Exelon Nuclear 200 Exelon Way Kennett Square, PA 19348 www exeloncorp corn Nuclear 10CFR54 February 5, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Peach Bottom Atomic Power Station, Units 2 and 3 Facility Operating License Nos. DPR-44 and DPR-56 NRC Docket Nos. 50-277 and 50-278

Subject:

Reference:

Response for Clarification on List of Commitments

1) January 31, 2003 Letter from Michael P. Gallagher (Exelon), to NRC Document Control Desk Regarding Response to Request for Additional Information Related to License Renewal
2) Conference call between Exelon and NRC staff on February 5, 2003 regarding list of commitments

Dear Sir/Madam:

Reference letter 1 Attachment 1 transmitted a list of commitments that included future actions as identified in the Updated Final Safety Analysis Report (UFSAR) Supplement Appendix A, of the Reference letter 1. Subsequently in the Reference 2 telephone call, the NRC provided comments on the commitment list and requested two additional commitments be incorporated that were included in the UFSAR Supplement. to this letter revises the list of commitments and includes these two additional commitments as line items 26 and 27. These commitments relate to RPV studs and to environmental fatigue.

If you have any questions or require additional information, please do not hesitate to call.

I declare under penalty of perjury that the foregoing is true and correct.

Respectfully, Executed on 0__06__0_

Michael P. Gallaghe Director, Licensing & Regulatory Affairs Mid-Atlantic Regional Operating Group

Enclosures:

Attachment 1 cc:

H. J. Miller, Administrator, Region I, USNRC A. C. McMurtray, USNRC Senior Resident Inspector, PBAPS Exelnm.

Peach Bottom Atomic Power Station Units 2 & 3 Revised License Renewal Commitment Listing

Peach Bottom Atomic Power Station Units 2 & 3 Revised License Renewal Commitment Listing Page 1 of 3 Item Commitment UFSAR Supplement Frequency Source Location 1

Evaluate any age related A.1.8, ISI Program Prior to period of Clarification to SER degradation found during extended 01 2.3.3.19.2-1, recirculation system ISI operation.

letter dated January inspections for applicability to 14, 2003.

the NSR portions of the recirculation system that was included in the scope of license renewal for NSR/SR.

2 Notify the NRC whether A.1.12, Reactor Prior to period of Response to RAI Integrated Surveillance Materials Surveillance extended operation 3.1-15, letter dated Program per BWRVIP-78 or Program May 6, 2002 and plant specific program will be license condition implemented 3

Perform Inspection of carbon A.1.16, Maintenance Prior to period of Response to RAI steel Component Supports Rule Structural extended operation 3.5-2, letter dated (Other than ASME Class 1, 2, Monitoring Program and every 4 years May 21, 2002 3, and ASME Class MC thereafter.

component supports) 4 Perform Inspection of SBO A.1.16, Maintenance Prior to period of Response to RAI structural components Rule Structural extended operation 2.5-1, letter dated Monitoring Program and every 4 years May 22, 2002.

thereafter.

5 Perform periodic reviews of A.1.17, Electrical On-going Response to SER calibration test results of Cables not subject to Open Item 3.6.1.2.2 electrical cables used in LPRM 1 OCFR50.49 1, letter dated and WRM Instrumentation Environmental November 26, 2002.

circuits to identify potential Qualification existence of aging degradation Requirements used in Instrumentation Circuits 6

Perform inspection of outer A.2.5, Outdoor, Buried, Prior to period of Response to RAI sluice gates in the circulating and Submerged extended operation 3.5-3, letter dated water pump structure Component Inspection May 21, 2002.

Activities 7

Perform inspection of hazard A.2.6, Door Inspection Prior to period of Response to RAI barrier doors in a sheltered Activities extended operation 3.5-2.A, letter dated environment for loss of and every 4 years May 21,2002 and material thereafter RAI 2.6-1, letter dated April 29, 2002.

8 Perform inspection of RPV top A.2.7, Reactor Prior to period of Response to SER guide Pressure Vessel and extended operation Open Item 4.5.2-1, Internals ISI Program letter dated January 14, 2003.

