ML030290329

From kanterella
Jump to navigation Jump to search
2002 Annual Report on Safety Relief Challenges for Peach Bottom Atomic Power Station
ML030290329
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/15/2003
From: West R
Exelon Nuclear
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML030290329 (1)


Text

Exekrn.

Exelon Nuclear Peach Bottom Atomic Power Station 1848 Lay Road Delta, PA 17314-9032 Telephone 717.456 7014 www exeloncorp corn Nuclear January 15, 2003 Docket Nos. 50-277 and 50-278 U.S. Nuclear Regulatory Commission DocumentControl Dýlk-Washington, D.C. 20555

SUBJECT:

2002 Annual Report on Safety Relief Challenges for the Peach Bottom Atomic Power Station Gentlemen:

This represents the 2002 Annual Report on Safety Relief Challenges for the Peach Bottom Atomic Power Station (PBAPS) as required by the TMI Action Plan, Item II. K.3, and by PBAPS Technical Requirement Manual Appendix A Item 5.0 R17. During 2002 there were no automatic actuations of the Main Steam Relief Valves or the Main Steam Safety Valves in response to high reactor pressure.

If you have any questions regarding this information, please contact John Kozakowski at (717) 456 3584.

Sincerely, W14-R. G. West Site Vice President, Peach Bottom Atomic Power Station RGW/EJE/CLB/JJK:jjk cc:

H. J. Miller, Administrator, Region I, US NRC A. C. McMurtray, US NRC Senior Resident Inspector, PBAPS ccn 03-14005

ý 00/