ML030300715

From kanterella
Jump to navigation Jump to search
Fourth-Interval Inservice Testing (IST) Program Plan and Request for Approval of IST Relief Requests
ML030300715
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 01/23/2003
From: Balduzzi M
Entergy Nuclear Operations, Entergy Nuclear Vermont Yankee
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BVY 03-10
Download: ML030300715 (2)


Text

En tergy Entergy Nuclear Vermont Yankee, LLC Entergy Nuclear Operations, Inc.

185 Old Ferry Road Brattleboro, VT 05302-0500 January 22, 2003 BVY 03-10 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

Vermont Yankee Nuclear Power Station License No. DPR-28 (Docket No. 50-271)

Fourth-Interval Inservice Testing (IST) Program Plan and Request for Approval of IST Relief Requests Vermont Yankee Nuclear Power Station (VY) has revised the Inservice Testing (IST) Program as required by I OCFR50.55a(f)(4)(ii) for the fourth 10-year interval starting September 1, 2003.

This submittal dockets VY's IST Program Procedure (PP 7013) and requests NRC approval of IST relief requests. The IST Program is broken down into three major components:

"* IST Program Procedure, which is an upper tier document,

"* IST Program Plan, which is Appendix A, Appendix B and Tables 1-21 and contains the applicable Code commitment text, component specific test requirement tables, cold shutdown justifications, refueling outage justifications, relief requests and technical positions as applicable, and

"* IST Component Database.

A summary of the four pump relief requests, the components affected, and the precedent is contained below. Detailed discussion of each of the four pump relief requests begin on page 68 of Appendix A.

RR-P01 Service Water pumps A similar request was approved for the 3rd ten-year interval.'

This request differs from the one previously approved in that VY does not propose to disassemble and examine the Service Water pumps on a fixed frequency, but rather as indicated by the results of periodic testing RR-P02 HPCI main/booster This alternative was previously, approved for the 3P" ten-year pump combination interval as RR-P04, Revision 1.

RR-P03 Diesel Fuel Oil Transfer This alternative was previously approved for the 3 rd ten-year pumps interval.

RR-P04 RCIC pumps This alternative was previously, approved for the 3rd ten-year RR-P__4

______pumpsinterval as RR-P10, Revision 2.

SUSNRC Letter to VYNPC, NVY 93-151, "Safety Evaluation of the Inscrvice Testing Program Relief Requests for Pumps and Valves, TAC No. M85067," dated September 3, 1993.

2 USNRC Letter to VYNPC, NVY 99-03, "Request or Alternative Testing Regarding the Inservice Testing (IST)

Program, TAC No. MA4273," dated January 14, 1999.

3 Same as footnote I above.

4 Same as footnote 2 above.

I-

BVY 03-10 A summary for both of the valve relief requests, the components affected, and the precedent is contained below.

Detailed discussion for both of the valve relief requests start on page 50 of Appendix B.

RR-VOI Various Valves This alternative was previously approved by the NRC for VY's 3Y ten-year interval as relief requests RR-V13 and RR-V14.5 The components, Code requirements, plant conditions and proposed alternatives are unchanged from those previously approved.

RR-V02 Instrumentation line This alternative was previously approved for the 3 ten-year excess flow check valves interval as RR-VI 9.6 Attachment I identifies the commitments made in this letter. contains the subject Program.

VY requests timely NRC review and approval of the IST Relief Requests in order to support implementation of the new program.

If you have any questions on this transmittal, please contact Mr. Thomas B. Silko at (802) 258-4146.

Sincerely, Michael A. Balduzzi Vice President, Operations Attachments cc:

USNRC Region I Administrator USNRC Resident Inspector - VY USNRC Project Manager - VY Vermont Department of Public Service

"* USNRC Letter to VYNPC, NVY 98-03, "Safety Evaluation of Relief Requests for the Third Interval Pump and Valve Inscrvice Testing Program, TAC No. M97544," dated January 15, 1998.

6 USNRC Letter to VYNPC, NVY 01-28, "Relief Request for Excess Flow Check Valve Testing in the Pump and Valve Inservice Test Program, TAC No. MB0415," dated April 2,2001.

Page 2 of 2