Category:Emergency Preparedness-Emergency Plan Implementing Procedures
MONTHYEARML22152A2542022-06-0101 June 2022 Associated Independent Spent Fuel Storage Installation Revision to Emergency Plan - Report of Change ML19162A0912019-05-28028 May 2019 Management Program for Maintaining Emergency Preparedness ML18227A1492018-07-31031 July 2018 Revision 016 to MP-26-EPA-FAP0l, Management Program for Maintaining Emergency Preparedness ML18102A5282018-03-26026 March 2018 Surveillance Procedure C Sp 600.4, Rev. 006, Communications - Radiopaging and Enrs/Arcos Practice Test. ML18102A5332018-03-16016 March 2018 Revision 56 to Emergency Plan, MP-26-EPI-EPMP ML17075A1732017-03-0202 March 2017 Revision 010 to Emergency Radiological Equipment Maintenance and Inspection (Ref. 6.2), RPM 4.8.5 ML17033B6062017-01-26026 January 2017 Revision 55 to Emergency Plan MP-26-EPl-EPMP ML16343A0042016-11-17017 November 2016 Revision 54 to Emergency Plan MP-26-EPI-EPMP ML16214A2682016-07-25025 July 2016 Revision 009 to Emergency Radiological Equipment Maintenance and Inspection RPM 4.8.5., Health Physics Operations Procedure. ML16203A1342016-07-13013 July 2016 C Sp 600.4, Rev. 004, Communications - Radiopaging and Enrs/Arcos Practice Test. ML16132A0972016-05-0202 May 2016 Rev. 015 to Management Program for Maintaining Emergency Preparedness, MP-26-EPA-FAP0l ML16089A4052016-02-16016 February 2016 Revision 009 to Control Room, RPM 4.8.5-011 ML16053A1392016-02-11011 February 2016 Revision 003-00 to C Sp 600.4, Communications - Radiopaging and Enrs/Arcos Practice Test ML16020A0412015-12-16016 December 2015 Revision 51 to Emergency Plan ML0915206182009-05-28028 May 2009 ISFSI, Proposed Change to Emergency Plan ML0915400172009-05-27027 May 2009 ISFSI - Major Revision 007, Minor Revision 0, to Emergency Plan Procedure, MP-26-EPI-FAP07, Notifications and Communications ML0913402632009-04-23023 April 2009 ISFSI - Major Revision 005, Minor Revision 0 to Emergency Plan Procedure, MP-26-EPI-FAP02, Technical Support Center Activation and Operation ML0909702952009-03-26026 March 2009 ISFSI - Submittal of Major Revision 006, Minor Revision 0 to Emergency Plan Procedure MP-26-EPI-FAP07, Notifications and Communications ML0907001372009-02-25025 February 2009 ISFSI, Submittal of Revised Emergency Plan Procedure ML0832400912008-10-29029 October 2008 C OP 606, Rev 05, Communication Radiopaging Callback Monthly Operability Test. ML0832400922008-10-29029 October 2008 Revision 001 to Surveillance Procedure C Sp 600.4, Communication Radiopaging and Enrs Practice and Weekly Operability Test. ML0412504582004-04-26026 April 2004 Connecticut, Inc., Millstone Power Station Units 1, 2 and 3, Revised Emergency Plan Procedures ML0411805572004-04-15015 April 2004 Revised Emergency Plan Procedure ML0410004842004-03-30030 March 2004 Revised Emergency Plan Procedures ML0410501482004-03-30030 March 2004 Revision 000 to C Sp 600.4, Communications - Radiopaging and Enrs Practice and Weekly Operability Tests ML0410501432004-03-30030 March 2004 Transmittal of Procedure Action Request for Rev 4 to C OP 608, Communication Radiopaging Enrs Daily Weekly Operability Test. ML0406206932004-02-18018 February 2004 Revised Emergency Plan Implementing Procedures ML0405404492004-02-12012 February 2004 Revised Emergency Plan Procedures ML0403006402004-01-22022 January 2004 Revision 001 to MP-26-EPA-FAP01, Management Program for Maintaining Emergency Preparedness. ML0402803092004-01-20020 January 2004 Major Revision 0, Minor Revision 3 to MP-26-EPI-FAP01-005, Radiological Monitoring Team (Rmt) #1, and Major Revision 1, Minor Revision 5 to MP-26-EPI-RAP04-011, Manager of Resources (Mor). ML0336406252003-12-18018 December 2003 Revised Emergency Plan Procedures ML0335105722003-12-0505 December 2003 Revision 005 to RPM 4.8.5-013A, Revision 003 to RPM 4.8.5-17, Revision 006 to RPM 4.8.5-021, and Revision 003 to RPM 4.8.5-026 ML0333606702003-11-21021 November 2003 Revised Emergency Plan Procedure ML0331004052003-10-28028 October 2003 Revised Emergency Plan Procedures ML0329400202003-10-0303 October 2003 Revised Emergency Plan Procedures ML0326610912003-09-11011 September 2003 Revised Emergency Plan Procedure MP-26-EPI-FAP10-005, Unit 1 Dose Calculation for Fuel Handling Accident, Major Revision 0, Minor Revision 1 ML0322501722003-08-0101 August 2003 Revised