Exelknm.

Exelon Nuclear wwwexeloncorpcoM Nuclear 20o Exelon Way Kennett Square, PA19348 December 16, 2002 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Limerick Generating Station, Unit 1 Facility Operating License No. NPF-39 NRC Docket No. 50-352

Subject:

Completion of Limerick Unit 1 Spent Fuel Pool Rerack Modification

Reference:

Letter from G. A. Hunger, Jr. (PECO Energy) to USNRC dated January 10, 1995

Dear Sir/Madam:

By letter dated November 29, 1994, the NRC issued Amendment Nos. 82 and 43 to Facility Operating License Nos. NPF-39 and NPF-85 for Limerick Generating Station (LGS), Units 1 and 2, respectively. These amendments revised the LGS, Units 1 and 2, Technical Specifications (TS) to increase the spent fuel storage capacity in each of the spent fuel pools at LGS to 4117 fuel assemblies, in order to facilitate installation of new maximum density spent fuel storage racks. The NRC requested that it be notified when these amendments have been implemented at LGS, Units 1 and 2.

Therefore, in response to the NRC's request, this letter is being submitted to inform the NRC that the modification work associated with installing the new maximum density spent fuel storage racks in the LGS Unit 1 spent fuel pool has been completed. The first fuel assemblies were placed in the new racks on June 20, 2002. The last of the new storage racks was installed on August 8, 2002.

The NRC was previously notified of completion of the LGS Unit 2 work via the Reference letter.

If you have any questions or require additional information, please do not hesitate to contact us.

"Sincerely, Michael P. Gallagher Director, Licensing and Regulatory Affairs Mid-Atlantic Regional Operating Group cc: