ML030550616
| ML030550616 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 02/19/2003 |
| From: | Izard J South Texas |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NOC-AE-03001471, STI:31562028 | |
| Download: ML030550616 (4) | |
Text
Nuclear Operating Company South T..as Pmrect Elec Generatin& Station PO Box 289 Wadsworth. Texas 77483 A
February 19, 2003 NOC-AE-03001471 10CFR26.71(d)
STI: 31562028 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket No. STN 50-498, STN 50-499 Semiannual Fitness for Duty Program Performance Report for the Second Half of 2002 Pursuant to 10CFR26.71(d), STP Nuclear Operating Company (STPNOC) submits the attached Semiannual Fitness for Duty (FFD) Program Performance Report for the second half of 2002. This report covers the period from July 1, 2002 through December 31, 2002.
STPNOC Quality Assurance Department audited the FFD Program during this performance period. The audit found no program deficiency.
If you should have any questions on this matter, please contact Ms. Lisa Matula at (361) 972-7444 or me at (361) 972-7694.
John Izard
- Manager, Compensation/Benefits
&HRIS MKJ/
Attachment:
Semiannual FFD Program Performance Report for the Second Half of 2002 wp'n1\\nrc-ap\\rrep-2003\\ 03001471 doc
NOC-AE-03001471 Page 2 of 2 cc:
(paper copy)
(electronic copy)
Ellis W. Merschoff Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, Texas 76011-8064 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Richard A. Ratliff Bureau of Radiation Control Texas Department of Health 1100 West 49th Street Austin, TX 78756-3189 Cornelius F. O'Keefe U. S. Nuclear Regulatory Commission P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 A. H. Gutterman, Esquire Morgan, Lewis & Bockius LLP L. D. Blaylock/W. C. Gunst City Public Service Mohan C. Thadani U. S. Nuclear Regulatory Commission R. L. Balcom Texas Genco, LP A. Ramirez City of Austin C. A. Johnson AEP Texas Central Company Jon C. Wood Matthews & Branscomb C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704 wp\\nl\\nrc-ap\\rrep-2003\\ 03001471 doc
I Attachment NOC-AE-03001471 Page 1 of 2 STP NUCLEAR OPERATING COMPANY SEMI-ANNUAL FITNESS FOR DUTY PROGRAM PERFORMANCE REPORT July 1, 2002 through December 31, 2002 During the second performance period of 2002, the STPNOC FFD Program conducted a total of 2009 FFD screening tests that resulted in thirteen positive test results. Of the thirteen positive tests one individual tested positive for two substances which resulted in 14 total confirmations. The positives were comprised of short-term contractors, whose unescorted access was denied. Eleven of the positives were pre-access tests. STPNOC conducted 289 random tests resulting in a random testing rate of 30% of the average annual population with an annual random testing rate of 50%.
STPNOC did not have any 10CFR26.73 reportable events during the performance period.
wp\\nl\\nrc-ap\\rrep-2003\\ 03001471 doc Breakdown of Confirmed Positive Tests For Specific Substances Marijuana 50ng Cocaine Opiates Amphetamines Phencyclidine Alcohol Refusal To Test Total Licensee 0
0 0
0 0
0 0
0 Employees Long Term 0
0 0
0 0
0 0
0 Employees Short 6
3 2
0 0
2 1
14 Term Employees Total 6
3 2
0 0
2 1
14
4 t
Attachment NOC-AE-03001471 Page 2 of 2 STP NUCLEAR OPERATING COMPANY FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10CFR26 STP Nuclear ODeratine Companv Company December 2002 Period end South Texas Project Electric Generating Station Location Lisa H. Matula Supervisor Marijuana Cocaine Opiates 361-972-7444 Telephone Cutoff: Screen/Confirmation (ng/ml) 50/15 Amphetamine 300/150 Phencyclidine 300/300 Alcohol (%BAC) 1000/500 25/25
.04/.04 wp\\nl'nrc-ap'rrep-2003\\ 03001471 doc
- Testing Results Licensee Employees Long Term Contractor Short Term Contractor Employees' Employees Average # With U~nescorted Access 1185 36321 Categories
- Tested
- Positive
- Tested,
- Positive
- Tested
- Positive Pre-Access 6
0 3
0 1688 11 Post Accident 0
0 0
0 1
0 Observed Behavior 0
0 0
0 7
1 Random 156 0
16 0
117 1
Follow-Up 15 0
0 0
0 0
Other 0
0 0
0 0
0 Total 177 0
19 0
1813 13