ML030420582

From kanterella
Jump to navigation Jump to search
10 CFR Part 26, Fitness for Duty Programs
ML030420582
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/03/2003
From: Greenlee S
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:3071-01
Download: ML030420582 (4)


Text

Indiana Michigan "Power Company "500 Circle Drive Buchanan, MI 49107 1373 INDIANA MICHIGAN POWER February 3, 2003 AEP:NRC:3071-01 10 CFR 26.71(d)

Docket Nos-50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Stop O-P1-17 Washington, DC 20555-0001 Donald C. Cook Nuclear Plant Units 1 and 2 10 CFR PART 26, FITNESS FOR DUTY PROGRAMS In accordance with 10 CFR 26.71(d), Donald C. Cook Nuclear Plant hereby submits Fitness for Duty Program performance data for the six-month period of July 1, 2002, to December 31, 2002. Attached are the performance data sheets that include statistics on the various categories of testing, substances for which testing is conducted, and a summary of management actions There are no new commitments in this submittal.

Should you have any questions, please contact Mr. Brian A. McIntyre, Manager of Regulatory Affairs, at (269) 697-5806.

S ncerely, S A.

eenlee Director of Nuclear Technical Services DB/rdw Attachment c:

K. D. Curry, Ft. Wayne AEP, w/o attachment J. E. Dyer, NRC Region III.

J. T. King, MPSC, w/o attachment MDEQ - DW & RPD, w/o attachment NRC Resident Inspector J. F. Stang, JR., NRC Washington, DC r4L29

U. S. Nuclear Regulatory Commission AEP:NRC:3071-01 Page 2 bc:

A. C. Bakken III, w/o attachment M J. Finissi, w/o attachment S. A. Greenlee D. W. Jenkins, w/o attachment J. A. Kobyra, w/o attachment B. A. McIntyre, w/o attachment J. E. Newmiller J. E. Pollock, w/o attachment D. J. Poupard M. K. Scarpello, w/o attachment T. K Woods, w/o attachment

Attachment to AEP:NRC: 3071-01 FITNESS FOR DUTY PROGRAM PERFORMANCE DATA PERSONNEL SUBJECT TO 10 CFR 26 Indiana Michigan Power Co.

Company Cook Nuclear Plant, Bridgman, Michigan Location K. E. Burkett Contact Name Cutoffs: Screen/Confirmation (ng/ml)

Marijuana 50/15 Amphetamine Cocaine 300/150 Phencyclidine Opiates 300/300 Alcohol (%BAC) 12/31/02 6 Month Ending (269) 466-3335 Phone s Appendix Ato 10CFR26 1000/500 N/A N/A 25/25 N/A N/A 0.04%

N/A N/A r

Page 1 Testing Results Licensee Long-Term Short-Term Employees Contractor Contractor Personnel Personnel Average Number with 1310 173 349 Unescorted Access Categories#

Tested Positive Tested Positive Tested Positive Pre-Access 15 0

39 1

205 4

For-Cause 6

0 0

0 0

0 Post Accident For-Cause 4

1 1

0 2

1 Observed Behavior Random 306 0

22 0

60 0

Follow-Up 22 0

4 0

20 0

Other 23 0

4 0

0 0

Total 376 1

70 1

287 5

Attachment to AEP:NRC:3071-01 BREAKDOWN OF CONFIRMED POSITIVE TESTS FOR SPECIFIC SUBSTANCES Marijuana Cocaine Opiates Amphetamines Phencyclidene Alcohol Refusal Marijuana Adulterated 50 100 To Test Suspect Specimen

_n__l ng/ml Specimen Licensee 0

0 0

0 0

0 1

0 0

0 Employee Long-Term 1

0 0

0 0

0 0

0 0

0 Contractors Short-Term 1

2 0

0 0

0 2

0 0

0 Contractors Total 2

2 0

0 0

0 3

0 0

0 Total Confirmed Positive Tests For All Specific Substances, Refusals to Test, and Adulterated Specimens:

7 MANAGEMENT ACTIONS:

A meeting was held with laboratory, collection site, Medical Review Officer(s), Employee Assistance Program staff, and psychological assessment personnel to assure consistent and effective implementation of the Fitness for Duty Program.

APPEALS:

No appeals were received during this reporting period.

EVENTS:

There were no events identified as 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> reportable in accordance with 10 CFR 26.73 during this reporting period.

TEMPORARY SUSPENSIONS:

No temporary suspensions or administrative actions were taken against individuals based on on site presumptive positive drug results.

Page 2