December 2002 NPDES Monthly Report Forms for Perry Nuclear Power Plant
ML030240259
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 01/09/2003
From: Hayes J
FirstEnergy Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation, State of OH, Environmental Protection Agency
References
PY-CEI/OEPA-0389L
Download: ML030240259 (6)


Text

FENOC Frs &-v tWe Operabng CorA-y Perry Nuclear Power Plant 10 Center Road Perry, Ohio 44081 James R. Hayes Manager - Radwaste, Environmental, Chemistry 440-280-7519 Fax: 440-280-5681 January 9, 2003 PY-CEI/OEPA-0389L Ohio Environmental Protection Agency Division of Water Pollution Control

--Enforcement Section,-ES/MOR-P.O. Box 1049 Columbus, Ohio 43216-1049 Ladies and Gentlemen:

Enclosed are the NPDES monthly report forms for the month of December 2002.

No violations occurred during this period.

If you have questions or require additional information, please contact Mr. Leo Hart:

at (440) 280-5514.

Very truly yours,

_Enclosures-cc: NRC Region LII NRC Resident Inspector NRC Project Manager NRC Document Control Desk (Docket No. 50-440)

/,

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:

Station Code Reported Date (Month Year):

Application:

117 Perry Nuclear Power Plant 004 December 2002 31B00016*GD Perry Nuclear Power Plant Sampling Station

Description:

Page l 0 10 Center Rd.

Po int s tati ve ofscriptione PerryOH44081 Point Representative of Discharge in(l) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab:

Analyst:

in(2) - Enter frequency of sampling CCB 125 Leo J.

Harte (1) 3 3

1 3

1 3

(2) 1 1

999 1

999 1

(00400)

(01119)

(00011)

(34044)

(50050)

(50064)

(78739) pH Copper, Total Water Temperature Oxidants, Total Flow Rate Chlorine, Free orination/Brominat S.U.

Recoverable F

Residual MGD Available Duration Day ug/l F

mg/l Minutes 01 55 46.8 0.02 60 02 18 57.2 46.8 0.08 55 03 8.34 48.7 46.8 0.06 20 04

51. 8 53.5 05 56.3 42.4 0.04 20 06 8.32 50.9 44.2 0

20 07 51.8 47.4 0.01 20 08 47.3 42 0.02 20 09 54.5 46.3 0

20 10 8.56 54.5 51.6 0.01 20 11 51.8 52.5 0.11 30 12 50.9 39.9 0.04 20 13 8.3 49 56.7 0

20 14 49 47.4 0

30 15 50 45.4 0

30 16 50 45.8 0.01 30 17 8.58 50.9 47.9 0.01 30 18 55.4 52 0

30 19 66.2 35.4 0.02 30 20 8.43 45 39.1 0.04 20 21 47 36 0.01 20 22 53 39.6 0.03 50 23 55.4 40.9 0

35 24 8.33 55 36.2 0.02 50 25 57 37.8 0.03 50 26 55 38.5 0

60 8"35"---'

55 42 0.01 55 28 f 59 39.4 0.03 50 29 55 40.5 0.01 55 30 64 37.2 0

65 31 8.24 62 43.3 0.01 35 t

75.45 18 1663.6 0

1361.3 0.82 1070 AVG 8.3833 18 53.6645 43.9129 0.0265 34.5161 MAX 8.58 18 66.2 56.7 0.2 65 1MIN 8.24 18 45 35.4 0

20 Additional Remarks:

No bromine products used for the month.

I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information Is true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and impnsonment Form No EPA 4500 (8-91)

Date Report Completed:

  • gI;,fy 0

SURI 01/07/2003 Signature of Reporter:

Title of Reporter:

Manager, Environmental

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:

Station Code:

Reported Date (Month Year):

Application:

117 Perry Nuclear Power Plant 601 December 2002 31B00016*GD Perry Nuclear Power Plant Sampling Station

Description:

Page 1 o 10 Center Rd.

Smln tto ecito PerryOH44081 Discharge from Regenerate Neutralization Pits in(l) - Enter I for Continuous, 2 for Composite. 3 for Grab Sample Reporting Lab:

Analyst:

in(2) - Enter frequency of sampling CCB 125 Leo J.

