MONTHYEARML22041B1072022-02-10010 February 2022 LTR-22-0033-1 Oedo Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML20177A4932020-06-25025 June 2020 Enclosure a - Redacted Owners, Officers, Directors, and Executive Personnel Forms for Energy Harbor Corp., Energy Harbor Nuclear Corp., and Energy Harbor Nuclear Generation LLC ML20008D2232020-01-0808 January 2020 NRC Region I Twitter Feeds 10-1 to 12-31-2019 L-16-092, Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 62016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 4 of 6 ML16132A3962016-04-22022 April 2016 Information Pertaining to Foreign Ownership, Control, or Influence. Part 5 of 6 ML16132A3942016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 3 of 6 ML16132A3932016-04-22022 April 2016 Davis-Besse, and Perry - Information Pertaining to Foreign Ownership, Control, or Influence. Part 2 of 6 ML15231A3642015-05-27027 May 2015 FOIA/PA-2014-0204 - Resp 1 - Final, Group a ML12167A0622012-07-16016 July 2012 Enclosure - Davis-Besse 17RFO SG Tube Inspection Tables ML12170B1042012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #4 Scenario ML12170B1052012-06-18018 June 2012 0772 - G105 - Conducting Inspections - Workshop #5 Scenario ML12200A1832012-06-12012 June 2012 Unit Licensing Basis Seismic Ground Motion Concern ML12056A0522012-03-12012 March 2012 Enclosure 6 - List of Power Reactor Licensees and Holders of Construction Permits in Active or Deferred Status ML11348A0432011-12-12012 December 2011 Email -- Davis-Besse SB Crack Rc Investigation RFI ML12213A3532011-11-15015 November 2011 Shield Building Laminar Cracking ML12213A3512011-11-10010 November 2011 Containment Shield Building Issue ML12200A1952011-11-0707 November 2011 Shield Building Issue NRC Technical Reviewer Focus Questions ML11301A2392011-10-31031 October 2011 Reference: Wind Resource Estimates Developed by Aws Truepower LLC for Windnavigator ML11301A2352011-10-31031 October 2011 References: Concentrating Solar Resources of the United States ML1126601882011-09-23023 September 2011 NRC 2011 Davis-Besse L-11-165, Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30)2011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS) References. (Tab a 8 Through T 30) ML11193A1332011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 1 Through Tab H 16) ML11193A1042011-05-27027 May 2011 Enclosure C - Binder 2 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab H 17 to Tab C 2) ML11227A1962011-05-27027 May 2011 Enclosure C - Binder 1 of 2, Davis-Besse Nuclear Power Station, Unit No. 1 (Dbnps) References. (Tab Am 1 Through a 7) ML11109A0842011-04-15015 April 2011 Attachments B-D, to L-11-107, Reply to Request for Additional Information for the Review of the Davis-Besse Nuclear Power Station, Unit No. 1, License Renewal Application ML1016006942010-06-10010 June 2010 G20100238/EDATS: OEDO-2010-0305 - Ltr. Tom Gurdziel, 2.206 - Firstenergy - Davis-Besse - T. Gurdziel Questions ML1017301232010-06-0909 June 2010 Green Ticket Tritium Releases ML1019304602010-03-25025 March 2010 List of Historical Leaks and Spills at Us Commercial Nuclear Power Plants ML0933507512010-01-14014 January 2010 Temporary Instruction 2515/180, Managing Fatigue ML0906500232009-03-0606 March 2009 Safety Culture Policy Statement (Safety & Security) Comments ML0904800182009-02-17017 February 2009 Public Comments Regarding the Safety Culture Policy Statement ML0906404392009-01-28028 January 2009 Enclosure 5: Case Study 1: Structure of TS for Ultrasonic Flow Meters - Meeting Summary of the January 27 & 28 Meeting with Nrc/Tstf ML0829101252008-11-20020 November 2008 ITSB R-Relocated Specifications - to Davis Besse Amendment Beyond Scope Issues ML0829007802008-11-20020 November 2008 ITSB L-Less Restrictive Changes - Attachment to Davis-Besse Amendment Beyond Scope Issues ML0829006832008-11-20020 November 2008 Table A-DOC Attachment - Administrative Changes - to Davis-Besse Amend. ITS with Beyond Scope Issues ML0829006302008-11-20020 November 2008 List of Acronyms to Davis-Besse Amend. Re; ITS with Beyond Scope Issues ML0829101122008-11-20020 November 2008 ITSB M - More Restrictive Changes - to Davis Besse Amendment Beyond Scope Issues ML0824902712008-10-0202 October 2008 List of Acronyms to Davis Besse Draft Amend. ITS Conversion L-08-241, Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs2008-08-26026 August 2008 Attachment 1, Applicable Portions of the