Evaluation of Licensees Clarification Letter 1.4 Percent Power Uprate Due to Installation of Caldon Leading Edge Flow Meter
ML030280440
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 02/10/2003
From: Raghavan L
NRC/NRR/DLPM/LPD3
To: Cayia F
Nuclear Management Co
References
TAC MB7194, TAC MB7195
Download: ML030280440 (6)


Text

February 10, 2003 Mr. Fred J. Cayia Site Vice President Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241

SUBJECT:

POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - EVALUATION OF LICENSEES CLARIFICATION LETTER REGARDING 1.4 - PERCENT POWER UPRATE DUE TO THE INSTALLATION OF A CALDON LEADING EDGE FLOW METER (TAC NOS. MB7194 AND MB7195)

Dear Mr. Cayia:

By letter dated December 20, 2002, the Nuclear Management Company, LLC (the licensee),

submitted information clarifying its April 30, 2002, license amendment application for a 1.4-percent measurement uncertainty recapture power uprate for Point Beach Nuclear Plant, Units 1 and 2 (PBNP). The Nuclear Regulatory Commission (NRC) staff approved the licensees April 30, 2002, application by License Amendment Nos. 207 and 212, dated November 29, 2002.

The clarifying information pertains to the licensees statements indicating that the intermediate range nuclear instrument flux trip setpoint would need to be rescaled, and that changes would need to be made to the Core Operating Limits Report (COLR) related to To of the overtemperature and overpower T trip setpoints. In its December 20, 2002, letter, the licensee stated that it recently determined that the intermediate range nuclear instruments would not need to be rescaled for the power uprate. The licensee made this determination because the current setpoint is approximately 25 percent of the current rated thermal power of 1518.5 MWt.

By scaling for the uprated power of 1540 MWt, the trip setpoint would be approximately 24.65 percent of rated thermal power. However, the PBNP Technical Specifications (TSs) allow this setpoint to be as high as 40 percent. Therefore, there is sufficient margin, and the licensee does not need to rescale the intermediate range nuclear instrument flux trip setpoint.

Since the TS limits are met, the NRC staff finds it acceptable for the licensee to not rescale their intermediate range instruments for the power uprate.

The licensee had indicated that the To for the overtemperature T and the overpower T will change because of the power uprate. Because of this change, the licensee determined that it would need to modify the procedure calibrating the To and the COLR. Therefore, in the NRC staffs safety evaluation issued with Amendment Nos. 207 and 212, the NRC staff agreed with the licensees assessment to update the COLR to include the changes to To. However, upon review of the proposed COLR received from PBNPs fuel vendor, the licensee noted that

F. J. Cayia the COLR does not list the specific numerical value of To and, therefore, does not need to be changed. Since the COLR does not list the specific value of To, the NRC staff agrees with the licensee that specific changes to the COLR to modify To are not necessary.

Sincerely,

/RA/

L. Raghavan, Chief, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301 cc: See next page

ML030280440 OFFICE PDIII-1/PM PDIII-1/LA PDIII-1/SC NAME DSpaulding RBouling LRaghavan DATE 02/05/03 01/31/03 02/10/03

Point Beach Nuclear Plant, Units 1 and 2 cc:

Mr. John H. ONeill, Jr.

Shaw, Pittman, Potts & Trowbridge 2300 N Street, NW Washington, DC 20037-1128 Mr. Richard R. Grigg President and Chief Operating Officer Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 53201 Site Licensing Manager Point Beach Nuclear Plant Nuclear Management Company, LLC 6610 Nuclear Road Two Rivers, WI 54241 Mr. Ken Duveneck Town Chairman Town of Two Creeks 13017 State Highway 42 Mishicot, WI 54228 Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Resident Inspector's Office U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, WI 54241 Ms. Sarah Jenkins Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, WI 53707-7854 Mr. Roy A. Anderson Executive Vice President and Chief Nuclear Officer Nuclear Management Company, LLC 700 First Street Hudson, WI 54016 Nuclear Asset Manager Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, WI 53201 October 2002