Peach Bottom Atomic Power Station Units 2 & 3 Revised License Renewal Commitment Listing Page 2 of 3 Item Commitment UFSAR Supplement Frequency Source Location 9

Perform ultrasonic testing to A.2.8, GL 89-13 Prior to period of UFSAR Supplement detect wall thinning at Activities extended operation Appendix A.2.8 susceptible locations in the letter dated ESW system stagnant piping in November 26, 2002 ECCS rooms 10 Perform one-time inspection of A.2.9, Fire Protection Prior to period of UFSAR Supplement a cast iron fire protection Activities extended operation Appendix A.2.9 component for selective letter dated leaching November 26, 2002 11 Perform functional testing of A.2.9, Fire Protection Prior to year 50 of UFSAR Supplement sprinkler heads Activities sprinkler service Appendix A.2.9 life letter dated November 26, 2002 12 Perform inspection of electrical A.2.9, Fire Protection Prior to period of RAI 3.5.3 response, conduits in outdoor Activities extended operation letter dated May 21, environment 2002 13 Perform inspection of A.2.1 1, Susquehanna 2003 and every 10 UFSAR Supplement Susquehanna substation Substation Wooden years thereafter Appendix A.2.11 wooden pole Pole Inspection Activity letter dated November 26, 2002 14 Perform one-time inspection of A.3.1, Torus Piping Prior to period of UFSAR Supplement wall thickness of selected torus Inspection Activities extended operation Appendix A.3.1 piping letter dated November 26, 2002 15 Perform inspection of PVC-A.3.2, FSSD Cable Prior to period of UFSAR Supplement insulated Fire Safe Shutdown Inspection Activity extended operation Appendix A.3.2 cables in drywell letter dated November 26, 2002 16 Implement inspection program A.3.3, Non-EQ Prior to period of RAI 3.6-1 response for Non-EQ accessible cables Accessible Cable extended operation letter dated April 29, and connections, including Aging Management and every 10 years 2002; and SER fuse blocks Activity thereafter Confirmatory Item 3.6.2.2.2-1, letter dated November 26, 2002.

17 Perform one-time piping A.3.4, One-Time Prior to period of RAI B.1.13-1 inspection activities for standby Piping Inspection extended operation response dated May liquid control system, auxiliary Activities 14, 2002; and RAI steam system, plant equipment 2.1.2-3 and 2.1.2-4 and floor drain system, service response dated May water system, radiation 21,2002 monitoring system 18 Perform one-time inspection of A.3.4, One-Time Prior to period of Response to SER susceptible locations for loss of Piping Inspection extended operation Open Item 3.0.3.6.2 material in fuel pool cooling Activities 1, letter dated system to verify effectiveness November 26, 2002 of fuel pool chemistry activities

L Peach Bottom Atomic Power Station Units 2 & 3 Revised License Renewal Commitment Listing Page 3 of 3 Item Commitment UFSAR Supplement Frequency Source Location 19 Perform one-time inspection of A.3.4, One-Time Prior to period of Response to SER carbon steel piping for loss of Piping Inspection extended operation Open Item 3.1.3.2.1 material in RPV Activities 1, letter dated instrumentation and Reactor November 26, 2002.

Recirculation system 20 Perform testing of inaccessible A.3.5, Inaccessible Prior to period of SER Open Item medium voltage cables Medium Voltage extended operation 3.6.1.2.1-1 response Cables not subject to dated November 20, 10CFR50.49 2002 Environmental Qualification Requirements 21 Implement the final version of A.3.6, Fuse holder Prior to period of Response to SER the fuse holder interim staff Aging Management extended operation Confirmatory Item guidance when issued by the Activity 3.6.2.2.2-1, letter NRC.

dated January 29, 2003 22 Implement fatigue A.4.2, Fatigue Prior to period of UFSAR Supplement management program Management Activities extended operation Appendix A.4.2 letter dated November 26, 2002 23 Submit RPV P-T curves for 54 A.5.1.1.2, P-T Limit Prior to period of RAI 4.2-5 response EFPY as license amendment Curves extended operation dated May 1, 2002 24 Submit RPV circumferential A.5.1.1.3, Reactor Prior to period of UFSAR Supplement weld examination relief request Vessel Circumferential extended operation Appendix A.5.1.1.3 for 60 years Weld Examination letter dated Relief November 26, 2002 and response to RAI 4.2-6, letter dated May 1, 2002 25 Implement BWRVIP-76 when A.2.7, Reactor Prior to period of License Condition approved by the NRC and Pressure Vessel and extended operation accepted by BWRVIP Internals ISI Program Committee 26 Obtain NRC review and A..5.2.1 Reactor Prior to period of UFSAR Supplement approval for an inspection Vessel Fatigue extended operation Appendix A.5.2.1 program if used, to manage the and RAI 4.3-1 effects of fatigue for RPV studs response dated May when CUF approaches 1.0 1,2002 27 Perform plant specific A.5.2.4 Effects of Prior to period of UFSAR Supplement calculation for locations Reactor Coolant extended operation Appendix A.5.2.4 identified in NUREG CR-6260 Environment on and RAI 4.3-6 for older vintage plants to Fatigue Life of response dated May manage the effects of Components and 1,2002 environmental fatigue. If Piping position is modified based on industry activities, obtain NRC approval prior to implementation