Letter Sequence Other |
---|
|
|
MONTHYEARML0221306332002-08-13013 August 2002 Request for Additional Information Related to License Amendment Request Project stage: RAI ML0226806032002-09-16016 September 2002 Response to Request for Additional Information Regarding License Amendment Request for Revised Pressure and Temperature Limit Curves Project stage: Response to RAI ML0236000952003-02-12012 February 2003 Environmental Assessment, Exemption to 10 CFR Part 50, Section 50.60 (a) and Appendix G Project stage: Other ML0301506662003-02-21021 February 2003 Exemption, Use of ASME Code Case N-640 Project stage: Other ML0305800502003-02-24024 February 2003 Tech Spec Pages for License Amendment 133 Revision to Pressure-Temperature Curves Project stage: Approval ML0302101252003-02-24024 February 2003 License Amendment 133 Revision to Pressure-Temperature Curves. TAC No. MB4976 Project stage: Approval 2003-02-12
[Table View] |
|
---|
Category:Environmental Assessment
MONTHYEARML21055A7352021-03-25025 March 2021 Final Ea+Fonsi ML0935214762010-01-29029 January 2010 Letter Transmitting Environmental Assessment and No Finding of No Significant Impact ML0932209252010-01-11011 January 2010 Letter - Final Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate ML0932209642010-01-11011 January 2010 Final Environmental Assessment NRC-2009-0399, Monticello Nuclear Generating Plant - Final Environmental Assessment2010-01-11011 January 2010 Monticello Nuclear Generating Plant - Final Environmental Assessment L-MT-10-003, Mellla+ Risk Assessment, Attachment 6 of L-MT-10-0032009-11-30030 November 2009 Mellla+ Risk Assessment, Attachment 6 of L-MT-10-003 ML0810101942008-03-31031 March 2008 Monticello, MNGP Extended Power Uprate Environmental Assessment ML0624105152006-11-29029 November 2006 Environment Assessment for Proposed Exemption from Appendix J of 10 CFR 50 ML0610705872006-05-25025 May 2006 Environmental Assessment and Finding of No Significant Impact for the Proposed Conversion to the Improved Technical Specifications ML0424500212004-10-13013 October 2004 Environmental Assessment Intake Structure Pump Room Appendix R Exemption Request ML0418402872004-07-22022 July 2004 Environmental Assessment, Authorize Automatic Fire Suppression System Appendix R Exemption Request for Torus Compartment ML0329703902004-01-0606 January 2004 Environmental Assessment, Revise the Calculation of Long-Term Containment ML0236000952003-02-12012 February 2003 Environmental Assessment, Exemption to 10 CFR Part 50, Section 50.60 (a) and Appendix G 2021-03-25
[Table view] Category:Federal Register Notice
MONTHYEARML23047A1132023-03-0707 March 2023 Noi FRN ML23047A1742023-02-28028 February 2023 SLRA Acceptance FRN ML23010A0062023-01-26026 January 2023 SLRA Availability FRN ML21251A3692021-09-21021 September 2021 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving Proposed No Significant Hazards Considerations and Containing Sensitive Unclassified Non-Safeguards Information and Order Imposing Procedures: Octobe ML18289A7412019-02-14014 February 2019 FRN Notice of Issuance of Exemption Appendix R for Structural Steel NRC-2019-0059, FRN Notice of Issuance of Exemption Appendix R for Structural Steel2019-02-14014 February 2019 FRN Notice of Issuance of Exemption Appendix R for Structural Steel NRC-2018-0287, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/20192019-01-0202 January 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/2019 ML18351A0022019-01-0202 January 2019 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: 01/02/2019 ML18248A1212018-09-13013 September 2018 Federal Register Notice: Exemption; Issuance - Xcel Energy, Monticello Nuclear Generating Plant Independent Spent Fuel Storage Installation NRC-2018-0207, Federal Register Notice: Exemption; Issuance - Xcel Energy, Monticello Nuclear Generating Plant Independent Spent Fuel Storage Installation2018-09-13013 September 2018 Federal Register Notice: Exemption; Issuance - Xcel Energy, Monticello Nuclear Generating Plant Independent Spent Fuel Storage Installation NRC-2018-0096, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 20182018-05-14014 May 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 ML18127B7232018-05-14014 May 2018 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 22, 2018 ML16271A0922016-09-28028 September 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: October 11, 2016 NRC-2016-0161, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 20162016-08-0303 August 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 ML16215A2272016-08-0303 August 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: