ML030140320

From kanterella
Jump to navigation Jump to search
Tech Spec Page 3/4 6-13 (Scan)
ML030140320
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/07/2003
From:
Office of Nuclear Reactor Regulation
To:
References
Download: ML030140320 (1)


Text

CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS 4.6.1.7.1 Each 48-inch containment purge supply and exhaust isolation valve shall be verified to be sealed closed at least once per 31 days.

4.6.1.7.2 At least once per 18 months, the inboard and outboard isolation valves with resilient material seals in each sealed closed 48-inch containment purge supply and exhaust penetration shall be demonstrated OPERABLE by verifying that the measured leakage rate is less than 0.05 L, when pressurized to Pa.

4.6.1.7.3 At least once per 18 months each 18-inch supplementary containment purge supply and exhaust isolation valve with resilient material seals shall be demonstrated OPERABLE by verifying that the measured leakage rate is less than 0.01 La when pressurized to Pa.

4.6.1.7.4 At least once per 31 days each 18-inch supplementary containment purge supply and exhaust isolation valve shall be verified to be closed or open in accordance with Specification 3.6.1.7.b.

SOUTH TEXAS - UNITS 1 & 2 3/4 6-13 Unit 1 -Amendment No. 147 Unit 2 - Amendment No. 135 9

I I