0 FPL Florida Power & Light Company, 6501 South Ocean Drive, Jensen Beach, FL 34957 January 13, 2003 L-2003-004 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthly Operating Report Pursuant to Technical Specification 6.9.1.6, and the guidance of Generic Letter 97-02, attached are the December 2002 Operating Data Report, Summary of Operating Experience Report, and Unit Shutdowns and Power Reductions for St. Lucie Units 1 and 2.
Please contact us should there be any questions regarding this information.
Donald Rk.e!r3 Vice President St. Lucie Plant DEJ/spt Attachments an FPL Group company
DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit 1 January 2, 2003 J. A. Rogers (772) 467-7296 REPORTING PERIOD: December 2002 Design Electrical Rating (Mwe-Net).
Maximum Dependable Capacity (Mwe-Net)
Number of Hours Reactor Critical Number of Hours Generator On Line Unit Reserve Shutdown Hours Net Electrical Energy (MWH) 830 839 MONTH 744 744 0.0 639772
-YTD 8183.5 8163.3 0.0 6919395 CUMULATIVE 184784 182950.3 0.0 149596134
- 1.
- 2.
- 3.
- 4.
- 5.
6.
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit I January 2,2003 J. A. Rogers (772) 467-7296 REPORT MONTH: December 2002 Unit operated at essentially full power through the entire month of December.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-335 St. Lucie Unit I January 2, 2003 J. A. Rogers (772) 467-7296 REPORT MONTH: December 2002 Cause & Corrective Action to Prevent Recurrence Unit I operated at essentially full power for the entire month of December.
3 Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
I 2
F Forced S Scheduled
DOCKET NO.:
UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie Unit 2 January 2, 2003 J. A. Rogers (772) 467-7296 REPORTING PERIOD: December 2002
- 1. Design Electrical Rating (Mwe-Net).
- 2. Maximum Dependable Capacity (Mwe-Net)
- 3. Number of Hours Reactor Critical
- 4. Number of Hours Generator On Line
- 5. Unit Reserve Shutdown Hours
- 6. Net Electrical Energy (MWH)--
830 839 MONTH 744 744 0.0 632968
-YTD 8745.4 8742.6 0.0 7424988 CUMULATIVE 148758.6 147000.3 0.0 121155634
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie Unit 2 January 2, 2003 J. A. Rogers (772) 467-7296 REPORT MONTH: December 2002 Unit 2 operated at essentially full power through the entire month of December.
In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the power operated relief valves or the safety valves during the report period.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
UNIT:
DATE:
COMPLETED BY:
TELEPHONE:
50-389 St. Lucie Unit 2 January 2, 2003 J. A. Rogers (772) 467-7296 REPORT MONTH: December 2002 3
Reason A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E-Operator Training & License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
Method 1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Load Reduction 9 - Other (Explain)
Number Date Typel Duration Reason2 Method of Cause & Corrective (Hours)
Shutting Down Action to Reactor3 Prevent Recurrence Unit 2 operated at essentially full power for the entire month of December.
2 F Forced S Scheduled 1