ML030370008

From kanterella
Jump to navigation Jump to search
Response to NRC Order Regarding Compensatory Measures for Access Authorization
ML030370008
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/24/2003
From: Bakken A
Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP:NRC:2073-05
Download: ML030370008 (5)


Text

Indiana Michigan Power Company 500 Circle Drive Buchanan, MI 49107 1395 Safeguards Information Withhold From Public Disclosure INDIANA MICHIGAN POWER January 24, 2003 AEP:NRC:2073-05 10 CFR 2.202 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop O-P 1-17 Washington, DC 20555-0001

SUBJECT:

Donald C. Cook Nuclear Plant Unit 1 and Unit 2 Docket Nos. 50-315 and 50-316 Response to Nuclear Regulatory Commission Order Regarding Compensatory Measures for Access Authorization

Dear Sir or Madam:

This letter is being submitted in response to the Nuclear Regulatory Commission's (NRC's) January 7, 2003, Order regarding compensatory measures for access authorization. Indiana Michigan Power Company (I&M),

the licensee for Donald C. Cook Nuclear Plant (CNP) Units 1 and 2, Facility Operating Licenses DPR-58 and DPR-74, has reviewed the subject Order.

I&M's response is provided in Attachment 1 to this letter.

provides a summary of the regulatory commitments made in this submittal. In accordance with the provisions of 10 CFR 73.21, Attachment 1 is considered Safeguards Information.

Section IV of the NRC's January 7, 2003, Order states that, in accordance with 10 CFR 2.202, a Licensee must submit an answer to the Order and may request an extension of time in which to submit an answer or to request a hearing on the Order within 20 days of the date of the Order. In addition, the Order states that where good cause is shown, consideration will be given to extending the time to request a hearing.

Because I&M is unable to ascertain what actions would be appropriate in the context of meeting the NRC's intent for these measures, we will be unable to NOTICE: WHEN SEPARATED FROM ATTACHMENT 1, THIS DOCUMENT IS DECONTROLLED Safeguards Information Withhold From Public Disclosure

Safeguards Information Withhold From Public Disclosure U. S. Nuclear Regulatory Commission AEP:NRC:2073-05 Page 2 determine whether it is necessary to request a hearing until the NRC notifies I&M that the actions and proposed schedule described in Attachment 1 satisfy the intent of the applicable requirements of the Order.

Accordingly, I&M requests an extension of time to file a request for a hearing until 20 days after I&M is informed of the NRC's determination regarding our response to the Order.

Should you have any questions, please contact Mr. Brian A. McIntyre, Manager of Regulatory Affairs, at (269) 697-5806.

Sincerely, A. C. Bakken, III Senior Vice President, Nuclear Operations BWO/jen

Enclosure:

Notarized oath and affirmation Attachments:

1. Response to NRC Order
2. Summary of Regulatory Commitments c:

K. D. Curry - AEP Ft. Wayne, w/o Attachment I J. E. Dyer - NRC Region III J. T. King - MPSC, w/o Attachment 1 MDEQ - DW & RPD, w/o Attachment 1 NRC Resident Inspector, w/o Attachment 1 J. F. Stang, Jr. - NRC Washington DC, w/o Attachment 1 NOTICE: WHEN SEPARATED FROM ATTACHMENT 1, THIS DOCUMENT IS DECONTROLLED Safeguards Information Withhold From Public Disclosure

Safeguards Information Withhold From Public Disclosure U. S. Nuclear Regulatory Commission Page 3 AEP:NRC :2073 -05 bc:

A. C. Bakken III, w/o Attachment 1 M. J. Finissi, w/o Attachment 1 S. A. Greenlee, w/o Attachment 1 D. W. Jenkins, w/o Attachment 1 B. A. McIntyre, w/o Attachment 1 J. E. Newmiller, w/o Attachment 1 J. E. Pollock, w/o Attachment 1 D. J. Poupard, w/o Attachment 1 M. K. Scarpello, w/o Attachment 1 T. K. Woods, w/o Attachment 1 NOTICE: WHEN SEPARATED FROM ATTACHMENT 1, THIS DOCUMENT IS DECONTROLLED Safeguards Information Withhold From Public Disclosure

Safeguards Information Withhold From Public Disclosure to AEP:NRC:2073-05 AFFIDAVIT I, A. Christopher Bakken, III, being duly sworn, state that I am Senior Vice President, Nuclear Operations of American Electric Power Service Corporation and Vice President of Indiana Michigan Power Company (I&M), that I am authorized to sign and file this request with the Nuclear Regulatory Commission on behalf of I&M, and that the statements made and the matters set forth herein pertaining to I&M are true and correct to the best of my knowledge, information, and belief.

American Electric Power Service A. C. Bakken, III Senior Vice President, Nuclear Operations SWORN TO AND SUBSCRIBED BEFORE ME

!003 JULIE E. NEWMILLER Notary Public, Berrien County, MI My Commission Expires Aug 22, 2004 Public Commission Expires e-e NOTICE: WHEN SEPARATED FROM ATTACHMENT 1, THIS DOCUMENT IS DECONTROLLED Safeguards Information Withhold From Public Disclosure

Safeguards Information Withhold From Public Disclosure to AEP:NRC:2073-05 COMMITMENTS The following table identifies those actions committed to by Indiana Michigan Power Company (I&M) in this document. Any other actions discussed in this submittal represent intended or planned actions by I&M. They are described to the Nuclear Regulatory Commission (NRC) for the NRC's information and are not regulatory commitments.

Commitment Date I&M will comply with the actions described in Item B.1.1 of this response.

April 7, 2003 I&M will comply with the actions described in Item B. 1.2 of this response.

April 7, 2003 I&M will comply with the actions described in Item B.1.3.a of this response.

May 1, 2003 I&M will comply with the actions described in Item B.1.3.b of this May 1, 2003 response.

I&M will comply with the actions described in Item B.l.3.c of this July 7, 2003 response.

I&M will comply with the actions described in Item B.1.3.d of this May 1, 2003 response.

I&M will comply with the actions described in Item B.1.4 of this response.

May 1, 2003 I&M will comply with the actions described in Item B. 1.5 of this response.

May 1, 2003 I&M will comply with the actions described in Item B. 1.6 of this response.

May 1, 2003 I&M will comply with the actions described in Item B.1.7 of this response.

May 1, 2003 I&M will comply with the actions described in Item C. 1.1 of this response.

May 1, 2003 I&M will comply with the actions described in Item C.1.2 of this response.

May 1, 2003 I&M will comply with the actions described in Item C.1.3 of this response.

June 1, 2003 I&M will comply with the actions described in Item C. 1.4 of this response.

July 7, 2003 I&M will comply with the actions described in Item C. 1.5 of this response.

July 7, 2003 I&M will comply with the actions described in Item C.1.6 of this response.

January 7, 2004 I&M will comply with the actions described in Item C.1.7 of this response.

July 7, 2003 I&M will comply with the actions described in Item C.1.8 of this response.

January 7, 2004 I&M will comply with the actions described in Item C. 1.9 of this response.

July 7, 2003 I&M will notify the NRC when full compliance with the Order is achieved.

January 28, 2004 NOTICE: WHEN SEPARATED FROM ATTACHMENT 1, THIS DOCUMENT IS DECONTROLLED Safeguards Information Withhold From Public Disclosure