December 2002 Monthly Operating Report for Beaver Valley Units 1 & 2
ML030230371
Person / Time
Site: Beaver Valley
Issue date: 01/09/2003
From: Bezilla M
FirstEnergy Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-03-001
Download: ML030230371 (5)


Text

FENOC FfrstEnergy N.c.ea, Cper-t.1 Company Beaver Valley Power Station P. O. Box 4 Shippingport, PA 15077 L-03-001 January 9, 2003 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66

-Unit 2.- Docket No. 50-412, License No.-NPF-73 Monthly Operating Report U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

In accordance with NRC Generic Letter 97-02, "Revised Contents of the Monthly Operating Report", and Unit 1 and 2 Technical Specification 6.9.4, the "Monthly Operating Report" is submitted for Unit 1 and Unit 2 for the month of December 2002.

Respectfully, M. B. Bezilla-Y Vice-President DTJ/cmg Enclosures cc:

NRC Regional Office King of Prussia, PA

<ii

UNIT SHUTDOWNS REPORTING PERIOD:

December 2002 DOCKET NO.

UNIT NAME DATE COMPLETED BY TELEPHONE 50-334 BVPS Unit #1 January 2, 2003 David T. Jones (724) 682-4962 (1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training / License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(2) Method 1 - Manual 2 - Manual Trip I Scram 3 - Automatic Trip I Scram 4 - Continuation 5 - Other (Explain)

SUMMARY

The Unit operated at a nominal value of 100% output for the entire report period.

OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

REPORT DATE:

COMPLETED BY:

TELEPHONE:

REPORTING PERIOD:

DECEMBER 2002 DESIGN ELECTRICAL RATING (Net MWe):

-MAX.

DEPENDABLE-CAPACITY-(Net-We):-

50-334 BVPS UNIT #1 01102/03 DAVID T.

JONES (724) 682-4962

  • Notes:

Rated thermal power at

  • BVPS-1 was uprated from 2652 MWt*
  • to 2689 MWt on 10/20/01.

Net

  • MDC was also uprated from
  • 810 MWe to-821 MWe.

835

--821 -

HOURS IN REPORTING PERIOD:

NO.

OF HRS.

REACTOR WAS CRITICAL:

SERVICE HOURS GENERATOR ON LINE:

UNIT RESERVE SHUTDOWN HOURS:

NET ELECTRICAL ENERGY GEN.

(MWH):

GROSS ELECT. ENERGY GEN.

(MW14):

GROSS THERMAL ENERGY GEN.

(MWH):

UNIT AVAILABILITY FACTOR (%):

UNIT CAPACITY FACTOR (MDC)

(M):

UNIT FORCED OUTAGE RATE (%):

THIS MONTH 744.0 744.0 744.0 0.0 625290.0 661240.0 1997926.0 100.0 102.4 0.0 YEAR TO DATE 8760.0 8509.1 8490.1 0.0 6989864.0 7402804.0 22636504.0 96.9 97.2 0.6 CUMULATIVE 233784.0 160591.5 158112.0 0.0 118656007.0 126669590.0 390271309.5 69.1 64.5 15.7 Ia.

1.

2.

3a.

3.
4.
5.
6.
7.
8.
9.
10.

ii.

UNIT SHUTDOWNS REPORTING PERIOD:

December 2002 DOCKET NO.

50-412 UNIT NAME BVPS Unit #2 DATE January 2, 2003 COMPLETED BY David T. Jones TELEPHONE (724) 682-4962 No.

Date Type Duration Reason Method of Cause ICorrective Actions (Y/M/D)

F: Forced (Hours)

(1)

Shutting

_____S scheduled

____Don()Comments NONE.

(1) Reason (2) Method A - Equipment Failure (Explain) 1 - Manual B - Maintenance or Test 2 - Manual Trip / Scram C - Refueling 3 -Automatic Trip / Scram D - Regulatory Restriction 4 -Continuation E - Operator Training / Ucense Examination 5 -Other (Explain)

F - Administrative G - Operational Error (Explain)

H - Other (Explain)

SUMMARY

The Unit began the report period operating at a nominal value of 100% output. At 2010 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.64805e-4 months <br /> on 12/13/02, the Unit began a load reduction to approximately 75% output in order to clean the Al and A2 waterboxes in the Main Unit Condenser. An output of approximately 75% was achieved at 2219 hours0.0257 days <br />0.616 hours <br />0.00367 weeks <br />8.443295e-4 months <br /> on 12/13/02. Following completion of cleaning the Al and A2 waterboxes in the Main Unit Condenser, the-Unit commenced to return to-full power at 2021 hours0.0234 days <br />0.561 hours <br />0.00334 weeks <br />7.689905e-4 months <br /> on 12/15/02. -A-nominal value of l00%--

output was achieved at 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> on 12/16/02. The Unit continued to operate at a nominal value of 100% output for the remainder of the report period.

OPERATING DATA REPORT DOCKET NO.:

UNIT NAME:

REPORT DATE:

COMPLETED BY:

TELEPHONE:

50-412 BVPS UNIT #2 01/02/03 DAVID T. JONES (724) 682-4962 REPORTING PERIOD:

DECEMBER 2002 DESIGN ELECTRICAL RATING (Net MWe):

-MAX.

DEPENDABLE CAPACITY-(Net MWe):

836 831 Notes: Rated thermal power at BVPS-2 was uprated from 2652 MWt*

to 2689 Mwt on 10/30/01.

Net MDC was also uprated from 820 MWe to-831 We.

HOURS IN REPORTING PERIOD:

NO.

OF HRS.

REACTOR WAS CRITICAL:

SERVICE HOURS GENERATOR ON LINE:

UNIT RESERVE SHUTDOWN HOURS:

NET ELECTRICAL ENERGY GEN.

(MWH):

GROSS ELECT. ENERGY GEN.

(MWH):

GROSS THERMAL ENERGY GEN.

(KWH):

UNIT AVAILABILITY FACTOR (M):

UNIT CAPACITY FACTOR (MDC)

(9}):

UNIT FORCED OUTAGE RATE (%):

THIS MONTE 744.0 744.0 744.0 0.0 617398.0 648158.0 1962536.0 100.0 99.9 0.0 YEAR TO DATE 8760.0 8200.6 8133.9 0.0 6604311.0 6957302.0 21192030.0 92.9 90.7 0.2 CUMULATIVE 132567.0 109555.1 108826.5 0.0 85182403.0 90032045.0 274599611.0 82.1 77.5 9.8 la.

1.

2.

3a.

3.
4.
5.
6.
7.
8.
9.
10.

II.