Modular Plant Licensing Industry Meeting with NRC May 22, 2002 I

Modular Plants

" Plants consisting of multiple reactor modules hold great promise for the future

", Enhanced safety and reliability

"* Improved economics

"* Ability to add capacity incrementally according to market conditions

"* Need to ensure that statutory and regulatory infrastructure is not unfair to modular plants pv-I Pu+;Dfls Wi+)utd Eý I


7

Objectives for Modular Plant Licensing

" Single NRC technical/safety review and single public hearing

" Approval to operate each module for 40-years

"* Assessment of a single retrospective Price-Anderson premium

"* Assessment of a single NRC annual f Integrated Approach

  • Applicants would

- Prepare a single FSAR covering all modules e Prepare a single Environmental Report (if an ESP is not referenced)

  • Simultaneously submit nearly identical COL /

S.applications for each module

  • NRC would

"° Use existing authority under the AEA to subject the set of modular COL applications to a integrated technical/safety review and a single public hearing

"* Issue an integrated set of nearly identical COLs,,;

one for each module I

I!

1 Integrated Approach (cont.)

. The set of modular COLs would authorize construction of all modules n Modular COLs would identify the estimated completion date for each module as specified by the applicant per 10 CFR 50.33(h) u Each COL would authorize operation after the module-specific 10 CFR 52.103(g) finding

  • Pending legislation would allow module-specific 40-year license terms to commence with each 10 CFR 52.103(g) finding LII Integrated Approach (cont.)

x Pending legislation would subject modular plants to a single Price-Anderson premium m NRC has authority to assess a single annual fee to multi-module plants, even if each module is licensed separately r

I I

I

Design Approval Under a COL

"* Regardless of licensing scenario, the SECY-01-0207 proposal for modular design re-reviews every five years is:

"* Unnecessary in light of the backfit rule (10 CFR 50.109)

"* Contrary to the intent that COLs resolve all safety issues and have a 40 year term

"* Adverse to Part 52 goal of standardization

"* Duration of design approval embodied in a COL is coincident with the license term!

Summary

"* Integrated, multi-license approach recommended to achieve practical objectives for modular plant licensing

"* Enabling legislation pending in Congress

"* Price-Anderson

"* Start of 40-year license term

"* Modular COL embodies design approval for the term of the license