NMC Monticello Nuclear Generating Plant Committed to Nuclear Excellence Operated by Nuclear Management Company, LLC M2002121 December 6, 2002 10 CFR Part 50 Section 50.55a(g)
US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Request For Review and Approval of Relief Requests Associated with Fourth 10-Year Interval Inservice Inspection Examination Plan Submittal Pursuant to the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code Section Xl, and 10 CFR 50.55a(g),,attached is our document entitled "lnservice Inspe6tion Examination Plan, Fourth Interval - Revision 0, March 9, 2003 through May 31, 2012." The Inervice Inspection (ISI) Examination Plan meets the requirements of 10 CFR 50.55a(g)(4)(ii) in that 12 months prior to the fourth interval start date of March 9, 2003, the plan complies with the 1995 Edition, 1996 Addenda of ASME Boiler and Pressure Vessel Code,Section XI.
Relief Requests are identified in Section 1.5 of the enclosed plan. Previously approved Relief Requests have been renumbered. Two Relief Requests (Nos. 1 and 2) have previously been approved through the Fourth 10-Year Interval and do not require further NRC approval. Other Relief Requests (Nos. 3, 4 and 5) were previously approved for or during the Third 10-Year Interval. They are re-submitted for approval for the Fourth 10 Year Interval. Finally, Relief Request No. 6 is a first time submittal based on ASME Section Xl, Appendix VIII, Supplement 4 - Annual Training Requirements for Ultrasonic Nondestructive Examination Personnel.
This letter contains the following new NRC commitment:
Relief Request #5 - Leakage at Control Rod Drive Housing Connections, contains a commitment to revise applicable proceddres to perform a VT-1 exam in lieu of a VT-3 exam specified by IWA-5250(a)(2) on all CRD bolting that will be reused when the GE acceptance criteria has been exceeded ahd disassembly is required.
This letter does not modify any prior NRC commitments.
2807 West County Road 75
- Monticello, Minnesota 55362-9637 Telephone: 763 295.5151
- Fax. 763.295.1454
USNRC Nuclear Management Company, LLC Page 2 Our letter of May 30, 2002, entitled "Notification of Extension of 3 rd Ten-year Inservice Testing and Inspection Intervals," informed NRC of our intention to extend the third ten year ISI interval through March 8, 2Q03. Thus, our fourth ten-year interval is currently scheduled for the period of March 9, 2002 through May 31, 2012. As discussed with NRC Project Manager John Lamb on December 2, 2002, we are in the process of reviewing implementation of the Fourth 10-Year Interval plan. Based on the results of our review, we will contact our NRC Project Manager to discuss NRC review schedules.
If you have any questions regarding this letter, please contact John Fields, Senior Licensing Engineer, at 763-295-1663.
Jeffrey 4S.orb Site Vice President Monticello Nuclear Generating Plant
Enclosure:
Inservice Inspection Examination Plan, Fourth Interval - Revision 0, March 9, 2003 through May 31, 2012 cc:
Regional Administrator-Ill, NRC NRR Project Manager, NRC Sr. NRC Resident Inspector, NRC State of Minnesota Boiler Inspector Hartford Insurance J, Silberg (w/o Enclosure)
I ____ I _-_ýR_
TRANSMITTAL MANIFEST NUCLEAR MANAGEMENT COMPANY, LLC NUCLEAR LICENSING DEPARTMENT MONTICELLO NUCLEAR GENERATING PLANT Request for Review and Approval of Relief Requests Associated with Fourth 10-Year Interval Inservice Inspection Examination Plan Submittal Correspondence Date: December 6, 2002 Manifest Date: December 16, 2002 Monticello Site Distribution Special Instructions:
Melissa Miszczak....... USAR File................. Yes_
No x Ron Baumer......
NRC Commitment..... Yes No x Linda Christianson..... Monti OC Sec........... Yes__ No_x_ - 12, No dist to OC members below if YES Darla Minkkinen......... Monti OSRC Sec....... Yes__ No_x_ - 5 Monticello Site Distribution:
-J S Forbes, Site VP, OSRC S R Radebaugh, OC P C AIb&res, Mgr Program Engr G C Park G B Bregg, Mgr Nuclear Oversight R A Deopere W P Cheever, Training Mgr
- Kurt Suleski, ANII - Monti SAB2 D P Fadel, Dir Site Engr
- NRC Resident Inspector J C Grubb, Ops Mgr, OC
- Monti Document Control File J D Purkis, Plant Mgr, OC
Xcel Energy Distribution:
C R Bomberger, RS-10 External Distribution:
- Doc Control Desk, NRC
- Joel Amato, Minn State Boiler Inspector Regional Admin-Ill, NRC J E Silberg
- Darl Hood, NRR-PM, NRC
- Hartford Insurance Copy of Inservice Inspection Plan not included unless marked with **
12/09/2002,
M-10d