August 16, 2016 ML16159A2272016-06-0808 June 2016 Enclosufederal Register Notice-Notice of Availability of Exemption for Xcel Energy, Monticello Nuclear Generating Plant, Independent Spent Fuel Storage Installation NRC-2016-0115, Enclosufederal Register Notice-Notice of Availability of Exemption for Xcel Energy, Monticello Nuclear Generating Plant, Independent Spent Fuel Storage Installation2016-06-0808 June 2016 Enclosufederal Register Notice-Notice of Availability of Exemption for Xcel Energy, Monticello Nuclear Generating Plant, Independent Spent Fuel Storage Installation ML16145A2252016-06-0707 June 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: June 7, 2016 NRC-2016-0107, Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: June 7, 20162016-06-0707 June 2016 Biweekly Federal Register Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: June 7, 2016 ML15351A5122015-12-21021 December 2015 EA-14-193; Federal Register Notice and Confirmatory Order Related to NRC Reports No. 05000263/2015008; 07200058/2014001 and OI Report 3-2014-004; Monticello Nuclear Generating Plant ML15152A1122015-06-10010 June 2015 Letter, Withdrawal of an Amendment Request Regarding a Revision to Technical Specification Surveillance Requirement 3.5.1.3.b Associated with Alternate Nitrogen System Pressure ML13018A2392015-04-0808 April 2015 G20110171 - Letter to Petitioner Saporito on Proposed Director'S Decision Regarding 2.206 Petition Dated: March 12, 2011 ML15022A6532015-01-26026 January 2015 Biweekly Sholly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 3, 2015 ML14335A6482015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units NRC-2015-0009, G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units2015-01-15015 January 2015 G20110262 - FRN - Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units ML14335A6302015-01-15015 January 2015 G20110262 - Final Response to Paul Gunter and Kevin Kamps Letter 2.206 - Immediately Suspend the Operating License of General Electric Boiling Water Reactors Mark I Units ML14303A3812014-10-31031 October 2014 Biweekly Sholly FRN - Application and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: November 12, 2014 ML14177A6452014-06-27027 June 2014 Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations ML14037A4142014-02-10010 February 2014 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 2014 NRC-2014-0028, Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 20142014-02-10010 February 2014 Biweekly Notice - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: February 18, 2014 ML14013A3202014-01-27027 January 2014 Federal Register Notice Regarding the 611th ACRS Meeting, February 5-7, 2014 ML13204A3182013-11-13013 November 2013 Federal Register Notice Regarding the ACRS Power Uprates Subcommittee Meeting, December 3, 2013 ML13225A5572013-08-12012 August 2013 Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit ML13228A3992013-08-12012 August 2013 Letter to Holders of Independent Spent Fuel Storage Installation (ISFSI) Licenses Re Rescission of Certain Security Orders Concerning Spent Nuclear Fuel in Transit - Rin 3150-AI64 (NRC-2009-0163) EA-02-109 ML12056A0432012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark II Containments NRC-2012-0067, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML12056A0442012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Effective Immediately) - to All Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status NRC-2012-0069, Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments2012-03-12012 March 2012 Order Modifying Licenses with Regard to Reliable Hardened Containment Vents - to All Operating Boiling Water Reactor Licensees with Mark I and Mark Ii Containments NRC-2011-0187, Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/20112011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 ML1122302752011-08-11011 August 2011 Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 8/23/2011 NRC-2010-0045, Exemption Re. 10 CFR 73.552010-02-24024 February 2010 Exemption Re. 10 CFR 73.55 ML0934413302010-02-24024 February 2010 Exemption Re. 10 CFR 73.55 ML0934416222010-02-24024 February 2010 Letter Transmitting Exemption to a Scheduler Requirement of 10 CFR 73.55 ML0935205442010-01-29029 January 2010 Environmental Assessment and Finding of No Significant Impact NRC-2009-0399, Monticello Nuclear Generating Plant - Final Environmental Assessment2010-01-11011 January 2010 Monticello Nuclear Generating Plant - Final Environmental Assessment ML0932209642010-01-11011 January 2010 Final Environmental Assessment ML0932209252010-01-11011 January 2010 Letter - Final Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate ML0920507092009-08-28028 August 2009 Draft Environmental Assessment for Monticello'S Proposed Extended Power Uprate Amendment ML0920804422009-08-28028 August 2009 Letter Transmitting the Draft Environmental Assessment for the Proposed Extended Power Uprate Amendment ML0911306172009-04-24024 April 2009 Biweekly Notice, Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations 2023-03-07