Emergency Plan Procedures ML0908200512003-07-10010 July 2003 Transmittal of Revised Emergency Plan Procedures MP-26-EPI-FAP01-001, Rev. 1 & Minor Rev. 7 ML0319600542003-06-30030 June 2003 Revised Emergency Plan Procedures ML0317108412003-06-10010 June 2003 Revised Emergency Plan Implementing Procedures MP-26-EPI-FAP07, Major Revision 2, Minor Revision 5 and MP-26-EPI-FA07-001, Major Revision 1 ML0316201762003-06-0202 June 2003 Revised EPIP C OP 608, Rev 004-03, Communications - Radiopaging and Enrs Practice & Weekly Operability Tests. ML0314107582003-05-13013 May 2003 Revised Emergency Plan Procedures ML0314007222003-05-13013 May 2003 Transmittal of Emergency Plan Implementing Procedure, Communications - Radiopaging Callback Monthly Operability Test. ML0312000872003-04-19019 April 2003 Revised Emergency Plan Procedures ML0310504742003-03-31031 March 2003 Transmittal of Revision 004 to Operating Procedure C OP 608, Communication Radiopaging Enrs Daily Weekly Operability Test. ML0310703592003-03-28028 March 2003 Revision 4 to MP-26-EPA-FAP01, Management Program for Maintaining Emergency Preparedness. ML0306510182003-02-20020 February 2003 Revised Emergency Plan Procedures ML0304404572003-02-0303 February 2003 Revised Emergency Plan Procedures, Attachments 1 - 6 ML0304303032003-02-0303 February 2003 Revised Emergency Plan Procedures, Attachments 7 - 10 ML0304301482003-02-0303 February 2003 Revised Emergency Plan Procedures 2022-06-01
[Table view] Category:Letter
MONTHYEARIR 05000336/20240032024-11-0707 November 2024 Integrated Inspection Report 05000336/2024003 and 05000423/2024003 and Apparent Violation and Independent Spent Fuel Storage Installation Inspection Report 07200008/2024001 ML24289A0152024-10-21021 October 2024 Review of the Fall 2023 Steam Generator Tube Inspection Report 05000423/LER-2024-001, Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary2024-10-14014 October 2024 Loss of Safety Function and Condition Prohibited by Technical Specifications for Loss of Secondary Containment Boundary IR 05000336/20244022024-10-0808 October 2024 Security Baseline Inspection Report 05000336/2024402 and 05000423/2024402 (Cover Letter Only) ML24281A1102024-10-0707 October 2024 Requalification Program Inspection 05000423/LER-2023-006-02, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-09-26026 September 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24260A2192024-09-16016 September 2024 Decommissioning Trust Fund Disbursement - Revision to Previous Thirty-Day Written Notification ML24260A1952024-09-16016 September 2024 Response to Request for Additional Information Regarding Proposed Amendment to Support Implementation of Framatome Gaia Fuel ML24248A2272024-09-0404 September 2024 Operator Licensing Examination Approval ML24240A1532024-09-0303 September 2024 Summary of Regulatory Audit Supporting the Review of License Amendment Request for Implementation of Framatome Gaia Fuel IR 05000336/20240052024-08-29029 August 2024 Updated Inspection Plan for Millstone Power Station, Units 2 and 3 (Reports 05000336/2024005 and 05000423/2024005 IR 05000336/20240022024-08-13013 August 2024 Integrated Inspection Report 05000336/2024002 and 05000423/2024002 ML24221A2872024-08-0808 August 2024 Independent Spent Fuel Storage Installation (ISFSI) - Submittal of Cask Registration for Spent Fuel Storage IR 05000336/20244412024-08-0606 August 2024 Supplemental Inspection Report 05000336/2024441 and 05000423/2024441 and Follow-Up Assessment Letter (Cover Letter Only) ML24212A0742024-08-0505 August 2024 Request for Withholding Information from Public Disclosure - Millstone Power Station, Unit No. 3, Proposed Alternative Request IR-4-13 to Support Steam Generator Channel Head Drain Modification ML24211A1712024-07-25025 July 2024 Associated Independent Spent Fuels Storage Installation, Revision to Emergency Plan - Report of Change IR 05000336/20244032024-07-22022 July 2024 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000336/2024403 and 05000423/2024403 IR 05000336/20245012024-07-0101 July 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000336/2024501 and 05000423/2024501 ML24180A0932024-06-28028 June 2024 Readiness for Additional Inspection: EA-23-144 IR 05000336/20240102024-06-26026 June 2024 Biennial Problem Identification and Resolution Inspection Report 05000336/2024010 