Harte (1) 3 1 (2) 1 l1 999" (00400)

(00530)

(00550)

(50050) pH Total Suspended Oil and Grease, Flow Rate S.U Solids Total MGD Day mg/l mg/l 01 iAH 02 7.24 5

AA 0.016 03 1A 05 j AH 06 JA 07 AR 08 AM 09 A

10 7

AA 0.016 11 7

AH 12 7.68 0.017 13 iAli 14 AHI 15 1

_A_

16 A

18

_A 20 8.02 AA 0.015 21 A

___2___

AM 23 Ali 24 AM 25~

AB 26 A

28 AH S29 AH i3O0 AH 31

__AH TOTAL 29.94 17 0

0.064 0

8.2o

.017I4 AVG 7.485 5.6667 0

0.016 MAX 8.02 7

0 0.017 MIN 7

5 0

0 Additional Remarks:

Sample was not analyzed within the 7 day requirement stated by EPA methods.

This sample was not necessary to meet the permit measuring frequency of "1/2 Weeks",

as a TSS analysis was performed on December 10, 2002.

Less than MDL.

Less than MDL.

I certfy under the penalty of law that I have personally examined and am familiar with the Information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete I am aware that there are significant penalties for submitting false Information, including the possibility of fine and imprisonment Form No EPA 4500 (8-91)

Date Report Completed:

,F1s/URI0 0/07/2003 Signature of Reporter:

Title of Reporter:

Manager, Environmental

TZss than MDL.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

-No.discharge -performed -this -date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

No discharge performed this date.

N6 discharge performed this date.

I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete I am aware that there are significant penalties for submitting false information, including the possibility of fine and impnsonment Form No EPA 4500 (8-91) Date Report Completed:

Signature of Reporter:

Title of Reporter:

2rVJg* )SURl 01/07/2003 AW I4 Manager, Environmental

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:

Station Code Reported Date (Month Year)

Application:

1/7 Perry Nuclear Power Plant 602 December 2002 31B00016*GD Perry Nuclear Power Plant Sampling Station Description :

Page 1 o PentrOH4408R Discharge from Chemical Cleaning Lagoon in(l) - Enter 1 for Continuous, 2 for Composite, 3 for Grab Sample Reporting Lab:

Analyst:

in(2) - Enter frequency of sampling CCB 125 Leo J.

Harte

()

2 2

32 3

(2) 998 998 1

998 1

999 (00980)

(01119)

(00400)

(00530)

(00550)

(50050)

Iron, Total Copper, Total pH Total Suspended Oil and Grease, Flow Rate Recoverable Recoverable ug/i Solids Total ug/i Day ug/l ug/i ug/l ug/l 01 AL 02 03 05 07 o08 09 10 I 11 12 F131 14 15, 16 17 18 19 20 21 22 23 L24 25 26 28 29 30 TOTAL 0o AVG0 MAX 0

MIN 0

Additional Remarks:

No discharge performed for the month.

I certify under the penalty of law that I have personally examined and am familiar with the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information. I believe the submitted information Is true, accurate and complete I am aware that there are significant penalties for submitting false Information, including the possibility of fine and impnsonment.

Form No EPA 4500 (8-91)

Date Report Completed:

gEfftE,6)SURI 01/07/2003 Signature of Reporter:

jc;t4 K1qz 7

Title of Reporter:

Manager, Environmental

MONTHLY REPORT FORM 4500 Name, Address City, County, ZIP:

Station Code:

Reported Date (Month Year)

Application:

117 Perry Nuclear Power Plant 800 December 2002 31B00016*GD Perry Nuclear Power Plant Sampling Station Description Page 1 o 10 Center Rd.

PerryOH44081 Intake Water from Lake Erie in(1) - Enter I for Continuous. 2 for Composite, 3 for Grab Sample Reporting Lab:

Analyst:

n(2) - Enter frequency of sampling CCB 125 Leo J.

Harte (1) 3 1

(2) 1 999 o01119)

(00011)

Copper, Total later Temperature Recoverable F

Day ug/_

01 41 02 6

40 03 38 J04 36 05 37 06 37 07 36 08 36 09 36 10 34 11 36 12 35 13 36 14 36 S15 37

__16 36 17 36 S18 36 19 j_______

37 20 39 S21 38 22 38 23 38 24 37 25 36 26 35 S27 3

t28 36 29 35

_______1_______

30 35 31 36 TOTAL 6

1134 00 00 AVG 6

36.5806 MAX 6

41 MIN 6

34 Additional Remarks:

I certify under the penalty of law that I have personally examined and am familiar wth the information submitted and based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submting false information, including the possibility of fine and impnsonment.

Form No EPA 4500 (8-91)

Date Report Completed:

l; ff SURI 1 01/07/2003 Signature of Reporter:

&1~'ý 1z "

Title of Reporter:

Manager, Environmental I