ML023540397

From kanterella
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Turkey Point Units 3 & 4
ML023540397
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/12/2002
From: Mcelwain J
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, L-2002-240
Download: ML023540397 (3)


Text

FPL U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthly Operating Report - November 2002 In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9.1.5, and the guidance of Generic Letter 97-02, attached are the November 2002 Operating Data Reports and Summaries of Operating Experience for Turkey Point Units 3 and 4.

Very truly yours, JnP.

McEiwain Vice President Turkey Point Plant DRL Attachments NRC Regulatory Issue Summary 2001-05 waived the requirements that multiple copies of documents be submitted to the NRC.

an FPL Group company DEC 1 2 2002 L-2002-240 10 CFR 50.36

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-250 Turkey Point Unit 3 12/3/2002 David Lafleur (305) 246-7150 Reporting Period November, 2002 OPERATING DATA REPORT Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net) 693 1-No. of hours reactor was critical Month 7201 8016 1 193795.8 No. of hours generator was on line (service hours) 720 8016 191464.5 Unit reserve shutdown hours 0

0 121.8 Net Electrical Energy (MWH) 1 516795 5676301 124819948 UNIT SHUTDOWNS No.

Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)

(1)

Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F -Administrative G - Operational Error (Explain)

H - Other (2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summary Of Monthly Operating Experience Unit 3 operated at essentially 100% power for the month of November 2002.

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE:

50-251 Turkey Point Unit 4 12/3/2002 David Lafleur

"(305) 246-7150 Reporting Period November, 2002 Design Electrical Rating (MWe-Net) 720 Maximum Dependable Capacity (MWe-Net)

-693 Month Year-to-date Cumulative No. of hours reactor was critical 720 7649.2 190618.7 No. of hours generator was on line (service hours) 720 7626.1 186201.2 Unit reserve shutdown hours 0

0 577.2 Net Electrical Energy (MWH) 516157 5318001 122423012 UNIT SHUTDOWNS No.

Date Type Duration Reason Method of Corrective Action/ Comments F=Forced (hours)

(1)

Shutting S=Scheduled Down (2)

N/A N/A N/A N/A N/A N/A N/A (1) Reason A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operator Training/License Examination F - Administrative G - Operational Error (Explain)

H - Other (2) Method 1 - Manual 2 - Manual Trip/Scram 3 - Automatic Trip/Scram 4 - Continuation 5 - Other (Explain)

Summary Of Monthly Operating Experience Unit 4 operated at essentially 100% power for the month of November 2002.