[Table view] Category:Finding of No Significant Impact
MONTHYEARML21055A7352021-03-25025 March 2021 Final Ea+Fonsi ML0935214762010-01-29029 January 2010 Letter Transmitting Environmental Assessment and No Finding of No Significant Impact ML0932209252010-01-11011 January 2010 Letter - Final Environmental Assessment and Finding of No Significant Impact Related to the Proposed Extended Power Uprate ML0932209642010-01-11011 January 2010 Final Environmental Assessment NRC-2009-0399, Monticello Nuclear Generating Plant - Final Environmental Assessment2010-01-11011 January 2010 Monticello Nuclear Generating Plant - Final Environmental Assessment ML0920804422009-08-28028 August 2009 Letter Transmitting the Draft Environmental Assessment for the Proposed Extended Power Uprate Amendment ML0424500212004-10-13013 October 2004 Environmental Assessment Intake Structure Pump Room Appendix R Exemption Request ML0418402872004-07-22022 July 2004 Environmental Assessment, Authorize Automatic Fire Suppression System Appendix R Exemption Request for Torus Compartment ML0329703902004-01-0606 January 2004 Environmental Assessment, Revise the Calculation of Long-Term Containment ML0236000952003-02-12012 February 2003 Environmental Assessment, Exemption to 10 CFR Part 50, Section 50.60 (a) and Appendix G 2021-03-25
[Table view] Category:Letter
MONTHYEARML24025A9362024-01-31031 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0055 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000263/20230042024-01-31031 January 2024 Integrated Inspection Report 05000263/2023004 ML24024A0722024-01-24024 January 2024 Independent Spent Fuel Storage Installation, Onticello, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000263/20244012024-01-22022 January 2024 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000263/2024401 L-MT-23-054, Subsequent License Renewal Application Supplement 82024-01-11011 January 2024 Subsequent License Renewal Application Supplement 8 L-MT-23-047, License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data2023-12-29029 December 2023 License Amendment Request: Revision to the MNGP Pressure Temperature Limits Report to Change the Neutron Fluence Methodology and Incorporate New Surveillance Capsule Data L-MT-23-056, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 22023-12-18018 December 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 Part 2 ML23349A0572023-12-15015 December 2023 and Independent Spent Fuel Storage Installation, Revision to Correspondence Service List for Northern States Power - Minnesota IR 05000263/20234022023-12-13013 December 2023 Security Baseline Inspection Report 05000263/2023402 L-MT-23-042, 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.462023-12-11011 December 2023 2023 Annual Report of Changes in Emergency Core Cooling System Evaluation Models Pursuant to 10 CFR 50.46 L-MT-23-052, Subsequent License Renewal Application Supplement 72023-11-30030 November 2023 Subsequent License Renewal Application Supplement 7 L-MT-23-051, Update to the Technical Specification Bases2023-11-28028 November 2023 Update to the Technical Specification Bases L-MT-23-049, Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 12023-11-21021 November 2023 Subsequent License Renewal Application Response to Request for Additional Information and Request for Confirmation of Information - Set 1 ML23319A3182023-11-15015 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000263/20230032023-11-13013 November 2023 Integrated Inspection Report 05000263/2023003 and 07200058/2023001 L-MT-23-043, 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-092023-11-13013 November 2023 10 CFR 50.55a(z)(1) Request Regarding OMN-17, Revision 1. VR-09 L-MT-23-038, License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.62023-11-10010 November 2023 License Amendment Request to Revise Monticello Technical Specification Surveillance Requirement 3.8.6.6 L-MT-23-046, Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 12023-11-0909 November 2023 Subsequent License Renewal Application Response to Request for Additional Information Round 2 - Set 1 ML23291A1102023-10-23023 October 2023 Environmental