ML030380305

From kanterella
Jump to navigation Jump to search
DAEC Rescheduling of the Problem Identification and Resolution (Pi&R) Inspection
ML030380305
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 02/07/2003
From: Burgess B
NRC/RGN-III/DRP/RPB2
To: Peifer M
Nuclear Management Co
References
Download: ML030380305 (4)


Text

February 7, 2003 Mr. Mark Peifer Site Vice-President Duane Arnold Energy Center Nuclear Management Company, LLC 3277 DAEC Road Palo, IA 52324

SUBJECT:

DUANE ARNOLD ENERGY CENTER RESCHEDULING OF THE PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION

Dear Mr. Peifer:

This letter confirms the cancellation of the Problem Identification and Resolution (PI&R) inspection that was previously scheduled for February 3 through 24, 2003. The following revised inspection schedule has been coordinated with Mr. John Karrick of your staff:

Information gathering site visit:

May 5 First week on-site:

May 19 Second week on-site:

June 2 If you have any question regarding the above changes to the PI&R inspection schedule, please contact me at (630) 829-9629.

In accordance with 10 CFR 2.790 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Bruce L. Burgess, Chief Branch 2 Division of Reactor Projects Docket No. 50-331 License No. DPR-49 See Attached Distribution

DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML030380305.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII RIII RIII NAME GWright/trn BBurgess DATE 02/ /03 02/ /03 OFFICIAL RECORD COPY

M. Peifer cc w/encl:

E. Protsch, Executive Vice President -

Energy Delivery, Alliant; President, IES Utilities, Inc.

Robert G. Anderson, Plant Manager State Liaison Officer Chairperson, Iowa Utilities Board The Honorable Charles W. Larson, Jr.

Iowa State Representative

M. Peifer ADAMS Distribution:

WDR DFT DSH RidsNrrDipmIipb GEG HBC GAW1 C. Ariano (hard copy)

DRPIII DRSIII PLB1 JRK1