Pacific Gas and Electric Company Lawrence F. Womack Diablo Canyon Power Plant Vice President P0 Box 56 Nuclear Services Avila Beach, CA 93424 December 13, 2002 8055454600 PG&E Letter DIL-02-012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 72-26 Diablo Canyon Independent Spent Fuel Storage Installation Submittal of Holtec Nonproprietary Reports
Dear Commissioners and Staff:
On December 21, 2001, Pacific Gas and Electric Company (PG&E) submitted an application to the Nuclear Regulatory Commission (NRC), in PG&E Letter DIL-01-002, requesting a site-specific license for an Independent Spent Fuel Storage Installation (ISFSI) at the Diablo Canyon Power Plant. The application included a Safety Analysis Report, Environmental Report, and other required documents in accordance with 10 CFR 72.
Pertinent Holtec International reports, prepared in support of the Diablo Canyon ISFSI license application, are enclosed as four nonproprietary attachments.
Proprietary versions of the reports were transmitted to the NRC in PG&E Letters DIL-02-007 dated June 4, 2002, and DIL-02-01 1, dated October 15, 2002. These reports are intended for use by the NRC staff in their review of the application.
If you have any questions regarding this matter, please contact Mr. Terence Grebel at (805) 595-6382.
Lawrence F. Womack gwh Enclosure cc:
Diablo Distribution Brian Gutherman cclenc:
James R. Hall David A. Repka
\\
A member of the STARS (Strategic Teaming and Resource Sharing) Atliance
,allawav
- Cxma*n*
ip Peak
- rlhln C*anvnn e Paln Verdep Rntith TpF-Ya Prnipd
- Wolf Crpek
Enclosure PG&E Letter DIL-02-012 Sheet 1 of 1 LIST OF HOLTEC NONPROPRIETARY REPORTS
- 1.
Holtec International Report No. HI-992252, Topical Report on the HI-STAR/HI STORM Thermal Model and its Benchmarking with Full-Size Cask Test Data
- 2.
Holtec International Report No. HI-2002474, Analysis of the Loaded HI-STORM 100 System Under Drop and Tipover Scenarios
- 3.
Holtec International Report No. HI-2002501, Functional Specification for the Diablo Canyon Cask Transporter
- 4.
Holtec International Report No. HI-2002570, Design Criteria Document for the Diablo Canyon Cask Transfer Facility