Inspection of Security Interim Compensatory Measures
ML030100334
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 12/31/2002
From: Boland A
Division of Reactor Safety II
To: Stall J
Florida Power & Light Co
References
Download: ML030100334 (5)


Text

December 31, 2002 Florida Power and Light Company ATTN: Mr. J. A. Stall, Senior Vice President Nuclear and Chief Nuclear Officer P. O. Box 14000 Juno Beach, FL 33408-0420

SUBJECT:

INSPECTION OF SECURITY INTERIM COMPENSATORY MEASURES

Dear Mr. Stall:

On August 26, 2002, the NRC staff completed its mid-cycle plant performance assessment of the St. Lucie facility and provided you with an inspection plan detailing the inspections scheduled through September 30, 2003. At that time, you were advised that the NRC was in the process of finalizing a Temporary Instruction (TI) that would be used to review implementation of the Security Interim Compensatory Measures (ICMs) required by the Agencys Order issued on February 25, 2002, and you would be informed of the schedule for the TI inspection at a later date.

On September 13, 2002, TI 2515/148, Revision 1, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures, was issued. Subsequently, we conducted a pre-inspection audit utilizing Appendix A of the TI to obtain preliminary information on your implementation of the ICMs. With the completion of the audits at the Region II sites, we have developed an inspection schedule to complete the remaining portion of the TI, Appendices B and C, which will fully examine the details of implementation of the ICMs in the areas of security, operations, emergency planning, and information technology. The schedule for these inspections at Region II sites is enclosed. As your inspection is scheduled in January 2003, we have already been in contact with your staff to discuss the inspection conduct and logistics. In addition, the TI is being conducted in lieu of the security baseline inspections in the schedule enclosed with our August 26, 2002 letter; however, additional inspections may be scheduled later in calendar year 2003.

If you have any questions regarding the conduct or schedule of TI 2515/148 inspections, please contact me at 404-562-4653.

Sincerely,

/RA/

Anne T. Boland, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-335, 50-389 License Nos. DPR-67, NPF-16

Enclosure:

TI Inspection Schedule

FP&L 2 cc w/encl: J. Kammel D. E. Jernigan Radiological Emergency Site Vice President Planning Administrator St. Lucie Nuclear Plant Department of Public Safety Florida Power & Light Company Electronic Mail Distribution Electronic Mail Distribution Douglas Anderson R. E. Rose County Administrator Plant General Manager St. Lucie County St. Lucie Nuclear Plant 2300 Virginia Avenue Electronic Mail Distribution Ft. Pierce, FL 34982 Kelly J. Korth Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Don Mothena, Manager Nuclear Plant Support Services Florida Power & Light Company Electronic Mail Distribution Mark Dryden Administrative Support & Special Projects Florida Power & Light Company Electronic Mail Distribution Rajiv S. Kundalkar Vice President - Nuclear Engineering Florida Power & Light Company Electronic Mail Distribution M. S. Ross, Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Bureau of Radiation Control Department of Health Electronic Mail Distribution Craig Fugate, Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution

FP&L 3 Distribution w/encl:

B. Moroney, NRR C. Evans (Part 72 Only)

RIDSNRRDIPMLIPB PUBLIC OFFICE RII RII SIGNATURE ATB KDL NAME A Boland L Wert DATE 12/31/02 12/31/02 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC DOCUMENT YES NO OFFICIAL RECORD COPY DOCUMENT NAME: C:\ORPCheckout\FileNET\ML030100334.wpd

TI 2515/148 INSPECTION SCHEDULE Date (Week of) Site Completed Catawba 01/06/03 Surry 01/13/03 Farley 01/27/03 St. Lucie 02/03/03 Browns Ferry 02/18/03 Brunswick 03/10/03 Summer 03/31/03 Turkey Point 04/07/03 Harris 04/14/03 Crystal River 05/12/03 Hatch 05/19/03 Robinson 06/16/03 Vogtle 06/23/03 Sequoyah 07/14/03 Watts Bar 08/04/03 McGuire 09/08/03 North Anna 09/15/03 Oconee