Draft List of Commitments (Peach Bottom Atomic Power Station, Units 2 & 3)
ML030360414
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 02/06/2003
From:
Division of Regulatory Improvement Programs
To:
Solorio, D L, NRR/DRIP/RLEP, 415-1973
References
Download: ML030360414 (6)


Text

% - A PEACH BOTTOM ATOMIC POWER STATION UNITS 2 & 3 License Renewal Commitment Listing Item Commitment UFSAR Supplement Frequency Source I__Location 1 Evaluate any age related A.1.8, ISI Program Prior to period of extended Clarification to SER 01 degradation found during operation. 2.3.3.19.2-1, letter dated recirculation system ISI January 14, 2003.

inspections for applicability to the NSR portions of the recirculation system that was included in the scope of license renewal for NSR/SR.

2 Notify the NRC whether A.1.12, Reactor Materials Prior to period of extended Response to RAI 3.1-15, Integrated Surveillance Surveillance Program operation letter dated May 6, 2002 Program per BWRVIP-78 or and license condition plant specific program will be implemented 3 Perform Inspection of carbon A.1.16, Maintenance Prior to period of extended Response to RAI 3.5-2.

steel Component Supports Rule Structural operation and every 4 letter dated May 21, 2002 (Other than ASME Class 1,2, Monitoring Program years thereafter.

3, and ASME Class MC component supports) 4 Perform Inspection of SBO A.I.16, Maintenance Prior to period of extended Response to RAI 2.5-1.

structural components Rule Structural operation and every 4 letter dated May 22, 2002.

Monitoring Program years thereafter.

Item Commitment UFSAR Supplement Frequency Source 0 0I Location 0

5 Perform periodic reviews of A.1.17, Electrical Cables On-going Response to SER Open calibration test results of not subject to Item 3.6.1.2.2-1, letter electrical cables used In 10CFR50.49 dated November 26,2002.

  • 1 LPRM and WRM Environmental C S

Instrumentation circuits to Qualification 0 identify potential existence of Requirements used in Ill aging degradation Instrumentation Circuits C 6 Perform inspection of outer A.2.5, Outdoor, Buried, Prior to period of extended Response to RAI 3.5-3, sluice gates in the circulating and Submerged operation letter dated May,21, 2002. S water pump structure Component Inspection C

Activities 7 Perform inspection of hazard A.2.6, Door Inspection Prior to period of extended Response to RAI 3.5-2.A, barrier doors in a sheltered Activities operation and every 4 letter dated May 21, 2002 environment for loss of years thereafter and RAI 2.6-1. letter dated material April 29,2002.

8 Perform inspection of RPV A.2.7, Reactor Pressure Prior to period of extended Response to SER Open top guide Vessel and Internals ISI operation Item 4.5.2-1, letter dated

"_Program January 14.,2003.

9 Perform ultrasonic testing to A.2.8, GL 89-13 Activities Prior to period of extended UFSAR Supplement detect wall thinning at operation Appendix A.2.8 letter dated susceptible locations In the November 26, 2002 ESW system stagnant piping in ECCS rooms 10 Perform one-time inspection A.2.9, Fire Protection Prior to period of extended UFSAR Supplement of a cast Iron fire protection Activities operation Appendix A.2.9 letter dated component for selective November 26,2002 leaching .

11 Perform functional testing of A.2.9, Fire Protection Prior to year 50 of sprinkler UFSAR Supplement sprinkler heads Activities service life Appendix A.2.9 letter dated November 26, 2002 it U

I,,

0U 0

N 0

Item Commitment UFSAR Supplement Frequency Source 0J Location 0 12 Perform Inspection of A.2.9, Fire Protection Prior to period of extended RAI 3.5.3 response, letter electrical conduits in outdoor Activities operation dated May 21, 2002 environment *11 13 Perform inspection of A.2.1 1, Susquehanna 2003 and every 10 years UFSAR Supplement C Susquehanna substation Substation Wooden Pole thereafter Appendix A.2.11 letter I, wooden pole Inspection Activity dated November 26, 2002 pa 14 Perform one-time inspection A.3.1, Torus Piping Prior to period of extended UFSAR Supplement C of wall thickness of selected Inspection Activities operation Appendix A.3.1 letter dated 6 torus piping November 26,2002 6 1

C 15 Perform Inspection of PVC- A.3.2, FSSD Cable Prior to period of extended UFSAR Supplement Insulated Fire Safe Shutdown Inspection Activity operation Appendix A.3.2 letter dated cables in drywell November 26, 2002 16 Implement inspection A.3.3, Non-EQ Prior to period of extended RAI 3.6-1 response letter program for Non-EQ Accessible Cable Aging operation and every 10 dated April 29.,2002; and accessible cables and Management Activity years thereafter SER Confirmatory Item connections, Including fuse 3.6.222-1, letter dated blocks November 26, 2002.

17 Perform one-time piping A.3.4, One-Time Piping Prior to period of extended RAI B.1.13-1 response Inspection activities for Inspection Activities operation dated May 14, 2002; and standby liquid control system, RAI 2.1.2-3 and 2.1.2-4 auxiliary steam system, plant response dated May 21, equipment and floor drain 2002 system, service water system, radiation monitoring system C

II lb,

Item Commitment UFSAR Supplement Frequency Source Location 18 Perform one-time inspection A.3.4, One-Time Piping Prior to period of extended Response to SER Open of susceptible locations for Inspection Activities operation Item 3.0.3.6.2-1, letter loss of material in fuel pool dated November 26, 2002 cooling system to verify effectiveness of fuel pool chemistry activities 19 Perform one-time inspection A.3.4, One-Time Piping Prior to period of extended Response to SER Open of carbon steel piping for loss Inspection Activities operation Item 3.1.3.2.1-1, letter of material in RPV dated November 26, 2002.

instrumentation and Reactor Recirculation system_

20 Perform testing of A.3.5, Inaccessible Prior to period of extended SER Open Item 3.6.1.2.1-1 inaccessible medium voltage Medium Voltage Cables operation response dated November cables not subject to 20,2002 10CFR50.49 Environmental Qualification Requirements 21 Implement the final version of A.3.6, Fuse holder Aging Prior to period of extended Response to SER the fuse holder interim staff Management Activity operation Confirmatory Item guidance when issued by the 3.6.2.2.2-1, letter dated NRC. January 29, 2003.

22 Implement fatigue A.4.2, Fatigue Prior to period of extended UFSAR Supplement management program Management Activities operation Appendix A.4.2 letter dated November 26, 2002 23 Submit RPV P-T curves for 54 A.5.1.1.2, P-T Limit Prior to period of extended RAI 4.2-5 response dated EFPY as license amendment Curves operation May 1,2002 0

t

N Item Commitment UFSAR Supplement Frequency Source 0 I _ _ _Location C..

24 Submit RPV circumferential A.5.1.1.3, Reactor Vessel Prior to period of extended UFSAR Supplement 0 weld examination relief Circumferential Weld operation Appendix A.5.1.1.3 letter request for 60 years Examination Relief dated November 26, 2002 and response to RAI 4.2-6, *11 C

1_letter dated May 1,.2002.