ML030430148

From kanterella
Jump to navigation Jump to search
Revised Emergency Plan Procedures
ML030430148
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/03/2003
From: Price J
Dominion Nuclear Connecticut
To:
Document Control Desk, NRC/FSME
References
B18824
Download: ML030430148 (3)


Text

Dominion Nuclear Millstone Power Connecticut, Inc.

Station Dominion Rope Ferry Road Waterford, CT 06385 FEB 3 2003 Docket Nos. 50-245 50-336 50-423 618824 RE: 10 CFR 50, Appendix E 10 CFR 50.47(bX5)

U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Power Station, Unit Nos. 1, 2 and 3 Revised Emergency Plan Procedures In accordance with 10 CFR 50, Appendix E, Dominion Nuclear Connecticut, Inc. hereby notifies the U.S. Nuclear Regulatory Commission that the Emergency Plan procedures listed below have been implemented.

MP-26-EPI-FAP02-001, "Assistant Director Technical Support (ADTS)," Major Revision 1, Minor Revision 2, transmitted via Attachment 1.

MP-26-EPI-FAP04, "Emergency Operations Facility Activation and Operation," Major Revision 1, Minor Revision 2, and the following associated forms are transmitted via :

"* MP-26-EPI-FAP04-001, "Director of Station Emergency Operations (DSEO)," Major Revision 1, Minor Revision 1;

"* MP-26-EPI-FAP04-002, "Assistant Director Emergency Operations Facility (ADEOF)," Major Revision 0, Minor Revision 1;

"* MP-26-EPI-FAP04-01 1, "Manager of Resources (MOR) or External Resources Coordinator (ERC)," Major Revision 1, Minor Revision 2;

"* MP-26-EPI-FAP04-012, "Public Information Technical Advisor (PITA),"

Major Revision 1, Minor Revision 1;

"* MP-26-EPI-FAP04-014, "Technical Information Coordinator (TIC),"

Major Revision 1, Minor Revision 1, and

" MP-26-EPI-FAP04-017, "Regulatory Liaison," Major Revision 1, Minor Revision 1.

U.S. Nuclear Regulatory Commission B18824/Page 2 MP-26-EPI-FAP05, "State Emergency Operations Center (EOC) Activation and Operation," Major Revision 1, Minor Revision 1, and the following associated forms are transmitted via Attachment 3:

"* MP-26-EPI-FAP05-001, "Chief Technical Spokesperson (CTS)," Major Revision 1, Minor Revision 1;

"* MP-26-EPI-FAP05-002, "Technical Assistant (TA)," Major Revision 1, Minor Revision 1;

"* MP-26-EPI-FAP05-003, "Nuclear News Manager (NNM)," Major Revision 1, Minor Revision 1;

"* MP-26-EPI-FAP05-004, "Rumor Control Liaison (RCL)," Major Revision 1, Minor Revision 1;

"* MP-26-EPI-FAP05-005, "Media Center Liaison (MCL)," Major Revision 1, Minor Revision 1;

"* MP-26-EPI-FAP05-006, "Technical Briefer (TB)," Major Revision 1, Minor Revision 1;

"* MP-26-EPI-FAP05-007, "Radiological Briefer (RB)," Major Revision 0, Minor Revision 1, and

"* MP-26-EPI-FAP05-008, "State Emergency Planning Liaison (SEPL),"

Major Revision 0, Minor Revision 1.

MP-26-EPI-FAP06-001, "Millstone Unit 1 Emergency Action Levels," Major Revision 1, Minor Revision 1, transmitted via Attachment 4.

MP-26-EPI-FAP06-006, "EOF Protective Action Recommendations," Major Revision 0, Minor Revision 2, transmitted via Attachment 5.

MP-26-EPI-FAP07, "Notifications and Communications," Major Revision 2, Minor Revision 2, transmitted via Attachment 6.

MP-26-EPI-FAP08, "Evacuation and Assembly," Major Revision 1, Minor Revision 1, transmitted via Attachment 7.

MP-26-EPI-FAP13, "News Releases," Major Revision 1, transmitted via Attachment 8.

MP-26-EPI-FAP14, "Recovery," Major Revision 1, Minor Revision 1, transmitted via .

MP-26-EPA-FAP01, "Management Program for Maintaining Emergency Preparedness,"

Major Revision 0, Minor Revision 2, transmitted via Attachment 10.

There are no regulatory commitments contained within this letter.

U.S. Nuclear Regulatory Commission B18824/Page 3 If you should have any questions concerning this submittal, please contact Mr. David W. Dodson at (860) 447-1791, extension 2346.

Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.

StJice President - Millstone Attachments (10) cc: H. J. Miller, Region I Administrator (2 copies)

R. J. Conte, Chief, Operational Safety Branch, Region I cc: w/o attachments D. G. Holland, NRC Project Manager, Millstone Unit No. 1 J. R. Wray, NRC Inspector, Region I, Millstone Unit No. I R. B. Ennis, NRC Senior Project Manager, Millstone Unit No. 2 V. Nerses, NRC Senior Project Manager, Millstone Unit No. 3 Millstone Senior Resident Inspector