ML030300204

From kanterella
Jump to navigation Jump to search
Inservice Inspection Summary Report
ML030300204
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/21/2003
From: Beasley J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-0167
Download: ML030300204 (3)


Text

J. Barnie Beasley, Jr., RE.

Southern Nuclear Vice President Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992 7110 Fax 205 992 0341 Ir SOUTHERNjU COMPANY January 21, 2003 Energy to Serve Your World' Docket No: 50-364 NL-03-0167 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Inservice Inspection Summary Report Ladies and Gentlemen:

Southern Nuclear Operating Company (SNC) submits herewith the Farley Nuclear Plant Unit 2, Interval 3, Period 1, Outage 1 Inservice Inspection Summary Report (Enclosure 1). This report describes and summarizes the inservice inspection activities performed during its Fall 2002 maintenance/refueling outage. Paragraph IWA-6230 of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 1989 Edition requires submittal of the enclosed report. Also included in the report are inspection results required by Farley Nuclear Plant Technical Specification 5.6. 10.b for submittal to the NRC within 12 months following completion of the steam generator tube examinations.

The supporting inservice inspection documentation, e.g., examination plans and schedules, examination results and reports, examination methods and procedures, evaluation results, and corrective action and repairs, is available for review upon request at Farley Nuclear Plant.

The signed original and one copy of the subject report are provided for your review.

If there are any questions, please advise.

Sincerely, J. B. Beasley, Jr.

JBB/LPH/sdl

Enclosure:

Inservice Inspection Summary Report Farley Nuclear Plant Unit 2 Refueling 15 AD4?

U. S. Nuclear Regulatory Commission NL-03-0167 Page 2 cc:

Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. D. E. Gnssette, General Manager - Plant Farley Document Services RTYPE: CFA04.054 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Farley Mr. T. P. Johnson, Senior Resident Inspector - Farley (w/o Enclosure)

(w/o Enclosure)

(w/o Enclosure)

(w/o Enclosure)

(w/o Enclosure)

Inservice Inspection Summary Report Farley Nuclear Plant Unit 2 - Refueling 15