ML030100344
| ML030100344 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/02/2003 |
| From: | Boland A Division of Reactor Safety II |
| To: | Stall J Florida Power & Light Co |
| References | |
| Download: ML030100344 (5) | |
Text
January 2, 2003 Florida Power and Light Company ATTN:
Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT:
INSPECTION OF SECURITY INTERIM COMPENSATORY MEASURES
Dear Mr. Stall:
On August 26, 2002, the NRC staff completed its mid-cycle plant performance assessment of the Turkey Point facility and provided you with an inspection plan detailing the inspections scheduled through September 30, 2003. At that time, you were advised that the NRC was in the process of finalizing a Temporary Instruction (TI) that would be used to review implementation of the Security Interim Compensatory Measures (ICMs) required by the Agencys Order issued on February 25, 2002, and you would be informed of the schedule for the TI inspection at a later date.
On September 13, 2002, TI 2515/148, Revision 1, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, was issued. Subsequently, we conducted a pre-inspection audit utilizing Appendix A of the TI to obtain preliminary information on your implementation of the ICMs. With the completion of the audits at the Region II sites, we have developed an inspection schedule to complete the remaining portion of the TI, Appendices B and C, which will fully examine the details of implementation of the ICMs in the areas of security, operations, emergency planning, and information technology. The schedule for these inspections at Region II sites is enclosed. In addition, the TI is being conducted in lieu of the security baseline inspections in the schedule enclosed with our August 26, 2002 letter; however, additional inspections may be scheduled later in calendar year 2003.
If you have any questions regarding the conduct or schedule of TI 2515/148 inspections, please contact me at 404-562-4653.
Sincerely,
/RA/
Anne T. Boland, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-250, 50-251 License Nos. DPR-31, DPR-41
Enclosure:
TI Inspection Schedule
FP&L 2
cc w/encl:
T. O. Jones Plant General Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution John P. McElwain Site Vice President Turkey Point Nuclear Plant Florida Power and Light Company 9760 SW 344th Street Florida City, FL 33035 Walter Parker Licensing Manager Turkey Point Nuclear Plant Florida Power and Light Company Electronic Mail Distribution Don Mothena, Manager Nuclear Plant Support Services Florida Power & Light Company Electronic Mail Distribution Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company Electronic Mail Distribution M. S. Ross, Attorney Florida Power & Light Company Electronic Mail Distribution Jim Reed Document Control Supervisor Florida Power & Light Company Electronic Mail Distribution Attorney General Department of Legal Affairs The Capitol Tallahassee, FL 32304 William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution County Manager Metropolitan Dade County Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution Curtis Ivy City Manager of Homestead Electronic Mail Distribution
FP&L 3
Distribution w/encl:
E. Brown, NRR C. Evans (Part 72 Only)
RIDSNRRDIPMLIPB PUBLIC OFFICE RII RII SIGNATURE ATB KDL NAME A Boland L Wert DATE 01/02/03 12/31/02 1/ /2003 1/ /2003 1/ /2003 1/ /2003 1/ /2003 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\\ORPCheckout\\FileNET\\ML030100344.wpd
TI 2515/148 INSPECTION SCHEDULE Date (Week of)
Site Completed Catawba 01/06/03 Surry 01/13/03 Farley 01/27/03 St. Lucie 02/03/03 Browns Ferry 02/18/03 Brunswick 03/10/03 Summer 03/31/03 Turkey Point 04/07/03 Harris 04/14/03 Crystal River 05/12/03 Hatch 05/19/03 Robinson 06/16/03 Vogtle 06/23/03 Sequoyah 07/14/03 Watts Bar 08/04/03 McGuire 09/08/03 North Anna 09/15/03 Oconee Enclosure