FENOC FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant 10 Center Road PO Box 97 Perry, Ohio 44081 February 10, 2003 PY-CEI/NRR-2692L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the January 2003 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

--rg,,cjq

OPERATING DATA REPORT UNIT:

Perry.

DATE:

2/7/03 Docket. 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period:

January 2003 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1.
2.
3.
4.
5.
6.

7.

Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

ThiM740tt 74Y.-to-Dae 744.0 744.0 744.0 744 0 0.0 00 g30n323 0 930_3230 Cu,nulative 105,647.5 103,014.3 0.0 117.505.534 0 1260 1235

8.
9.

10 11.

Page 1 9303230 9303230 1175055340

DOCKET NO: 50-440 NAME: Perry Nuclear Power Plant DATE: 2/7/03 CONTACT: T. Phelps TELEPHONE: (440) 280-7660 I

I No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence 1

Hours 2

3 SU Y

T

SUMMARY

The unit was on tine the entire month of January, 2003.
1. TYPE:

F: Forced S. Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &I License Examination F - Administrative G - Operational Error (explain)

H-Other (explain) 3 METHOD:

1-Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continuation 5 - Other Page 2 I

UNIT SHUTDOWNS REPORT MONTH - January 2003