December 2002 Monthly Operating Report for Perry Unit 1
ML030230671
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 01/13/2003
From: Higaki V
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, PY-CEI/NRR-2681L
Download: ML030230671 (3)


Text

Perry Nuclear Power Plant FENOC 10 Center Road

" "-Aft PO. Box 97 FRrstEnergy MiNear Operating Company Perry, Ohio 44081 January 13, 2003 PY-CEI/NRR-2681L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:

Attached is the December 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."

If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.

Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector

OPERATING DATA REPORT UNIT:

Perry DATE:

1/8/03 Docket: 50-440 Unit Name:

Perry Nuclear Power Plant Reporting Period: December 2002 Utility

Contact:

T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):

Maximum Dependable Capacity (Net MWe):

1.
2.
3.
4.
5.
6.

7.

Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)

This Month 744.0 744.0 0.0 02i4 1Rr n Yr-to-Date 8318.3 8197.3 0.0 9.974,809.0 Cumulative 104,903.5 0.0 I1t6575.211.0 1260 1235

8.
9.
10.

11.

Page 1 O

o*

116 57-5-211.0 I = OV*mV

UNIT SHUTDOWNS REPORT MONTH - December 2002 ii DOC(IET NO: 50-440 NAMt: Perry Nuclear Power Plant DATE: 1/8/03 CONTACT: T. Phelps TELLPHONE: (440) 280-7660 No.

Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence I

Hours 2

3

SUMMARY

The unit was on line the entire month of December 2002.
1. TYPE:

F: Forced S: Scheduled

2. REASON:

A - Equipment Failure (explain)

B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &

Ucense Examination F - Administrative G - Operational Error (explain)

H - Other (explain)

3. METHOD:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4-Continuation 5 - Other Page 2