Audit Summary and RCIs and RAIs ML23285A3062023-10-12012 October 2023 Implementation of the Fleet Standard Emergency Plan for the Monticello Nuclear Generating Plant and the Prairie Island Nuclear Generating Plant L-MT-23-041, Subsequent License Renewal Application Response to Request for Confirmation of Information Set 22023-10-0303 October 2023 Subsequent License Renewal Application Response to Request for Confirmation of Information Set 2 L-MT-23-037, Subsequent License Renewal Application Response to Request for Additional Information Set 32023-09-22022 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 3 ML23262B0372023-09-19019 September 2023 Response to NRC Request for Additional Information Regarding the 2023 Monticello and Prairie Island Plant Decommissioning Funding Status Reports ML23248A2092023-09-18018 September 2023 Proposed Alternative VR-11 to the Requirements of the ASME OM Code Associated with Periodic Verification Testing of MO-2397, Reactor Water Cleanup Inboard Isolation Valve ML23256A1682023-09-13013 September 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Voluntary Security Clearance Program 2023 Insider Threat Program Self-Inspection IR 05000263/20230102023-09-0707 September 2023 Commercial Grade Dedication Inspection Report 05000263/2023010 L-MT-23-036, Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 62023-09-0505 September 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 2 and Supplement 6 ML23214A2412023-08-31031 August 2023 Letter: Aging Management Audit - Monticello Unit 1 - Subsequent License Renewal Application IR 05000263/20230052023-08-30030 August 2023 Updated Inspection Plan for Monticello Nuclear Generating Plant (Report 05000263/2023005) L-MT-23-035, Subsequent License Renewal Application Supplement 52023-08-28028 August 2023 Subsequent License Renewal Application Supplement 5 ML23241A9732023-08-21021 August 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1, Subsequent License Renewal Application (Docket No. 50-263) L-MT-23-034, Subsequent License Renewal Application Response to Request for Additional Information Set 12023-08-15015 August 2023 Subsequent License Renewal Application Response to Request for Additional Information Set 1 ML23222A0122023-08-10010 August 2023 Independent Spent Fuel Storage Installation and Monticello Nuclear Generating Plant - Changes in Foreign Ownership, Control or Influence ML23215A1312023-08-0909 August 2023 License Renewal Regulatory Audit Regarding the Environmental Review of the Subsequent License Renewal Application IR 05000263/20230022023-08-0707 August 2023 Plantintegrated Inspection Report 05000263/2023002 L-MT-23-028, 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report2023-07-31031 July 2023 2023 Refueling Outage 90-Day Inservice Inspection (ISI) Summary Report L-MT-23-032, 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-112023-07-31031 July 2023 10 CFR 50.55a(z)(2) Request Regarding MO-2397, VR-11 ML23198A0412023-07-28028 July 2023 LRA Availability Letter ML23206A2342023-07-25025 July 2023 Independent Spent Fuel Storage Installation, and Monticello Nuclear Generating Plant, Changes in Foreign Ownership, Control or Influence ML23201A0352023-07-24024 July 2023 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23202A0032023-07-21021 July 2023 Independent Spent Fuel and Independent Spent Fuel Storage Installation, Monticello Nuclear Generating Plant, Submittal of Quality Assurance Topical Report (NSPM-1) L-MT-23-031, Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 12023-07-18018 July 2023 Subsequent License Renewal Application Supplement 4 and Responses to Request for Confirmation of Information - Set 1 ML23195A1732023-07-14014 July 2023 Revision of Standard Practice Procedures Plan IR 05000263/20235012023-07-13013 July 2023 Emergency Preparedness Inspection Report 05000263/2023501 2024-01-31
[Table view] |
Text
February 12, 2003 Mr. Jeffrey S. Forbes Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT, ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT FOR EXEMPTION TO 10 CFR PART 50, SECTION 50.60(a) AND APPENDIX G (TAC NOS. MB4976 AND MB5078)
Dear Mr. Forbes:
Enclosed is a copy of the Environmental Assessment and Finding of No Significant Impact related to your application for exemption and amendment dated April 22, 2002, as supplemented September 16, 2002. The proposed exemption is from the requirements of 10 CFR Part 50, Section 50.60(a) and Appendix G, and would allow the use of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Code Case N-640 as the basis for revised reactor vessel pressure and temperature limit curves.
