Page 1 of 7 ES-401 Form ES-401-9 FACILITY: Diablo Canyon CHIEF EXAMINER: G. Johnston EXAM DATE: October 2002 REVIEWER: G. Werner

  • Indicates part of initial sample Note: On pages 1 - 5 Questions 1 - 71 are both RO/SRO, Questions 72 - 100 are RO only.

On pages 6 & 7 Questions 72 - 100 are SRO only.

Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 1*

H 3

OK S

2*

F 2

X OK E

Answer D is longer than the other distractors and the other 3 answers are dissimilar from Answer D. In addition, Answer C is too close to being correct -...DRW is highest at approx the banks 40%

withdrawn position.

3 F

2 OK S

Could not verify answer. Correct answer does not make total sense.

Need to verify with licensee.

4 H

3 OK S

5 H

3 OK S

6*

H 2

X OK U

Answers B and D are not credible distractors.

7*

H 3

OK S

8 H

3 OK S

9 F

2 OK S

10 H

2 OK S

11*

F 1

X OK U

Anyone knowing how to use steam tables could arrive at the correct answer and the question has low discriminatory value.

12 H

3 OK S

13 H

2 OK S

14 H

2 OK S

15 H

3 OK S

16 F

3 OK S

17 H

2 OK S

18 H

2 OK S

Page 2 of 7 Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 19*

H 2

OK S

20*

F 3

OK S

21 F

1 OK U

Low discrimiination value. Although some analysis is needed - it is of fundamental level below site specific knowledge.

22 H

3 OK S

23 F

2 OK S

24*

F 2

X OK E

Answer B is not plausible and not consistent with other answers -

high. Would be better to say high pressure......

25 H

2 OK S

26 H

3 OK S

27 H

2 OK S

28 H

3 OK S

29*

H 2

OK S

30 31*

F X

OK E

Discussing designed in the stem, but Answers C and D are not related to design, would be related more to reason. May need to modify question to include purpose of safety valves and discuss reason in the answer.

32*

H 3

X No E

Not clear how this question ties to RO/SRO duties. The engineering and maint console is located in the cable spread room. Isnt the K/A asking about auto operation of SG level control. This question deals with display of an alarm panel and not impact on auto operation or level.

33 H

2 OK S

34 H

3 OK S

35 F

2 OK S

36 F

2 OK S

37 H

3 OK S

38 F

2 OK S

Page 3 of 7 Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 39 H

2 OK S

40 F

2 OK S

41*

H 3

X OK U

Answer C and D are not a plausible distractor because the stem does not specify that FR-20 (avg flowrate) is inonoperable.

42*

H 4

OK E

Is the event classification something an RO or SRO should know from memory?

43 F

2 OK S

44*

F 2

OK S

45 F

2 OK S

AP-15 Caution statement has an action statement in a caution, this may be a violation of the DCPP writers guide.

46 F

2 OK E

Question should read Which of the following automantic action would occur?

47*

F 2

OK S

48*

H 2

OK S

49 H

2 OK S

50*

F 2

OK S

51*

F 2

OK S

52 53*

F 2

OK E

The distractors dont appear to be plausible. What other fuel building rad monitors are there? If you werent sure of the answer, you could simply pick RM-59, New Fuel Storage Area monitor, because this is the only rad monitor associated with the fuel building.

54 H

4 OK S

55*

F 2

X OK U

None of the distractors are credible distrators. Discussed with Don Bearden - he agreed.

56 F

2 OK S

57*

H 3

OK S

Recommend modifying Answer C to include heat up RCS above low Tavg Setpoint to make C and D consistent in length.

58*

H 2

X OK U

Answers B, C, and D are NOT credible distractors!!!!!! Discussed with Don Bearden - will modify distractors.

Page 4 of 7 Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 59*

H 3

OK S

60 F

2 OK S

61 F

2 OK S

62 F

2 OK S

63 F

2 OK S

64 F

2 OK S

65 F

3 OK S

66 H

3 OK S

67 H

3 OK S

68 H

3 OK S

69*

F 3

OK S

70 F

2 OK S

71*

F X

X OK Does this question have a direct/important relationship to perform the job? What is the point of the question?

72 F

2 OK S

73 H

2 OK S

74 F

2 OK S

75*

H 3

OK X

E Clearly an SRO only question per 55.43(b)(5) - selection of appropriate emergency operating procedure. Reword the question to get rid of terminus. Change the question for the candidates to determine - loss of heat sink and not selection of procedure.

76 H

2 OK S

77 H

2 OK S

78 H

2 OK S

79 H

3 OK S

Page 5 of 7 Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 80 H

3 OK S

81 H

3 OK S

82 F

2 OK S

83 H

2 OK S

84*

H 3

OK S/E For Answer B, change is to was to make tenses agree.

85*

H 3

OK S

86 F

2 OK S

87 F

3 OK S

88 H

3 OK S

89 H

2 OK S

90 H

3 OK S

91 F

2 OK S

92 F

2 OK S

93 F

2 OK S

94 H

3 OK S

95*

F 2

OK E

Edit Answer D - replace Senior Control Operator with Unit Shift Foreman 96 H

3 OK S

97 F

3 OK S

98*

H 2

OK S

99 F

3 OK S

100 F

2 OK S

Page 6 of 7 Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 72 H

2 OK

S 73 H

2 OK

S 74 F

2 OK

S 75 H

2 OK

S 76 F

2 OK

S 77 H

3 OK

S 78 H

3 OK

S 79 F

2 OK

S 80 F

3 OK

S 81 F

2 OK

S 82 H

3 OK

S 83 H

3 OK

S 84 H

3 OK

S 85 H

2 OK

S 86 H

3 OK

S 87 H

2 OK

S 88 F

3 OK

S 89 H

3 X

X OK

U RECOMMEND DISTRACTOR D READ: "REACTIVITY INCREASED THROUGHOUT...."

90 F

2 OK

S 91 F

2 OK

S 92 F

2 OK

S 93 F

3 OK

S 94 F

2 OK

S

Page 7 of 7 Q#

1.

LOK (F/H) 2.

LOD (1-5)

3. Psychometric Flaws
4. Job Content Flaws
5. Other 6.

U/E/S 7.

Explanation Stem Focus Cues T/F Cred.

Dist.

Partial Job-Link Minutia

  1. /

units Back-ward Q=

K/A SRO Only 95 H

3 OK

S 96 H

3 OK

S 97 F

3 OK

S 98 H

3 X

OK

E WORD DISTRACTOR B LIKE REFERENCE MATERIAL PROVIDED 99 F

3 OK

S 100 F

2 OK

S NUREG-1021