U.S. Nuclear Regulatory Commission (NRC) and Davis-Besse Nuclear Power Station (DBNPS) Improved. Technical Specification (ITS) Conversion Website, Section 3.5 RAIs ML0803600792008-02-0101 February 2008 Attachment 1- DBNPS Steam Generator Inspections Data ML0802800442008-01-25025 January 2008 Special Inspection Evaluation, Basis for Investigatory Response Decision for a Significant Operational Power Reactor Event ML0732400242007-10-25025 October 2007 Examples of Max Thermal Power License Conditions ML0726301142007-09-14014 September 2007 / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 ML0726303192007-09-14014 September 2007 P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List ML0733801902007-06-27027 June 2007 Meeting Attendees, 6/27/07, Meeting with Firstenergy Nuclear Operating Company Regarding May 14, 2007, Demand for Information ML0634705992006-12-14014 December 2006 Plant Service List ML0535402852005-12-16016 December 2005 Issuance of Conforming Amendments for Bv, Units 1 and 2; Perry, Unit 1 and Davis-Besse, Unit 1 Transfer of Ownership Interests to Fengenco - Amendment 7 to Indemnity Agreement B-79 ML0530704422005-11-0808 November 2005 Proposal to Clean Incore Tunnel and Below Vessel - a Locked High Radiation Area ML0531302012005-04-21021 April 2005 Timeline for Enforcement Actions ML0423002112004-08-0505 August 2004 Submittal of Independent Assessment Plan for the Davis-Besse Nuclear Power Station Operations Performance, Revision 2 2022-02-10
[Table view] |
Text
Davis-Besse Reactor Vessel Head Talking points for TA briefing on 3/14/02 Licensee was requested to respond to Bulletin 2001-01, "Circumferential Cracking of Reactor Pressure Vessel Head Penetration Nozzles," dated 8/3/01. Refueling outage originally scheduled for 3131/02, but based on discussions regarding justification for operation beyond 12/31/01, the licensee committed to a shutdown beginning on 2/16/02 along with other commitments to reduce the risk of operation until then. This was contained in a letter dated 11/30/02. Based on the information in the letter the NRC determined that there was sufficient justification for operation to continue until 2/16/02 and this was documented in a letter to the licensee, dated 12/4/01.
The licensee began their refueling outage on 2/16/02. Through the Bulletin 2001-01 inspections, they identified one potential axial through wall indication on nozzle #3 on February 27 and similar indications on both nozzle #1 and #2 on March 4. Two other nozzles, #5 and #47 also showed indications, although not through wall. The licensee reported the through wall indications to the NRC according to 10 CFR 50.72. After all 69 nozzles were inspected, the licensee initiated repair plans, which included machining the weld and nozzle material for each of the 5 nozzles.
During repair efforts on nozzle #3 on March 5, the licensee identified a void adjacent to the nozzle. Subsequent investigation of the void revealed that it is approximately 10"X8" wide and as deep as 6 1/4" through the 6 5/8" thick vessel head. For a section of approximately 4"X5", the vessel head was reduced to only the thickness of the stainless steel cladding material (3/8"). The licensee reported this condition to the NRC on 3/8102 according to 10 CFR 50.72.
The licensee initiated several teams to investigate the issue. There was a root cause team and a separate repair team established immediately. The licensee has held daily calls with the NRC to provide a status update. The licensee has 2 members of the NEI Materials Reliability Program on site to evaluate generic implications. The licensee is also performing a risk assessment of the as-found condition.
The Region had a metallurgical specialist on site at the time as part of the Bulletin follow-up inspection. The resident inspectors also followed up on the licensee's initial inspection findings. The Region Ill office initiated plans for a special inspection on March 8, 2002. These plans were changed to an Augmented Inspection Team (AIT) on March 11, after more information was available regarding the extent of damage to the reactor vessel head.
The Region issued a PN on March 8, 2002 and issued a Press Release on March 12, 2002 to announce the start of an Augmented Inspection Team (AIT). The AIT entrance was held on March 12, 2002.
The licensee sent in a commitment letter on March 12 and the Region issued a CAL on March 13.
rnnr-rI'qoCAL-