The environmental assessment is being forwarded to the Office of the Federal Register for publication.
Sincerely,
/RA/
Darl S. Hood, Senior Project Manager, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation Docket No. 50-263
Enclosure:
Environmental Assessment cc w/encl: See next page
ML023600095 *No legal objection OFFICE PDIII-1/PM PDIII-1/LA RLEP/SC OGC/NLO* PDIII-1/SC NAME DHood RBouling JTappert AFernandez LRaghavan DATE 01/08/03 01/08/03 01/21/03 02/11/03 02/12/03 Monticello Nuclear Generating Plant cc:
J. E. Silberg, Esquire Commissioner Shaw, Pittman, Potts and Trowbridge Minnesota Department of Commerce 2300 N Street, N. W. 121 Seventh Place East Washington, DC 20037 Suite 200 St. Paul, MN 55101-2145 U.S. Nuclear Regulatory Commission Resident Inspectors Office Adonis A. Neblett 2807 W. County Road 75 Assistant Attorney General Monticello, MN 55362 Office of the Attorney General 445 Minnesota Street Site Licensing Manager Suite 900 Monticello Nuclear Generating Plant St. Paul, MN 55101-2127 Nuclear Management Company, LLC 2807 West County Road 75 Mr. Roy A. Anderson Monticello, MN 55362-9637 Executive Vice President and Chief Nuclear Officer Robert Nelson, President Nuclear Management Company, LLC Minnesota Environmental Control 700 First Street Citizens Association (MECCA) Hudson, WI 54016 1051 South McKnight Road St. Paul, MN 55119 Nuclear Asset Manager Xcel Energy, Inc.
Commissioner 414 Nicollet Mall Minnesota Pollution Control Agency Minneapolis, MN 55401 520 Lafayette Road St. Paul, MN 55155-4194 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 Commissioner Minnesota Department of Health 717 Delaware Street, S. E.
Minneapolis, MN 55440 Douglas M. Gruber, Auditor/Treasurer Wright County Government Center 10 NW Second Street Buffalo, MN 55313 March 2002
7590-01-P UNITED STATES NUCLEAR REGULATORY COMMISSION NUCLEAR MANAGEMENT COMPANY, LLC DOCKET NO. 50-263 MONTICELLO NUCLEAR GENERATING PLANT ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption from Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Section 50.60, "Acceptance criteria for fracture prevention measures for light-water nuclear power reactors for normal operation," and 10 CFR Part 50, Appendix G, "Fracture Toughness Requirements," for Facility Operating License No. DPR-22, issued to the Nuclear Management Company, LLC (the licensee), for operation of the Monticello Nuclear Generating Plant, located in Wright County, Minnesota. Therefore, as required by 10 CFR 51.21, the NRC is issuing this environmental assessment and finding of no significant impact.
ENVIRONMENTAL ASSESSMENT Identification of the Proposed Action:
The proposed action would exempt the licensee from the requirements of 10 CFR Part 50, Section 50.60(a) and Appendix G, which would allow the use of American Society of Mechanical Engineers Boiler and Pressure Vessel Code (ASME Code) Code Case N-640 as the basis for revised reactor vessel pressure and temperature (P/T) limit curves in the Monticello Technical Specifications (TSs).
The regulation at 10 CFR Part 50, Section 50.60(a), requires, in part, that except where an exemption is granted by the Commission, all light-water nuclear power reactors must meet the fracture toughness requirements for the reactor coolant pressure boundary set forth in Appendices G and H to 10 CFR Part 50. Appendix G to 10 CFR Part 50 requires that P/T limits be established for reactor pressure vessels (RPVs) during normal operating and hydrostatic or leak-rate testing conditions. Specifically, 10 CFR Part 50, Appendix G, states, The appropriate requirements on both the pressure-temperature limits and the minimum permissible temperature must be met for all conditions. Appendix G of 10 CFR Part 50 specifies that the requirements for these limits are the ASME Code,Section XI, Appendix G, limits.
