Text
Feb.
06, 2003 Page 1
of 1
MANUAL HARD COPY DISTRIBUTION DOCUMENT TRANSMITTAL 2003-54 USER INFORMATION:
CA#:
0363 TRANSMITTAL INFORMATION:
02/06/2003 LOCATION:
DOCUMENT CONTROL DESK PROM:
NUCLEAR RECORDS DOCUMENT CONTROL CENTER
-NUCSA-2)
KýHE FOLLOWING CHANGES HAVE OCCURRED TO THE HARDCOPY OR ELECTRONIC MANUAL ASSIGNED TO YOU:
109 109 -
TECHNICAL SUPPORT CENTER (TSC)
RADIO COMMUNICATOR:
EMERGENCY PLAN-POSITION SPECIFIC PROCEDURE REMOVE MANUAL TABLE OF CONTENTS DATE:
02/27/2002 ADD MANUAL TABLE OF CONTENTS DATE:
02/05/2003 CATEGORY:
PROCEDURES TYPE:
EP ID:
EP-PS-109 ADD:
PCAF 2003-1058 REV:
N/A UPDATES FOR HARD COPY MANUALS WILL BE DISTRIBUTED WITHIN 5 DAYS IN ACCORDANCE WITH DEPARTMENT PROCEDURES.
PLEASE MAKE ALL CHANGES AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX UPON RECEIPT OF HARD COPY.
FOR ELECTRONIC MANUAL USERS, ELECTRONICALLY REVIEW THE APPROPRIATE DOCUMENTS AND ACKNOWLEDGE COMPLETE IN YOUR NIMS INBOX.
.5rv - 1 /
vhmmmýýý
PROCEDURE CHANGE PROCESS FORM "P
- 1. PCAF NO. *.jj/'g
- 12.
PAGE 1 OF
(
i3. PROC.NO.
EP-PS-109X'---
REAVL?
- 4.
FORMS REVISED A R R
R R
R
__R
- 5.
PROCEDURE TITLE TSC Radio Communicator: Emergency Plan Position Specific Procedure
- 6.
REQUESTED CHANGE PERIODIC REVIEW
[I NO El YES INCORPORATE PCAFS LI NO MI YES REVISION LI PCAF DELETION
[-] (CHECK ONE ONLY)
- 7.
SUMMARY
OF I REASON FOR CHANGE Revised steps in procedure to allow use of new radio equipment installed in the TSC.
4, 44
/',,,
444Continued r
- 8.
DETERMINE COMMITTEE REVIEW REQUIREMENTS (Refer to Section 6.1.4)
'/,
1 PORC REVIEW REQ'D?
[D NO.,LI.YES
- 9.
PORC MTG#
N/A BLOCKS 11 THRU 16 ARE ON PAGE OF FOhRM
- 17.
T.C. Dalpiaz I
3227 I
1/27/2003
- 18. COMMUNICATION OF CHANGE REQUIRED?
PREPARER DATE NO Z YES (TYPE) Training of Radio (Print or Type) 4, Communicators
.SIGNATURE ATTESTS THAT RESPONSIBLE SUPERVISOR HAS
- 19.
CONDUCTED QADR AND TECHNICAL REVIEW UNLESS OTHERWISE DOCUMENTED IN BLOCK 16 OR ATTACHED REVIEW FORMS.
sCROSS DISCIPLINE REVIEW (IF REQUIRED) HAS BEEN COMPLETED BY SIGNATURE IN BLOCK 16 OR ATTACHED REVIEW FORMS.
- 20.
12103 EMM APPROVAL DATE ENTER NIA IF FUM HAS APPROVAL AUTHORITY 2_
INTSIBLE APPROVER /A/T INITIALS DATE FORM NDAP-QA-0002-8, Rev. 8, Page 1 of 2 (Electronic Form)
=
p '.*.,
- PROCEDURE CHANGE PROCESS FORM 11, 7
- 1. PCAFNO.,
. -/a I2. PAGE2OF
- 13. PROC.NO. EP-PS-109 REV L.
- 11.
This question documents the outcome of the 50.59 and 72.48 Review required by NDAP-QA-0726. Either la, b, c or d must be checked "YES" and the appropriate form attached or referenced.
- a. This change is an Administrative Correction for which 50.59 and 72.48 are not E1 YES Z
N/A applicable.
- b. This change is a change to any surveillance, maintenance or administrative Z
YES N/A procedure for which 50.59 and 72.48 are not applicable.
- c. This change is bounded by a 50.59/72.48 Screen/Evaluation, therefore, no new Ej YES Z
N/A 50.59/72.48 Evaluation is required.
Screen/Evaluation No.
- d. 50.59 and/or 72.48 are applicable to this change and a 50.59/72.48
-- YES Z
N/A Screen/Evaluation is attached.
Z YES Change Request No.
N/A
- 13.
Should this change be reviewed for potential effects on Training Needs or Material?
YES NO If YES, enter an Action Item @ NIMS/Action/Gen Work Mech/PICN
- 14.
Is a Surveillance Procedure Review Checklist required per NDAP-QA-0722?
YES,
NO
- 15.
Is a Special, Infrequent or Complex Test/Evolution Analysis Form required per Ej YES Z
NO NDAP-QA-0320? (SICT/E form does not need to be attached.)