and 05000423/2024010 ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 IR 05000336/20244402024-06-24024 June 2024 Final Significance Determination for Security-Related Greater than Green Finding(S) with Assessment Follow-up; IR 05000336/2024440 and 05000423/2024440 and Notice of Violation(S), NRC Investigation Rpt 1-2024-001 (Cvr Ltr Only) ML24176A1782024-06-20020 June 2024 Update to the Final Safety Analysis Report ML24176A2622024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24280A0012024-06-20020 June 2024 Update to the Final Safety Analysis Report (Redacted Version) ML24281A2072024-06-20020 June 2024 Update to the Final Safety Analysis Report, Revision 37 (Redacted Version) 05000336/LER-2024-001, Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications2024-06-10010 June 2024 Control Room Air Conditioning Unit Inoperable Due to Refrigerant Overcharge Resulting in a Condition Prohibited by Technical Specifications ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24165A1292024-06-0505 June 2024 ISFSI, 10 CFR 50.59 Annual Change Report for 2023 Annual Regulatory Commitment Change Report for 2023 ML24128A2772024-06-0404 June 2024 Issuance of Amendment No. 290 to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and Core Operating Limits Report for Use of Framatome Gaia Fuel (EPID L-2023-LLA-0074) (Non-Proprietary) ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities ML24110A0562024-05-21021 May 2024 Exemption from the Requirements of 10 CFR Part 50, Section 50.46, and Appendix K Regarding Use of M5 Cladding Material (EPID L-2023-LLE-0013) (Letter) ML24109A0032024-05-21021 May 2024 Issuance of Amendment No. 289 to Revise Technical Specifications to Use Framatome Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limit (EPID L-2023-LLA-0065) (Non-Proprietary) ML24142A0952024-05-20020 May 2024 End of Cycle 22 Steam Generator Tube Inspection Report 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-20020 May 2024 Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications ML24141A2432024-05-20020 May 2024 Response to Request for Additional Information Regarding Alloy 600 Aging Management Program Submittal Related to License Renewal Commitment No. 15 IR 05000336/20240012024-05-14014 May 2024 Integrated Inspection Report 05000336/2024001 and 05000423/2024001 and Apparent Violation ML24123A2042024-05-0202 May 2024 Pre-Decisional Replay to EA-23-144 05000423/LER-2023-006, Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications2024-05-0202 May 2024 Pressurizer Power Operated Relief Valve Failed to Stroke Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications IR 05000336/20244012024-04-30030 April 2024 Security Baseline Inspection Report 05000336/2024401 and 05000423/2024401 (Cover Letter Only) ML24123A1222024-04-30030 April 2024 Inservice Inspection Program - Owners Activity Report, Refueling Outage 22 ML24116A0452024-04-25025 April 2024 Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only) ML24116A1742024-04-24024 April 2024 Annual Radiological Environmental Operating Report ML24114A2662024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Effluent Release Report ML24103A0202024-04-22022 April 2024 Summary of Regulatory Audit in Support of License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits ML24106A2032024-04-15015 April 2024 2023 Annual Environmental Operating Report ML24088A3302024-04-0404 April 2024 Regulatory Audit Plan in Support of License Amendment Request to Implement Framatome Gaia Fuel ML24093A2162024-04-0101 April 2024 Response to Request for Additional Information Regarding License Amendment Request to Use Framatome Small Break and Realistic Large Break Loss of Coolant Accident Evaluation Methodologies for Establishing Core Operating Limits 2024-09-04
[Table view] |
Text
Dominion Nuclear Millstone Power Connecticut, Inc.
Station Dominion Rope Ferry Road Waterford, CT 06385 FEB 3 2003 Docket Nos. 50-245 50-336 50-423 618824 RE: 10 CFR 50, Appendix E 10 CFR 50.47(bX5)
U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Millstone Power Station, Unit Nos. 1, 2 and 3 Revised Emergency Plan Procedures In accordance with 10 CFR 50, Appendix E, Dominion Nuclear Connecticut, Inc. hereby notifies the U.S. Nuclear Regulatory Commission that the Emergency Plan procedures listed below have been implemented.
