31 .TRMB3.8.4-1 Revision 31 TRMB3.3.4-1 Revision 31 TRM B3.8:5-1" Revisidn 31
', TRMB3.3.'4-2 Revision 31 TRMB3.8.6-1 .Revision .43 TRMB3.3.5-1
-Revision 31 TRIM b3.9. 1-2 Reviksion 31 TRM' B3.3.-5-2 TRMB3.3.'6-1 Revision 31 TRM B3.9.2-1 Revision 31
- " TRMB3.3.6-2. Revision 31 TRMB3.9.3-1 Revision 31 Revision 31 TRMB3.9.4-i Revision 31..
TRM B3.3.6-3 Revision 31 TRMB3. 10-?1 Revision .31 TRM B3.3.'6-4 Revision 31 TRM B3. 11. 1-1 Revision 31 TRMB3.3 .'6-5 Revision 31 TRMB3.12.1-1
- Revision 31 TRMB3.3.7-1 TRM B3.3.7-2 Revision 31 TRMB3.12.2-1 Revision 44 TRM B3.3.8-1 Revision 31 TRMB3.12.3-1 Revision 31 TRM TRM B3.3.9-1 Revision 31 B3.12.4-1 ReviSion 31 TRM TRM B3.3.10-1 Revision 56 B3.12.5-1 Revision 31 TRM TRMB3.3.11-1 Revision 45 B3.12.6-2 Revision 31 TRM TRM B3.3.12-1 Revision 31 B3.12.7-1 Revision 31 TRM TRM B3.3.13-1 Revision 31 B3.12.8-1 Revisiori 31 TRMB3.3.14-1 Revision 31 TRM B3.4.1-I Revision 31 TRM B3.4.1-2 Revision 34 TRM B3.4.1-3 Revision 34 TRMB3.4.1-4 Revision 34 TRMB3.4.1-5 Revision 34 TRMB3.4.2-1 Revision 31 TRM B3.4.3-1 Revision 31 TRMB3.4.4-1 Revision 31 TRMB3.4.5-1 Revision 31 TRMB3.4.6-1 Revision 31 TRMB3.4.7-1 Revision 31 TRM B3.5-1 Revision 31 TRMB3.6. 1-1 Revision 31 TRM B3.6.2-1 Revision 31 TRM Vol. I LFP-3 REV 61 2/19/03
FERMI 2 - TECHNICAL REQUIREMENTS MANUAL VOL I LIST OF EFFECTIVE PAGES CORE OPERATING LIMITS REPORT COLR 9, Revision 0 Page Revision Notation Page 1 0 2 0 3 0 4 0 5 0 6 0 "7 0 8 0 9 0 10 0*
11 0 12 0 "13 0
- "14 0
- 15 0
.:
- 16 0 17
".0 TRM Vol. I LEP-4 :REV 61 2/19/03
- Primary Containment Penetration Conductor Overcurrent Protective Devices TR 3.8.5 ACTI6NS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME B. :One or-more 480 volt B.1 Declare the affected Immediately primary containment system(s) or
- penetration component(s)
- overcurrent protective inoperable.
.devices inoperable.
AND B.2.2 Remove the inoperable 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 480 volt device(s) from service by racking out the device.
OR B.2.2 Remove the inoperable 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> 480 volt device(s) from service by removing the device.
OR 13.2.3 Remove the in-line power fuses associated with the inoperable 480 volt device(s).
- AND B.3 Verify the inoperable Once per 7 days 480 volt device(s) thereafter racked out, removed, or in-line power fuses removed. I C. ýRequired Action and C.1 Enter TRLCO 3.0.3. Immediately 4associated Completion Time of Condition A or Bnot met.
TRM Vol. I TRM 3.8-13 REV 61 02/03 J
I