FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road PO Box 97 Perry, Ohio 44081 February 10, 2003 PY-CEI/NRR-2692L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the January 2003 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
--rg,,cjq
OPERATING DATA REPORT UNIT:
Perry.
DATE:
2/7/03 Docket. 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period:
January 2003 Utility
Contact:
T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)
ThiM740tt 74Y.-to-Dae 744.0 744.0 744.0 744 0 0.0 00 g30n323 0 930_3230 Cu,nulative 105,647.5 103,014.3 0.0 117.505.534 0 1260 1235
- 8.
- 9.
10 11.
Page 1 9303230 9303230 1175055340
DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 2/7/03 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 I
I No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1
Hours 2
3 SU Y
T
SUMMARY
- The unit was on tine the entire month of January, 2003.
- 1. TYPE:
F: Forced S. Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &I License Examination F - Administrative G - Operational Error (explain)
H-Other (explain) 3 METHOD:
1-Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2 I
UNIT SHUTDOWNS REPORT MONTH - January 2003