MP-26-EPI-FAP02-001, "Assistant Director Technical Support (ADTS)," Major Revision 1, Minor Revision 2, transmitted via Attachment 1.
MP-26-EPI-FAP04, "Emergency Operations Facility Activation and Operation," Major Revision 1, Minor Revision 2, and the following associated forms are transmitted via :
"* MP-26-EPI-FAP04-001, "Director of Station Emergency Operations (DSEO)," Major Revision 1, Minor Revision 1;
"* MP-26-EPI-FAP04-002, "Assistant Director Emergency Operations Facility (ADEOF)," Major Revision 0, Minor Revision 1;
"* MP-26-EPI-FAP04-01 1, "Manager of Resources (MOR) or External Resources Coordinator (ERC)," Major Revision 1, Minor Revision 2;
"* MP-26-EPI-FAP04-012, "Public Information Technical Advisor (PITA),"
Major Revision 1, Minor Revision 1;
"* MP-26-EPI-FAP04-014, "Technical Information Coordinator (TIC),"
Major Revision 1, Minor Revision 1, and
" MP-26-EPI-FAP04-017, "Regulatory Liaison," Major Revision 1, Minor Revision 1.
U.S. Nuclear Regulatory Commission B18824/Page 2 MP-26-EPI-FAP05, "State Emergency Operations Center (EOC) Activation and Operation," Major Revision 1, Minor Revision 1, and the following associated forms are transmitted via Attachment 3:
"* MP-26-EPI-FAP05-001, "Chief Technical Spokesperson (CTS)," Major Revision 1, Minor Revision 1;
"* MP-26-EPI-FAP05-002, "Technical Assistant (TA)," Major Revision 1, Minor Revision 1;
"* MP-26-EPI-FAP05-003, "Nuclear News Manager (NNM)," Major Revision 1, Minor Revision 1;
"* MP-26-EPI-FAP05-004, "Rumor Control Liaison (RCL)," Major Revision 1, Minor Revision 1;
"* MP-26-EPI-FAP05-005, "Media Center Liaison (MCL)," Major Revision 1, Minor Revision 1;
"* MP-26-EPI-FAP05-006, "Technical Briefer (TB)," Major Revision 1, Minor Revision 1;
"* MP-26-EPI-FAP05-007, "Radiological Briefer (RB)," Major Revision 0, Minor Revision 1, and
"* MP-26-EPI-FAP05-008, "State Emergency Planning Liaison (SEPL),"
Major Revision 0, Minor Revision 1.
MP-26-EPI-FAP06-001, "Millstone Unit 1 Emergency Action Levels," Major Revision 1, Minor Revision 1, transmitted via Attachment 4.
MP-26-EPI-FAP06-006, "EOF Protective Action Recommendations," Major Revision 0, Minor Revision 2, transmitted via Attachment 5.
MP-26-EPI-FAP07, "Notifications and Communications," Major Revision 2, Minor Revision 2, transmitted via Attachment 6.
MP-26-EPI-FAP08, "Evacuation and Assembly," Major Revision 1, Minor Revision 1, transmitted via Attachment 7.
MP-26-EPI-FAP13, "News Releases," Major Revision 1, transmitted via Attachment 8.
MP-26-EPI-FAP14, "Recovery," Major Revision 1, Minor Revision 1, transmitted via .
MP-26-EPA-FAP01, "Management Program for Maintaining Emergency Preparedness,"
Major Revision 0, Minor Revision 2, transmitted via Attachment 10.
There are no regulatory commitments contained within this letter.
U.S. Nuclear Regulatory Commission B18824/Page 3 If you should have any questions concerning this submittal, please contact Mr. David W. Dodson at (860) 447-1791, extension 2346.
Very truly yours, DOMINION NUCLEAR CONNECTICUT, INC.
StJice President - Millstone Attachments (10) cc: H. J. Miller, Region I Administrator (2 copies)
R. J. Conte, Chief, Operational Safety Branch, Region I cc: w/o attachments D. G. Holland, NRC Project Manager, Millstone Unit No. 1 J. R. Wray, NRC Inspector, Region I, Millstone Unit No. I R. B. Ennis, NRC Senior Project Manager, Millstone Unit No. 2 V. Nerses, NRC Senior Project Manager, Millstone Unit No. 3 Millstone Senior Resident Inspector