ASME Code Case N-640 permits the use of alternate reference fracture toughness (i.e., use of KIC fracture toughness curve instead of KIA fracture toughness curve, where KIC and KIA are Reference Stress Intensity Factors, as defined in ASME Code,Section XI, Appendices A and G, respectively) for reactor vessel materials in determining the P/T limits.
Since the KIC fracture toughness curve shown in ASME Code,Section XI, Appendix A, Figure A-2200-1, provides greater allowable fracture toughness than the corresponding KIA fracture toughness curve of ASME Code,Section XI, Appendix G, Figure G-2210-1, using ASME Code Case N-640 to establish the P/T limits would be less conservative than the methodology currently endorsed by 10 CFR Part 50, Appendix G. Therefore, an exemption to apply ASME Code Case N-640 is required.
The proposed action is in accordance with the licensees application dated April 22, 2002, as supplemented by letter dated September 16, 2002.
The Need for the Proposed Action:
The proposed exemption is needed to allow the licensee to implement ASME Code Case N-640 in order to revise the method used to determine the P/T limits because continued use of the present curves unnecessarily restricts the P/T operating window. Since the
P/T operating window is defined by the P/T operating and test limit curves developed in accordance with the ASME Code,Section XI, Appendix G, procedure, continued operation of Monticello with these P/T curves without the relief provided by ASME Code Case N-640 would unnecessarily require the RPV to maintain a temperature exceeding 212 EF in a limited operating window during the pressure test. Consequently, steam vapor hazards would continue to be one of the safety concerns for personnel conducting inspections in primary containment.
Implementation of the proposed P/T curves, as allowed by ASME Code Case N-640, would not significantly reduce the margin of safety and would eliminate steam vapor hazards by allowing inspections in primary containment to be conducted at a lower coolant temperature.
Environmental Impacts of the Proposed Action:
The NRC has completed its evaluation of the proposed action and concludes that there are no significant adverse environmental impacts associated with the proposed action.
The proposed action will not significantly increase the probability or consequences of accidents, no changes are being made in the types of effluents that may be released off site, and there is no significant increase in occupational or public radiation exposure. Therefore, there are no significant radiological environmental impacts associated with the proposed action.
With regard to potential nonradiological impacts, the proposed action does not have a potential to affect any historic sites. It does not affect nonradiological plant effluents and has no other environmental impact. Therefore, there are no significant nonradiological environmental impacts associated with the proposed action.
Accordingly, the NRC concludes that there are no significant environmental impacts associated with the proposed action.
Environmental Impacts of the Alternatives to the Proposed Action:
As an alternative to the proposed action, the NRC staff considered denial of the proposed action (i.e., the no-action alternative). Denial of the application would result in no change in current environmental impacts. The environmental impacts of the proposed action and the alternative action are similar.
Alternative Use of Resources:
The action does not involve the use of any different resource than those previously considered in the Final Environmental Statement for Monticello.
Agencies and Persons Consulted:
On February 11, 2003, the staff consulted with the Minnesota State official, Nancy Campbell of the Department of Commerce, regarding the environmental impact of the proposed action. The State official had no comments.
FINDING OF NO SIGNIFICANT IMPACT On the basis of the environmental assessment, the NRC concludes that the proposed action will not have a significant effect on the quality of the human environment. Accordingly, the NRC has determined not to prepare an environmental impact statement for the proposed action.
For further details with respect to the proposed action, see the licensees application dated April 22, 2002, as supplemented by letter dated September 16, 2002. Documents may be examined, and/or copied for a fee, at the NRCs Public Document Room (PDR), located at One White Flint North, 11555 Rockville Pike (first floor), Rockville, Maryland. Publicly available records will be accessible electronically from the Agencywide Documents Access and Management System (ADAMS) Public Electronic Reading Room on the Internet at the NRC Web site, http://www.nrc.gov/reading-rm/adams.html. Persons who do not have access to
ADAMS or who encounter problems in accessing the documents located in ADAMS, should contact the NRC PDR Reference staff by telephone at 1-800-397-4209 or 301-415-4737, or by e-mail to pdr@nrc.gov.
Dated at Rockville, Maryland, this 12th day of February 2003.
FOR THE NUCLEAR REGULATORY COMMISSION
/RA/
L. Raghavan, Chief, Section 1 Project Directorate III Division of Licensing Project Management Office of Nuclear Reactor Regulation