ML030110034

From kanterella
Jump to navigation Jump to search
Exam Notification Ltr Dtd 1/9/03
ML030110034
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/09/2003
From: Conte R
NRC/RGN-I/DRS/OSB
To: Wilson M
Dominion Nuclear Connecticut
Conte R
References
Download: ML030110034 (4)


Text

January 9, 2003 Mr. Michael Wilson, Manager Nuclear Training Dominion Nuclear Connecticut, Inc.

Millstone Power Station, Unit 2 Rope Ferry Road Waterford, CT 06385

Dear Mr. Wilson:

The purpose of this letter is to inform you of the individual examination results for your applicants on the initial written examination conducted on October 25, 2002, and the operating tests administered December 16-20, 2002 at your facility. This meets the intent of section E.1 of the Examiner Standards (ES 501) in NUREG 1021. Twelve individuals were administered the examination and twelve passed. This information is considered to be "proprietary" in accordance with 10 CFR 2.790 and it supplements the information contained in the related examination report for your facility which will be issued shortly. is the completed ES-501-2, Power Plant Licensing Examination Results Summary, and is a summary of overall examination results. contains the individual results ES-303-1 and 303-2, Operator License Examination Report, for the applicants. Contained therein are the deficiencies noted for each applicant. In accordance with your Systems Approach to Training (SAT) Program, we expect that you will review these results and provide appropriate remedial training for the individual independent of the overall pass status. The applicant has authorized the release of this information to your facility by signing Block 19A of NRC Form 398. is a copy of the licenses.

Thank you for your cooperation in this matter. Please refer any questions you have to me at 610-337-5183.

Sincerely,

/RA/

Richard J. Conte, Chief Operational Safety Branch Division of Reactor Safety Docket No. 50-336 License No. DPR-65

Mr. Michael Wilson

Enclosures:

1. ES-501-2, Power Plant Licensing Examination Results Summary
2. ES-303-1 and 303-2, Individual Examination Results
3. Licenses cc w/licenses:

J. Alan Price, Vice President

Mr. Michael Wilson Distribution: w/o enclosures:

Master Exam File DOCUMENT NAME: G:\OSB\Caruso\MS2ExamDec02\NotificationLtr.wpd ADAMS PKG: ML0210600660 To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy 2)),&( 5,'5626% 5,'5626% 5,'5626%  

1$0( &%XUDFNHU5$ -&DUXVR5$ 5-&RQWH5$

'$7(     

2)),&,$/5(&25'&23<