ML030210581

From kanterella
Jump to navigation Jump to search
NRC Exam Notification Ltr Dated 01/17/03
ML030210581
Person / Time
Site: Beaver Valley
Issue date: 01/17/2003
From: Conte R
NRC/RGN-I/DRS/OSB
To: Hynes C
FirstEnergy Nuclear Operating Co
Conte R
References
50-412/03-302
Download: ML030210581 (3)


Text

January 17, 2003 Mr. Christopher Hynes, Superintendent Operations Training FirstEnergy Nuclear Operating Co.

Beaver Valley Power Station, Unit 2 P.O. Box 4 Shippingport, PA 15077

Dear Mr. Hynes:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on December 13, 2002, and the operating tests administered December 16-20, 2002, at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. Nine individuals were administered the examination and nine passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.790 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.

Thank you for your cooperation in this matter. Please refer any questions you have to me at 610-337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-412 License No. NPF-73

Mr. Christopher Hynes

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

M. Bezilla, Senior Vice President

Mr. Christopher Hynes Distribution: w/o enclosures:

Master Exam File DOCUMENT NAME: G:\OSB\Bissett\BV2ExamDec02\Examdels:NotificationLtr.wpd ADAMS PACKAGE: ML013400413 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy 2)),&( 5,'5626% 5,'5626% 5,'5626%  

1$0( &%XUDFNHU5$ 3ELVVHWW5$ 5-&RQWH5$

'$7(     

2)),&,$/5(&25'&23<