ML030150749

From kanterella
Jump to navigation Jump to search
Meeting Summary; Nebraska Public Power District; Cooper Nuclear Station to Discuss Revision 2 of the Cooper Strategic Improvement Plan
ML030150749
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/15/2003
From: Kennedy K
NRC/RGN-IV/DRP
To: Warren C
Nebraska Public Power District (NPPD)
References
Download: ML030150749 (5)


Text

January 15, 2003 Clay C. Warren, Vice President of Nuclear Energy Nebraska Public Power District P.O. Box 98 Brownville, Nebraska 68321

SUBJECT:

SUMMARY

OF MEETING WITH COOPER NUCLEAR STATION

Dear Mr. Warren:

This refers to the meeting conducted in Arlington, Texas, on December 18, 2002. The purpose of this meeting was to discuss Revision 2 of the Cooper Nuclear Station Strategic Improvement Plan. The attendance list is enclosed. Topics discussed included Nebraska Public Power Districts regulatory commitments associated with the improvement plan, NRC plans for the content of a confirmatory action letter, improvement plan performance indicators, the schedule for completion of improvement plan actions, and the incorporation of Revision 1 actions into Revision 2 of the improvement plan. During this meeting, members of your staff stated that the performance indicators associated with the improvement plan, and the documentation describing the transition from Revision 1 to Revision 2 of the improvement plan, would be completed and available for NRC review by January 31, 2003.

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Kriss M. Kennedy, Chief Project Branch F Division of Reactor Projects Docket: 50-298 License: DPR-46

Enclosure:

Attendance List

Nebraska Public Power District cc w/enclosure:

Michael T. Coyle Site Vice President Nebraska Public Power District P.O. Box 98 Brownville, Nebraska 68321 John R. McPhail, General Counsel Nebraska Public Power District P.O. Box 499 Columbus, Nebraska 68602-0499 P. V. Fleming, Licensing Manager Nebraska Public Power District P.O. Box 98 Brownville, Nebraska 68321 Michael J. Linder, Director Nebraska Department of Environmental Quality P.O. Box 98922 Lincoln, Nebraska 68509-8922 Chairman Nemaha County Board of Commissioners Nemaha County Courthouse 1824 N Street Auburn, Nebraska 68305 Sue Semerena, Section Administrator Nebraska Health and Human Services System Division of Public Health Assurance Consumer Services Section 301 Centennial Mall, South P.O. Box 95007 Lincoln, Nebraska 68509-5007 Ronald A. Kucera, Deputy Director for Public Policy Department of Natural Resources 205 Jefferson Street Jefferson City, Missouri 65101 Jerry Uhlmann, Director State Emergency Management Agency P.O. Box 116 Jefferson City, Missouri 65101

Nebraska Public Power District Vick L. Cooper, Chief Radiation Control Program, RCP Kansas Department of Health and Environment Bureau of Air and Radiation 1000 SW Jackson, Suite 310 Topeka, Kansas 66612-1366 Daniel K. McGhee Bureau of Radiological Health Iowa Department of Public Health 401 SW 7th Street, Suite D Des Moines, Iowa 50309 William J. Fehrman, President and Chief Executive Officer Nebraska Public Power District 1414 15th Street Columbus, Nebraska 68601

Nebraska Public Power District Electronic distribution by RIV:

Regional Administrator (EWM)

DRP Director (ATH)

DRS Director (DDC)

Senior Resident Inspector (SCS)

Branch Chief, DRP/F (KMK)

Senior Project Engineer, DRP/F (TRF)

Staff Chief, DRP/TSS (PHH)

RITS Coordinator (NBH)

Jim Isom, Pilot Plant Program (JAI)

RidsNrrDipmLipb Scott Morris (SAM1)

CNS Site Secretary (SLN)

R:\\_CNS\\CN12-18-02MS-DRP.wpd RIV:C:DRP/F KMKennedy;df

/RA/

1/15/03 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

ATTENDANCE LIST NRC Attendees:

E. Collins, Deputy Director, Division of Reactor Projects (DRP)

K. Kennedy, Chief, Project Branch F, DRP T. Farnholtz, Senior Project Engineer, Project Branch F, DRP B. Tindell, Student Engineer Licensee Attendees:

M. Coyle, Site Vice President, Cooper Nuclear Station P. Fleming, Manager, Risk and Regulatory Affairs R. Grazio, Project Manager