Entergy Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Mike Bellamy Site Vice President January 28, 2003 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555
SUBJECT:
REFERENCES LETTER NUMBER:
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No. 50-293 License No. DPR-35 Request for Technical Specification Change Concerning Change of Trip Level Settings.
- 1. Entergy Letter No. 2.02.106, Supplementary Information in.Support of Request for Technical Specification Change Concerning Change of Trip Level Settings, Calibration Frequencies, and Editorial Changes, Revision 1, dated November 22,2002.
- 2. Entergy Letter No. 2.02.084, Request for Technical Specification Change Concerning Change of Trip Level Settings, Calibration Frequencies, and Editorial Changes, Revision 1, dated October 10, 2002.
- 3. Entergy Letter No. 2.01.086, Request for Technical Specification Change Concerning Change of Trip Level Settings, Calibration Frequencies, and Editorial Changes, dated December 12, 2001.
2.03.010
Dear Sir or Madam:
Entergy submitted supplementary Information by Reference 1 in support of changes to Pilgrim's Technical Specifications submitted by Reference 3 and revised by Reference 2.
The supplementary information clarified the Attachments included in Reference 2 and did not impact the no significant hazards consideration determination (10 CFR 50.92(c)) included in Reference 2.
If you have any questions or require additional information, please contact Mr. Bryan Ford, Licensing Manager, at (508) 830-8403.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on the 28th day of January 2003.
Sincerely, Robert M. Bellamy 203010 4 ooI
Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station cc: Mr. Travis Tate, Project Manager Project Directorate 1-3 Office of Nuclear Reactor Regulation Mail Stop: 0-8B-1 U. S. Nuclear Regulatory Commission 1 White Flint North 11555 Rockville Pike Rockville, MD 20555-0001 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Senior. Resident Inspector Pilgrim Nuclear Power Station Letter Number: 2.03.010 Page 2 Mr. Robert Walker Radiation Control Program Commonwealth of Massachusetts Exec Offices of Health & Human Services 174 Portland Street Boston, MA 02114 Mr. Steve McGrail, Director Mass. Emergency Management Agency 400 Worcester Road P.O. Box 1496 Framingham, MA 01701-0313 A
203010