- 16. Reviews may be documented below or by attaching Document Review Forms NDAP-QA-0101-1.
REVIEWED BY WITH DATE REVIEW NO COMMENTS QADR TECHNICAL REVIEW REACTOR ENGINEERING/NUCLEAR FUELS
- IST **
OPERATIONS NUCLEAR SYSTEMS ENGINEERING NUCLEAR MODIFICATIONS MAINTENANCE HEALTH PHYSICS NUCLEAR TECHNOLOGY CHEMISTRY OTHER 50.54Q review AZ,/ 1 7A 3
Required for changes that affect, or have potential for affecting core reactivity, nuclear fuel, core power level indication or impact the thermal power heat balance. (58)
Required for changes to Section Xl Inservice Test Acceptance Criteria.
FORM NDAP-QA-0002-8, Rev. 8, Page 2 of 2 (Electronic Form)
PAGE-OF QF EP-PS-109 Revisiont */,
Page 2of3,.
TECHNICAL SUPPORT CENTER (TSC) RADIO COMMUNICTOR:
Emergency Plan-Position Specific Procedure WHEN:
HOW NOTIFIED:
REPORT TO:
WHERE TO REPORT:
Technical Support Center (TSC) is activated Paged/Telenotification System Damage Control Team Coordinator (DCTC)
TSC OVERALL DUTY:
Provide communication back and forth between the work groups in the field (India teams) and the TSC.
MAJOR TASKS:
Prepare to take over dispatching and communicating with the in-plant (India) teams.
Maintain communications between the in-plant (India) teams and the TSC, dispatching new teams as needed.
TAB:
TAB A TAB B REVISION:
4 K
I I
I
PGAFG PAGE O-i TABA EP-PS-109-A
- Revision, Page 1 of 3 MAJOR TASK:
Prepare to take over dispatching and communicating with the in-plant (India) teams.
SPECIFIC TASKS:
HOW:
- 1.
Notify the "DAMAGE CONTROL TEAM COORDINATOR" of your arrival.
- 2.
Verify UHF radio operability.
la.
Identify yourself as the "TSC RADIO COMMUNICATOR".
2a.
Call the "OSC" and request a radio operability check.
(1)
Select desired System using "Double Up Arrow" and "Double Down Arrow" Buttons.
(2)
Select desired Talk-Group within selected System (if needed) using "Single Up Arrow" and "Single Down Arrow" Buttons.
System 1
2 3
4 26 Talk-Group(s)
SEC PRI SEC BACKUP OPS 1; OPS 2 E PLAN A; E PLAN B OPS 1 ALT; OPS 2 ALT; SEC ALT; E PLAN ALT NOTE: If selection of"E PLAN A" Talk group is desired, the "HOME" button can be used switch directly to this Talk-group.
(3)
Adjust Volume Control knob to desired audio level as necessary.
(4)
Depressing either the Transmit key OR the handset "Push To Talk" (PTT) bar will allow the user to transmit audio.
NOTE: Audio is not transmitted until the TX LED turns on, indicating that the radio has acquired a channel.
"o'
SPECIFIC TASKS:
TAB A EP-PS-1 09-A Revision-,
Page 2 of 3 HOW:
- 3.
Obtain a briefing from the "OSC COORDINATOR".
3a.
Inform the "DAMAGE CONTROL TEAM COORDINATOR" you are going down to the OSC for a briefing.
NOTE:
TRY TO COORDINATE THIS BRIEFING WITH THE MAINTENANCE/I&C COORDINATOR WHO ALSO GOES TO THE OSC TO OBTAIN THIS INFORMATION.
3b.
Upon arrival at the OSC:
(1)
Identify yourself as the "TSC RADIO COMMUNICATOR".
(2)
Obtain a copy of the "OSC/TSC BRIEFING SHEET" of "INDIA/OSCAR TEAMS" dispatched.
(3)
Obtain the radio channel being used to maintain communications with the "INDIA TEAM(S)".
(4)
Request the status of each team that has been dispatched from the OSC:
(a)
Team designation (b)
Name of team leader (c)
Team members names (d)
Purpose of the team (e)
Location of the team (5)
Bring radios from the OSC to the TSC upon completion of the briefing.
tLL
SPECIFIC TASKS:
PCAF #AM HOW:
TAB A EP-PS-1 09-A Revision 6 Page 3 of 3
- 4.
Notify the "OSC COORDINATOR" when the TSC is ready to assume control.
- 5.
Monitor OSC radio communications for "INDIA TEAM(S)" status.
- 6.
Inform the "INDIA TEAM(S)" when the TSC assumes control.
NOTE:
Upon E-Plan activation, Security will deliver five radios from the armory to the OSC for INDIA Team use.
4a.
Call the "OSC COORDINATOR" using either the telephone or radio.
4b.
Inform the "OSC COORDINATOR" at what time the TSC will assume control.
6a.
Notify all teams:
(1)
The TSC is now in control.
(2)
You will be communicating with them.
6b.
Notify teams doing operations related tasks that:
(1)
You will communicate their travel routes within the plant, providing radiological conditions.
(2)
Operations will continue to give them specific directions on tasks to be performed.
(3)
They will maintain communications with the Control Room on Operations related tasks when the TSC is in control of the emergency.
IL