Perry Nuclear Power Plant FENOC 10 Center Road
" "-Aft PO. Box 97 FRrstEnergy MiNear Operating Company Perry, Ohio 44081 January 13, 2003 PY-CEI/NRR-2681L United States Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant Docket No. 50-440 License No. NPF-58 Monthly Operating Report Ladies and Gentlemen:
Attached is the December 2002 Monthly Operating Report for Perry Unit 1. Page 1 is the Operating Data Report and page 2 is the Unit Shutdowns Report. This report is submitted in accordance with Technical Specification 5.6.4 and Generic Letter 97-02, "Revised Contents of the Monthly Operating Report."
If you have questions or require additional information, please contact Ms. Toni Phelps at (440) 280-7660.
Very truly yours, Vernon K. Higaki Manager - Regulatory Affairs Attachment cc: NRC Region III Administrator NRC Project Manager NRC Resident Inspector
OPERATING DATA REPORT UNIT:
Perry DATE:
1/8/03 Docket: 50-440 Unit Name:
Perry Nuclear Power Plant Reporting Period: December 2002 Utility
Contact:
T. Phelps Telephone: 440-280-7660 Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
Hours Reactor was Critical Hours Generator On-Line Unit Reserve Shutdown Hours Net Electrical Energy (MWeH)
This Month 744.0 744.0 0.0 02i4 1Rr n Yr-to-Date 8318.3 8197.3 0.0 9.974,809.0 Cumulative 104,903.5 0.0 I1t6575.211.0 1260 1235
- 8.
- 9.
- 10.
11.
Page 1 O
o*
116 57-5-211.0 I = OV*mV
UNIT SHUTDOWNS REPORT MONTH - December 2002 ii DOC(IET NO: 50-440 NAMt: Perry Nuclear Power Plant DATE: 1/8/03 CONTACT: T. Phelps TELLPHONE: (440) 280-7660 No.
Date Type Duration Reason Method Cause and Corrective Action to Prevent Recurrence I
Hours 2
3
SUMMARY
- The unit was on line the entire month of December 2002.
- 1. TYPE:
F: Forced S: Scheduled
- 2. REASON:
A - Equipment Failure (explain)
B - Maintenance or Test C - Refueling D - Regulatory E - Operating Training &
Ucense Examination F - Administrative G - Operational Error (explain)
H - Other (explain)
- 3. METHOD:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4-Continuation 5 - Other Page 2