ML023540256

From kanterella
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Vogtle Units 1 & 2
ML023540256
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/13/2002
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LCV-1593-K
Download: ML023540256 (5)


Text

7.

Jeffrey T. Gasser Southern Nuclear Vice President Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205 992 0403 S U E

SSOUTHERN COMPANY Energy to Serve Your Wo rld December 13, 2002 LCV-1593-K Docket Nos.

50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555 Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT MONTHLY OPERATING REPORT - NOVEMBER 2002 Enclosed are the November 2002 monthly operating reports for Vogtle Electric Generating Plant (VEGP) Units I and 2. These reports are submitted in accordance with Technical Specification 5.6.4.

Sincerely, Jeffrey T. Gasser JTG/NJS Enclosures El - VEGP Unit 1 Monthly Operating Report - November 2002 E2 - VEGP Unit 2 Monthly Operating Report - November 2002 xc:

Southern Nuclear Operating Company Mr. M. Sheibani SNC Document Management U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, Project Manager, NRR Mr. J. Zeiler, Senior Resident Inspector, Vogtle

¶ OPERATING DATA REPORT 50-424 VEGP UNIT 1 December 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status Reporting Period Design Electrical Rating (Net MWe)"

Maximum Dependable Capacity (Net MWe)

Number Of Hours Reactor Was Critical.

Hours Generator On Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWHe)

November 2002 1169 1148 This Month 575 6 574 3 0.0 669,182 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date (YYMMDD)

Tag No Event Description N/A NIA N/A El-1 Docket No*

Unit Name:

Date Completed By.

Telephone

1.
2.
3.

4 5

6 7.

Year-To-Date 6823 6 67604 00 7,857,703 Cumulative 121,433 1 119,9130 00 134,303,769

UNIT SHUTDOWNS Reporting Period:

Docket No:

Unit Name:

Date Completed By Telephone, 50-424 VEGP UNIT 1 December 1, 2002 Andrew R Cato (706) 826-3823 November 2002 Type Method of F. Forced Duration Shutting Cause/Corrective Actions No Date (YYMMDD)

S: Scheduled (Hours)

Reason (1)

Down (2)

Comments 2002-04 02/11/24 F

1457 F

I See Below (1) REASON (2) METHOD A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Trip/Scram
5. Other C - Refueling G - Operational Error (Explain) 3 Automatic Tnp/Scram D - Regulatory Restnction H - Other (Explain)

CAUSE/CORRECTIVE ACTION/COMMENTS:

EVENT 2002-04 CAUSE Forced shutdown of the reactor after incorrect chemicals added to the feedwater system CORRECTIVE ACTION Remove the chemicals through flushing the system CRITICAL PATH WAS Remove the chemicals through flushing the system and complete prerequisites for mode changes.

NARRATIVE REPORT November 01 00 00 Unit 1 at 100% power with no significant operating problems.

November 20 23 00 Unit 1 derated to approximately 95% power for planned condensate demineralizer work.

November 21 0600 Unit 1 returned to 100% power after the planned condensate demineralizer work.

November 24 22 18 Unit I at 100% reactor manually shutdown due to incorrect chemicals injected into the feedwater system November 24 23 13 Unit I entered mode 2.

November 24 23 34 Unit I entered mode 3.

November 25 21:15 Unit I entered mode 4.

November 26 03 05 Unit I entered mode 5.

November 27 21 41 Unit I entered mode 4.

