Jeffrey T. Gasser Vice President Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205 992.7721 Fax 205 992 0403 SOUTHERN A COMPANY Energy to Serve Your World December 17, 2002 LCV-1593-M Docket Nos.
50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:
VOGTLE ELECTRIC GENERATING PLANT CORRECTED MONTHLY OPERATING REPORT - SEPTEMBER 2002 Enclosed is a corrected monthly operating report for Vogtle Electric Generating Plant (VEGP) Unit 2 for September 2002. This revised report corrects the value of Net Electrical Energy Generated by Unit 2 for September 2002.
Sincerel Jeffrey T. GasserK3 JTG/NJS
Enclosures:
VEGP Unit 2 Monthly Operating Report - September 2002 xc:
Southern Nuclear Operating Company Mr. G. R. Frederick Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle
OPERATING DATA REPORT Docket No:
Unit Name*
Date.
Completed By:
Telephone 50-425 VEGP UNIT 2 October 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status
- 1. Reporting Period 2 Design Electrical Rating (Net MWe) 3 Maximum Dependable Capacity (Net MWe)
- 4. Number Of Hours Reactor Was Critical 5 Hours Generator On Line 6 Unit Reserve Shutdown Hours:
- 7. Net Electrical Energy Generated (MWHe)"
September 2002 1169 1149 This Month 720 0 720.0 0.0 827,163 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date (YYMMDD)
Tag No Event Descnption N/A N/A N/A E2-1 Year-To-Date 6551.0 6551.0 00 7,664,867 Cumulative 107,6048 106,791.7 00 120,457,333
UNIT SHUTDOWNS Reporting Period:
Docket No:
Unit Name Date:
Completed By:
Telephone 50-425 VEGP UNIT 2 October 1, 2002 Andrew R Cato (706) 826-3823 September 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No Date (YYMMDD)
S Scheduled (Hours)
Reason (1)
Down (2)
Comments NIA N/A N/A N/A N/A N/A N/A (1) REASON (2) METHOD A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual 4 Continuation B - Maintenance or Test F - Administrative 2 Manual Tnp/Scram 5 Other C - Refueling G - Operational Error (Explain) 3 Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSE/CORRECTIVE ACTIONICOMMENTS:
EVENT*
CAUSE*
CORRECTIVE ACTION CRITICAL PATH WAS, NARRATIVE REPORT September 01 00.00 Unit 2 at 100% power with no significant operating problems.
September 21 11:00 Unit began planned coastdown in preparation for the refueling outage.
September 30 23 59 Unit 2 at 95% power in coastdown with no significant operating problems.
E2-2
OPERATING DATA REPORT Docket No.,
Unit Name:
Date.
Completed By:
Telephone:
50-425 VEGP UNIT 2 October 1, 2002 Andrew R Cato (706) 826-3823 Operating Status Reporting Period:
Design Electrical Rating (Net MWe):
Maximum Dependable Capacity (Net MWe):
Number Of Hours Reactor Was Critical.
Hours Generator On Line:
Unit Reserve Shutdown Hours:
Net Electrical Energy Generated (MWHe):
September 2002 1169 1149 This Month Year-To-Date Cumulative 720.0 6551.0 107,6048 720.0 6551.0 106,791.7 S7,67663 04, 7
1,45 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date (YYMMDD)
NIA Tag No.
4 N/A Event Descnption N/A f
E2-1
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
CR Number: 2002003519 Vogtle.CONDITION REPORT Unit: 2 Report date: 12/1612002 Discovery Date & Time:
12110/2002 15:30 Event Date& Time: Unknown Discovered By: Andy Cato DepartmentlTeam: Engr-NSAC Phone: 3823 Originated By:
ARCATO Description of Condition:
NRC Monthly Operating Report for September 2002 was submitted to the NRC with some incorrect data. A revision is being submitted to document that the value of Net Electrical Energy Generated for Unit 2 in September was reported incorrectly. The value for Net Electrical Energy Generated for Unit 2 should have been increased by 100 MWHe for the Monthly, Year-To-Date, and Cumulative values Equipment Numbers and Reference Documents (tags, procedures, dravAngs,WOs, etc.):
Building: Admin Bldg Local What Is affected by the condition?
This error has no impact on the plant.
Howwas condition discovered?
During a review of the December 2002 NRC Monthly Operating Report tion:
N/A Plant Mode/Condition: Hot Standby Mode 3 Immediate Notification Required?
NO Reported date and time: Not Applicable LCO Required? NO Initial Review Power: 0 If yes, lh, 4h, 8h, 24h:
N/A hour(s)
Type of LCO: N/A Mode Restraint: N/A LCO #:
N/A WORequired?
No WO#:
Applicable TS Section:
None Compensatory Actions:
Correct Numbers Reported Approval: T. A BUSSIERE N/A Date & Time:
12/1012002 17:32 Regulatory Review Date Received by NSAC: 12/12/2002 Is this condition reportable?
NO Severity Level: 4 Explanation:
Report Number:
N/A PRB Number:
n/a Anomalies associated with incorrectly reporting the Net Electrical Energy Generated for Unit 2 are not in themselves reportable per 10 CFR.
However, a revised report will correct the discrepancy Tech. Spec compliance is not inpacted reIse 00/01cniinRpr ae 1o CA p
Vogtle CO*NDITION REPORT CR Number: 2002003519 Unit: 2 Report date: 12/16/2002 DCCARD2 rpt revised 10103/2001 Condition Report: Page I of 3
CR Number: 2002003519 Vogtle CONDITION REPORT Unit: 2 Report date: 12/16/2002 NSAC Reviewer: Patrick M. Conley/ tew Date:
12/12/2002 NSAC Supervisor. M.Sheibani Date:
12/1212002 Maintenance Rule Scope?
NO Functional Failure? NO Is this an MPFF? NO Maintenance Rule Justification:
Data reported in the NRC monthly operating report is not included in the Maintenance Rule Scope.
Maintenance Rule Justification By: Josh Olson Date: 12/13/2002 Disposition:
Obtain Valid Documentation:
An investigation was performed by the performance engineering group to ensure that the correct values for generation were transcribed from the Electrical Logs to the Generation Log spreadsheet. All of the data is correct for September 2002 as reported in the Electrical Logs.
A root cause of the discrepancy in Megawatt reporting Is not known, however the most probable cause is due to an individual modifying the Generation Log spreadsheet after the September 2002 NRC monthly operating report was submitted.
As a corrective action for this deficiency, additional security has been added to the Generation Log spreadsheet to track all changes that are made to the speadsheet and document the user, time, and what changes are made each time the spreadsheet is modified Additionally a revised NRC monthly operating report has been submitted for September 2002.
Prepared By:
Josh Olson tsh Approval:
W. L. Burmeister Final NSAC Review:.
Date: 12/13/2002 Date: 12/13/2002 Date:
revised 10/0312001 Condition Report Page 2 of 3 DCCARD2 rpt DCCARD2 rt revised 10,'03/2001 Condition Report: Page 2 of 3
CR Number: 2002003519 Vogtle CONDITION REPORT Unit: 2 Report date: 12116/2002 Comments:
12-11-2002 / Assign to ESD, per request from ARC. TEW DCCARD2 rpt revised 10/03/2001 Condition Report Page 3 of 3 Vogtle 'CONDITION REPORT CR Number: 2002003519 Unit: 2 Report date: 12/16/2002 Condition Report: Page 3 of 3 revised 10/03/2001