Entergy Nuclear Operations, Inc., Pilgrim Nuclear Power Station, Technical Specifications, for Amendment 195, Page B3/4.6-11, Bases: 3/4.6 Primary System Boundary
ML030160269
Person / Time
Site: Pilgrim
Issue date: 01/14/2003
From: Travis Tate
NRC/NRR/DLPM/LPD1
To:
References
TAC MB5682
Download: ML030160269 (6)


Text

This page is intentionally left blank.

Revision Amendment No. 20, 60, *3, 151 195 3/4.6-9

This page is intentionally left blank.

Revision Amendment No. 20, 60, 03,154 -195 3/4.6-10

This page is intentionally left blank.

Revision Amendment No. 20, 40, 60, 151, 153 195 3/4.6-11

This page is intentionally left blank.

Revision Amendment No. 20. 40, 60. 195 314.6-12

BASES:

3/4.6 PRIMARY SYSTEM BOUNDARY (Cont)

G. Structural Integrity The Pilgrim Nuclear Power Station Inservice Inspection Program conforms to the requirements of 1 OCFR50.55a(g). Where practical, the inspection of ASME Section XI Class 1, 2, and 3 components conforms to the edition and addenda of Section XI of the ASME Boiler and Pressure Vessel Code required by 10CFR50.55a(g). When implementation of an ASME Code required inspection has been determined to be impractical for PNPS, a request for relief from the inspection requirement is submitted to the NRC in accordance with 1 OCFR50.55a(g)(5)(iii).

Requests for relief from the ASME Code inspection requirements will be submitted to the NRC prior to the beginning of each 10 year inspection interval for which the inspection requirement is known to be impractical. Requests for relief from inspection requirements which are identified to be impractical during the course of the inspection interval will be reported to the NRC on an annual basis throughout the inspection interval.

Revision Amendment No. 19, 93,1- 195 B3/4.6-1 1

This page is intentionally left blank.

Revision Amendment No. 20, 60, 93, 153 195 B3/4.6-12