November 28 04 05 Unit 1 entered mode 3 November 30 23 59 Unit 1 in mode 3 prepanng for return to power operation E1-2

OPERATING DATA REPORT Docket No:

Unit Name Date:

Completed By:

Telephone:

50-425 VEGP UNIT 2 December 1, 2002 Andrew R. Cato (706) 826-3823 Operating Status

1. Reporting Period.

2 Design Electrical Rating (Net MWe) 3 Maximum Dependable Capacity (Net MWe) 4 5

6 7

Number Of Hours Reactor Was Critical Hours Generator On Line Unit Reserve Shutdown Hours Net Electrical Energy Generated (MWHe)

November 2002 1169 1149 This Month 240 0 198.1 0.0 182,836 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES Date (YYMMDD)

Tag No Event Description N/A N/A NIA E2-1 Year-To-Date 69134 6871 1 00 7,965,819 Cumulative 107,967.2 107,111 8 0.0 120,758,285

UNIT SHUTDOWNS Reporting Period:

I Docket No:

Unit Name:

Date Completed By Telephone:

50-425 VEGP UNIT 2 December 1, 2002 Andrew R Cato (706) 826-3823 November 2002 Type Method of F: Forced Duration Shutting Cause/Corrective Actions No.

Date (YYMMDD)

S: Scheduled (Hours)

Reason (1)

Down (2)

Comments 2002-01 02/10106 S

373 1 C

4 See Below 2002-02 02/11116 S

11 B

2 See Below 2002-03 02/11/24 S

1477 B

2 See Below (1) REASON.

(2) METHOD A - Equipment Failure (Explain)

E - Operator Training/License Examination

1. Manual
4. Continuation B - Maintenance or Test F - Administrative
2. Manual Tnp/Scram
5. Other C - Refueling G - Operational Error (Explain)
3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)

CAUSE/CORRECTIVE ACTIONICOMMENTS:

EVENT 2002-01 CAUSE*

Scheduled Refueling Outage CORRECTIVE ACTION-Cooldown to 110 Deg F, vessel disassembly, fuel off load, mid-loop maintenance, re-load in core, reassemble vessel, fill and vent reactor vessel, and complete prerequisites for mode changes.

CRITICAL PATH WAS Vessel disassembly, fuel off load, mid-loop work, fuel load and vessel reassembly, and Main Generator Rewind EVENT 2002-02 CAUSE:

Scheduled Turbine Overspeed Trip Surveillance Test CORRECTIVE ACTION Performed Overspeed Trip Test CRITICAL PATH WAS Overspeed Trip Test EVENT*

2002-03 CAUSE-Forced shutdown of the reactor after incorrect chemicals were added to the feedwater system CORRECTIVE ACTION Remove the chemicals through flushing the system CRITICAL PATH WAS Remove the chemicals through flushing the system and complete prerequisites for mode changes NARRATIVE REPORT E2-2 November 01 00 00 Unit 2 in mode 6 Reactor fuel load suspended due to RHR problem November 01 19.52 Unit 2 in mode 6. Reactor fuel load in progress November 02 08:44 Unit 2 in mode 6 Core reload complete November 06 04.06 Unit 2 entered mode 5 November 09 21:30 Unit 2 entered mode 4.

November 11 02.14 Unit 2 entered mode 3 November 12 03 39 Unit 2 entered mode 2.

November 12 05 45 Unit 2 reactor is cntical November 12 22.28 Unit 2 entered mode 1.

November 13 04 07 Unit 2 reactor Is manually tnpped due to high steam generator water level Unit in mode 3 (LER 2-2002-02)

November 15 17.28 Unit 2 entered mode 2.

November 15 18 24 Unit 2 reactor is critical.

November 16 00 12 Unit 2 entered mode 1.

November 16 12 32 Unit 2 main generator synchronized to grid.

November 16 20 43 Unit 2 Turbine Overspeed Trip Test Surveillance.

November 16 21:48 Unit 2 main generator synchronized to grid.

November 19 15 00 Unit 2 at 100% power.

November 24 19 44 Unit 2 reactor manually shutdown/turbine tripped due to incorrect chemicals Injected Into feedwater system November 24 19.47 Unit 2 entered mode 2.

November 24 20 01 Unit 2 entered mode 3 November 25 20 51 Unit 2 entered mode 4 November 26 01 38 Unit 2 entered mode 5 November 28 17.03 Unit 2 entered mode 4.

November 30 21 48 Unit 2 entered mode 3.

November 30 23 59 Unit 2 In mode 3 preparing for return to power operation